If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0314251307022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.652596,"lon":-113.413327,"icon":""}]} |
Location: 02/07-13-031-25W4/2 | |
Location Alias: 02/07-13-31-25 W4M | |
Location Alias 2: 02/07-13-031-25 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 031 | |
Meridian: 4 | |
Range: 25 | |
Section: 13 | |
County/Municipality: Kneehill County | |
Well Name: EMBER 102 TWINING 7-13-31-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0232096 | |
License Date: 2000-01-16 | |
License Status: Amended | |
Spud Date: 2000-02-02 | |
Final Drill Date: 2000-02-08 | |
Well Total Depth: 1003.00 m | |
Surface Hole Latitude: 51.652596 | |
Surface Hole Longitude: -113.413327 |
Date | Event |
---|---|
2000-01-16 | Obtained License |
2000-02-03 | Surface Casing Operation Performed |
2000-02-06 | Drill Stem Test Performed |
2000-02-06 | Well Log Performed |
2000-02-07 | Production Casing Operation Performed |
2000-02-08 | Finished Drilling |
2000-02-08 | Rig Released |
2000-02-08 | Well Mode changed to Drilled and Cased |
2000-02-18 | Well Log Performed |
2000-02-20 | Perforation Treatment Performed - Jet Perforation |
2000-02-20 | Well Mode changed to Drilled and Cased |
2000-02-24 | Perforation Treatment Performed - Fractured |
2000-02-25 | Perforation Treatment Performed - Fractured |
2001-01-06 | Perforation Treatment Performed - Cement Squeeze |
2001-01-06 | Plug Back Performed |
2001-01-06 | Well Mode changed to Abandoned Zone |
2001-01-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-01-09 | Perforation Treatment Performed - Jet Perforation |
2001-01-09 | Plug Back Performed |
2001-03-22 | Perforation Treatment Performed - Jet Perforation |
2004-03-22 | Perforation Treatment Performed - Jet Perforation |
2004-03-22 | Well Log Performed |
2004-03-24 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2000-02-20 | Perforation | 913.00 | 916.00 | 20 |
2001-01-09 | Perforation | 723.00 | 724.00 | 14 |
2001-03-22 | Perforation | 526.80 | 527.80 | 13 |
2004-03-22 | Perforation | 624.00 | 625.00 | 13 |
2004-03-22 | Perforation | 613.50 | 614.50 | 13 |
2004-03-22 | Perforation | 607.50 | 608.50 | 13 |
2004-03-22 | Perforation | 602.90 | 603.90 | 13 |
2004-03-22 | Perforation | 583.70 | 584.70 | 13 |
2004-03-22 | Perforation | 573.20 | 574.20 | 13 |
2004-03-22 | Perforation | 560.70 | 561.70 | 13 |
2004-03-22 | Perforation | 530.00 | 532.00 | 13 |
2000-02-20 | Perforation | 886.50 | 889.50 | 20 |
2004-03-22 | Perforation | 522.80 | 523.80 | 13 |
2004-03-22 | Perforation | 520.70 | 521.70 | 13 |
2004-03-22 | Perforation | 515.90 | 516.90 | 13 |
2004-03-22 | Perforation | 480.20 | 481.20 | 13 |
2004-03-22 | Perforation | 478.20 | 479.30 | 13 |
2004-03-22 | Perforation | 474.60 | 475.60 | 13 |
2004-03-22 | Perforation | 466.60 | 467.60 | 13 |
2004-03-22 | Perforation | 460.00 | 461.00 | 13 |
2004-03-22 | Perforation | 406.20 | 407.20 | 13 |
2004-03-22 | Perforation | 361.30 | 362.30 | 13 |
2000-02-20 | Perforation | 701.00 | 704.00 | 20 |
2004-03-22 | Perforation | 357.80 | 358.80 | 13 |
2004-03-22 | Perforation | 248.80 | 249.80 | 13 |
2004-03-22 | Perforation | 236.00 | 239.00 | 13 |
2004-03-22 | Perforation | 212.90 | 213.90 | 13 |
2004-03-24 | Fracture | 212.90 | 625.00 | 0 |
2000-02-24 | Fracture | 701.00 | 704.00 | 0 |
2000-02-25 | Fracture | 913.00 | 916.00 | 0 |
2000-02-25 | Fracture | 886.50 | 889.50 | 0 |
2001-01-06 | Cement Squeeze | 701.00 | 704.00 | 0 |
2001-01-09 | Packing Device Capped w/Cement | 857.00 | 865.00 | 0 |
2001-01-09 | Perforation | 719.00 | 722.00 | 14 |
For data sources see[4]