If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0314252009002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.672582,"lon":-113.502416,"icon":""}]} |
Location: 00/09-20-031-25W4/2 | |
Location Alias: 00/09-20-31-25 W4M | |
Location Alias 2: 00/09-20-031-25 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 031 | |
Meridian: 4 | |
Range: 25 | |
Section: 20 | |
County/Municipality: Kneehill County | |
Well Name: EMBER TWINING 9-20-31-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0402755 | |
License Date: 2008-10-24 | |
License Status: Suspension | |
Spud Date: 2008-11-22 | |
Final Drill Date: 2008-11-23 | |
Well Total Depth: 1026.00 m | |
Surface Hole Latitude: 51.672582 | |
Surface Hole Longitude: -113.502416 |
Date | Event |
---|---|
2008-10-24 | Obtained License |
2008-11-22 | Surface Casing Operation Performed |
2008-11-23 | Finished Drilling |
2008-11-23 | Production Casing Operation Performed |
2008-11-23 | Well Mode changed to Drilled and Cased |
2008-11-24 | Well Log Performed |
2008-11-25 | Rig Released |
2009-02-14 | Well Log Performed |
2009-03-12 | Perforation Treatment Performed - Jet Perforation |
2009-03-16 | Perforation Treatment Performed - Jet Perforation |
2009-06-14 | Perforation Treatment Performed - Jet Perforation |
2009-06-17 | Perforation Treatment Performed - Fractured |
2009-06-24 | Well Began Production |
2009-06-24 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-06-24 | Well Mode changed to Flowing |
2012-08-15 | Well Fluid changed to Gas |
2012-08-15 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-03-12 | Perforation | 1012.50 | 1014.50 | 17 |
2009-06-14 | Perforation | 607.00 | 609.00 | 13 |
2009-06-14 | Perforation | 596.00 | 598.50 | 13 |
2009-06-14 | Perforation | 585.40 | 585.80 | 13 |
2009-06-14 | Perforation | 582.20 | 583.00 | 13 |
2009-06-14 | Perforation | 574.30 | 574.80 | 13 |
2009-06-14 | Perforation | 536.30 | 538.10 | 13 |
2009-06-14 | Perforation | 534.20 | 535.20 | 13 |
2009-06-14 | Perforation | 529.00 | 529.50 | 13 |
2009-06-14 | Perforation | 483.50 | 483.90 | 13 |
2009-06-14 | Perforation | 419.40 | 420.00 | 13 |
2009-03-16 | Perforation | 927.00 | 930.00 | 17 |
2009-06-14 | Perforation | 306.50 | 306.90 | 13 |
2009-06-14 | Perforation | 285.30 | 286.00 | 13 |
2009-06-14 | Perforation | 266.30 | 267.00 | 13 |
2009-06-14 | Perforation | 245.00 | 248.50 | 13 |
2009-06-17 | Fracture | 245.00 | 691.70 | 0 |
2009-03-16 | Perforation | 902.00 | 906.00 | 17 |
2009-06-14 | Perforation | 691.40 | 691.70 | 13 |
2009-06-14 | Perforation | 686.20 | 686.80 | 13 |
2009-06-14 | Perforation | 675.90 | 677.30 | 13 |
2009-06-14 | Perforation | 656.00 | 658.70 | 13 |
2009-06-14 | Perforation | 642.00 | 643.00 | 13 |
2009-06-14 | Perforation | 629.10 | 629.40 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 2100 | 0.0 | 0.0 | 0.0 |
2010 | 504 | 0.0 | 0.0 | 0.0 |
2011 | 384 | 0.0 | 0.0 | 0.0 |
For data sources see[5]