X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314250904002

Well Details

Well ID: 0314250904002
Loading map...
Location: 00/04-09-031-25W4/2
Location Alias: 00/04-09-31-25 W4M
Location Alias 2: 00/04-09-031-25 W4/02
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 25
Section: 09
County/Municipality: Kneehill County
Well Name: ARTIS ET AL HZ TWINING 4-9-31-25
Operator Name: Artis Exploration Ltd.
License Number: 0489773
License Date: 2018-06-27
License Status: Amended
Spud Date: 2018-07-03
Final Drill Date: 2018-07-23
Well Total Depth: 5575.00 m
Surface Hole Latitude: 51.665362
Surface Hole Longitude: -113.498014

For data sources see[1][2]

Well History

Date Event
2018-06-27 Obtained License
2018-07-03 Surface Casing Operation Performed
2018-07-06 Intermediate Casing Operation Performed
2018-07-13 Direction Drilling Operation Performed - Horizontal
2018-07-16 Well Log Performed
2018-07-23 Finished Drilling
2018-07-23 Well Log Performed
2018-07-23 Well Mode changed to Drilled and Cased
2018-07-25 Production Casing Operation Performed
2018-07-26 Rig Released
2018-08-23 Perforation Treatment Performed - Jet Perforation
2018-08-23 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-24 Perforation Treatment Performed - Jet Perforation
2018-08-24 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-25 Perforation Treatment Performed - Jet Perforation
2018-08-25 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-26 Perforation Treatment Performed - Jet Perforation
2018-08-26 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-27 Perforation Treatment Performed - Jet Perforation
2018-08-27 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-28 Perforation Treatment Performed - Jet Perforation
2018-08-28 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-31 Perforation Treatment Performed - Jet Perforation
2018-08-31 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-01 Perforation Treatment Performed - Jet Perforation
2018-09-01 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-02 Perforation Treatment Performed - Jet Perforation
2018-09-02 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-03 Perforation Treatment Performed - Jet Perforation
2018-09-03 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-04 Perforation Treatment Performed - Jet Perforation
2018-09-04 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-05 Perforation Treatment Performed - Jet Perforation
2018-09-05 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-12 Well Began Production
2018-09-12 Well Fluid changed to Crude Oil
2018-09-12 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2018-07-13 2110.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-08-23 Multi-Stage Fracture 5495.00 5525.00 0
2018-08-24 Perforation 5377.50 5378.00 7
2018-08-28 Perforation 4279.50 4280.00 7
2018-08-28 Multi-Stage Fracture 4279.50 4325.80 0
2018-08-28 Perforation 4264.30 4264.80 7
2018-08-28 Perforation 4249.00 4249.50 7
2018-08-28 Perforation 4233.80 4234.30 7
2018-08-28 Perforation 4218.50 4219.00 7
2018-08-28 Multi-Stage Fracture 4218.50 4264.80 0
2018-08-31 Perforation 4203.30 4203.80 7
2018-08-31 Perforation 4188.00 4188.50 7
2018-08-31 Perforation 4172.80 4173.30 7
2018-08-24 Multi-Stage Fracture 5377.50 5423.80 0
2018-08-31 Perforation 4157.50 4158.00 7
2018-08-31 Multi-Stage Fracture 4157.50 4203.80 0
2018-08-31 Perforation 4142.30 4142.80 7
2018-08-31 Perforation 4127.00 4127.50 7
2018-08-31 Perforation 4111.80 4112.30 7
2018-08-31 Perforation 4096.50 4097.00 7
2018-08-31 Multi-Stage Fracture 4096.50 4142.80 0
2018-08-31 Perforation 4081.30 4081.80 7
2018-08-31 Perforation 4066.00 4066.50 7
2018-08-31 Perforation 4050.80 4051.30 7
2018-08-24 Perforation 5362.30 5362.80 7
2018-08-31 Perforation 4035.50 4036.00 7
2018-08-31 Multi-Stage Fracture 4035.50 4081.80 0
2018-09-01 Perforation 4020.30 4020.80 7
2018-09-01 Perforation 4005.00 4005.50 7
2018-09-01 Perforation 3989.80 3990.30 7
2018-09-01 Perforation 3974.50 3975.00 7
2018-09-01 Multi-Stage Fracture 3974.50 4020.80 0
2018-09-01 Perforation 3959.30 3959.80 7
2018-09-01 Perforation 3944.00 3944.50 7
2018-09-01 Perforation 3928.80 3929.30 7
2018-08-24 Perforation 5347.00 5347.50 7
2018-09-01 Perforation 3913.50 3914.00 7
2018-09-01 Multi-Stage Fracture 3913.50 3959.80 0
2018-09-01 Perforation 3898.30 3898.80 7
2018-09-01 Perforation 3883.00 3883.50 7
2018-09-01 Perforation 3867.80 3868.30 7
2018-09-01 Perforation 3852.50 3853.00 7
2018-09-01 Multi-Stage Fracture 3852.50 3898.80 0
2018-09-01 Perforation 3837.30 3837.80 7
2018-09-01 Perforation 3822.00 3822.50 7
2018-09-01 Perforation 3806.80 3807.30 7
2018-08-24 Perforation 5331.80 5332.30 7
2018-09-01 Perforation 3791.50 3792.00 7
2018-09-01 Multi-Stage Fracture 3791.50 3837.80 0
2018-09-02 Perforation 3776.30 3776.80 7
2018-09-02 Perforation 3761.00 3761.50 7
2018-09-02 Perforation 3745.80 3746.30 7
2018-09-02 Perforation 3730.50 3731.00 7
2018-09-02 Multi-Stage Fracture 3730.50 3776.80 0
2018-09-02 Perforation 3715.30 3715.80 7
2018-09-02 Perforation 3700.00 3700.50 7
2018-09-02 Perforation 3684.80 3685.30 7
2018-08-24 Perforation 5316.50 5317.00 7
2018-09-02 Perforation 3669.50 3670.00 7
2018-09-02 Multi-Stage Fracture 3669.50 3715.80 0
2018-09-02 Perforation 3654.30 3654.80 7
2018-09-02 Perforation 3639.00 3639.50 7
2018-09-02 Perforation 3623.80 3624.30 7
2018-09-02 Perforation 3608.50 3609.00 7
2018-09-02 Multi-Stage Fracture 3608.50 3654.80 0
2018-09-02 Perforation 3593.30 3593.80 7
2018-09-02 Perforation 3578.00 3578.50 7
2018-09-02 Perforation 3562.80 3563.30 7
2018-08-24 Multi-Stage Fracture 5316.50 5362.80 0
2018-09-02 Perforation 3547.50 3548.00 7
2018-09-02 Multi-Stage Fracture 3547.50 3593.80 0
2018-09-03 Perforation 3532.30 3532.80 7
2018-09-03 Perforation 3517.00 3517.50 7
2018-09-03 Perforation 3501.80 3502.30 7
2018-09-03 Perforation 3486.50 3487.00 7
2018-09-03 Multi-Stage Fracture 3486.50 3532.80 0
2018-09-03 Perforation 3471.30 3471.80 7
2018-09-03 Perforation 3456.00 3456.50 7
2018-09-03 Perforation 3440.80 3441.30 7
2018-08-24 Perforation 5301.30 5301.80 7
2018-09-03 Perforation 3425.50 3426.00 7
2018-09-03 Multi-Stage Fracture 3425.50 3471.80 0
2018-09-03 Perforation 3410.30 3410.80 7
2018-09-03 Perforation 3395.00 3395.50 7
2018-09-03 Perforation 3379.80 3380.30 7
2018-09-03 Perforation 3364.50 3365.00 7
2018-09-03 Multi-Stage Fracture 3364.50 3410.80 0
2018-09-03 Perforation 3349.30 3349.80 7
2018-09-03 Perforation 3334.00 3334.50 7
2018-09-03 Perforation 3318.80 3319.30 7
2018-08-24 Perforation 5286.00 5286.50 7
2018-09-03 Perforation 3303.50 3304.00 7
2018-09-03 Multi-Stage Fracture 3303.50 3349.80 0
2018-09-03 Perforation 3288.30 3288.80 7
2018-09-03 Perforation 3273.00 3273.50 7
2018-09-03 Perforation 3257.80 3258.30 7
2018-09-03 Perforation 3242.50 3243.00 7
2018-09-03 Multi-Stage Fracture 3242.50 3288.80 0
2018-09-04 Perforation 3227.30 3227.80 7
2018-09-04 Perforation 3212.00 3212.50 7
2018-09-04 Perforation 3196.80 3197.30 7
2018-08-24 Perforation 5270.80 5271.30 7
2018-09-04 Perforation 3181.50 3182.00 7
2018-09-04 Multi-Stage Fracture 3181.50 3227.80 0
2018-09-04 Perforation 3166.30 3166.80 7
2018-09-04 Perforation 3151.00 3151.50 7
2018-09-04 Perforation 3135.80 3136.30 7
2018-09-04 Perforation 3120.50 3121.00 7
2018-09-04 Multi-Stage Fracture 3120.50 3166.80 0
2018-09-04 Perforation 3105.30 3105.80 7
2018-09-04 Perforation 3090.00 3090.50 7
2018-09-04 Perforation 3074.80 3075.30 7
2018-08-23 Perforation 5485.00 5485.50 7
2018-08-24 Perforation 5255.50 5256.00 7
2018-09-04 Perforation 3059.50 3060.00 7
2018-09-04 Multi-Stage Fracture 3059.50 3105.80 0
2018-09-04 Perforation 3044.30 3044.80 7
2018-09-04 Perforation 3029.00 3029.50 7
2018-09-04 Perforation 3013.80 3014.30 7
2018-09-04 Perforation 2998.50 2999.00 7
2018-09-04 Multi-Stage Fracture 2998.50 3044.80 0
2018-09-04 Perforation 2983.30 2983.80 7
2018-09-04 Perforation 2968.00 2968.50 7
2018-09-04 Perforation 2952.80 2953.30 7
2018-08-24 Multi-Stage Fracture 5255.50 5301.80 0
2018-09-04 Perforation 2937.50 2938.00 7
2018-09-04 Multi-Stage Fracture 2937.50 2983.80 0
2018-09-04 Perforation 2922.30 2922.80 7
2018-09-04 Perforation 2907.00 2907.50 7
2018-09-04 Perforation 2891.80 2892.30 7
2018-09-04 Perforation 2876.50 2877.00 7
2018-09-04 Multi-Stage Fracture 2876.50 2922.80 0
2018-09-05 Perforation 2861.30 2861.80 7
2018-09-05 Perforation 2846.00 2846.50 7
2018-09-05 Perforation 2830.80 2831.30 7
2018-08-24 Perforation 5240.30 5240.80 7
2018-09-05 Perforation 2815.50 2816.00 7
2018-09-05 Multi-Stage Fracture 2815.50 2861.80 0
2018-09-05 Perforation 2795.50 2796.00 7
2018-09-05 Perforation 2775.50 2776.00 7
2018-09-05 Perforation 2755.50 2756.00 7
2018-09-05 Perforation 2735.50 2736.00 7
2018-09-05 Multi-Stage Fracture 2735.50 2796.00 0
2018-09-05 Perforation 2715.50 2716.00 7
2018-09-05 Perforation 2695.50 2696.00 7
2018-09-05 Perforation 2675.50 2676.00 7
2018-08-24 Perforation 5225.00 5225.50 7
2018-09-05 Perforation 2655.50 2656.00 7
2018-09-05 Multi-Stage Fracture 2655.50 2716.00 0
2018-09-05 Perforation 2635.50 2636.00 7
2018-09-05 Perforation 2615.50 2616.00 7
2018-09-05 Perforation 2595.50 2596.00 7
2018-09-05 Perforation 2575.50 2576.00 7
2018-09-05 Multi-Stage Fracture 2575.50 2636.00 0
2018-08-24 Perforation 5209.80 5210.30 7
2018-08-24 Perforation 5194.50 5195.00 7
2018-08-24 Multi-Stage Fracture 5194.50 5240.80 0
2018-08-24 Perforation 5179.30 5179.80 7
2018-08-24 Perforation 5164.00 5164.50 7
2018-08-24 Perforation 5148.80 5149.30 7
2018-08-23 Perforation 5469.00 5469.50 7
2018-08-24 Perforation 5133.50 5134.00 7
2018-08-24 Multi-Stage Fracture 5133.50 5179.80 0
2018-08-25 Perforation 5118.30 5118.80 7
2018-08-25 Perforation 5103.00 5103.50 7
2018-08-25 Perforation 5087.80 5088.30 7
2018-08-25 Perforation 5072.50 5073.00 7
2018-08-25 Multi-Stage Fracture 5072.50 5118.80 0
2018-08-25 Perforation 5057.30 5057.80 7
2018-08-25 Perforation 5042.00 5042.50 7
2018-08-25 Perforation 5026.80 5027.30 7
2018-08-23 Perforation 5453.80 5454.30 7
2018-08-25 Perforation 5011.50 5012.00 7
2018-08-25 Multi-Stage Fracture 5011.50 5057.80 0
2018-08-25 Perforation 4996.30 4996.80 7
2018-08-25 Perforation 4981.00 4981.50 7
2018-08-25 Perforation 4965.80 4966.30 7
2018-08-25 Perforation 4950.50 4951.00 7
2018-08-25 Multi-Stage Fracture 4950.50 4996.80 0
2018-08-25 Perforation 4935.30 4935.80 7
2018-08-25 Perforation 4920.00 4920.50 7
2018-08-25 Perforation 4904.80 4905.30 7
2018-08-23 Perforation 5438.50 5439.00 7
2018-08-25 Perforation 4889.50 4890.00 7
2018-08-25 Multi-Stage Fracture 4889.50 4935.80 0
2018-08-26 Perforation 4874.30 4874.80 7
2018-08-26 Perforation 4859.00 4859.50 7
2018-08-26 Perforation 4843.80 4844.30 7
2018-08-26 Perforation 4828.50 4829.00 7
2018-08-26 Multi-Stage Fracture 4828.50 4874.80 0
2018-08-26 Perforation 4813.30 4813.80 7
2018-08-26 Perforation 4798.00 4798.50 7
2018-08-26 Perforation 4782.80 4783.30 7
2018-08-23 Multi-Stage Fracture 5438.50 5485.50 0
2018-08-26 Perforation 4767.50 4768.00 7
2018-08-26 Multi-Stage Fracture 4767.50 4813.80 0
2018-08-26 Perforation 4752.30 4752.80 7
2018-08-26 Perforation 4737.00 4737.50 7
2018-08-26 Perforation 4721.80 4722.30 7
2018-08-26 Perforation 4706.50 4707.00 7
2018-08-26 Multi-Stage Fracture 4706.50 4752.80 0
2018-08-26 Perforation 4691.30 4691.80 7
2018-08-26 Perforation 4676.00 4676.50 7
2018-08-26 Perforation 4660.80 4661.30 7
2018-08-24 Perforation 5423.30 5423.80 7
2018-08-26 Perforation 4645.50 4646.00 7
2018-08-26 Multi-Stage Fracture 4645.50 4691.80 0
2018-08-27 Perforation 4630.30 4630.80 7
2018-08-27 Perforation 4615.00 4615.50 7
2018-08-27 Perforation 4599.80 4600.30 7
2018-08-27 Perforation 4584.50 4585.00 7
2018-08-27 Multi-Stage Fracture 4584.50 4630.80 0
2018-08-27 Perforation 4569.30 4569.80 7
2018-08-27 Perforation 4554.00 4554.50 7
2018-08-27 Perforation 4538.80 4539.30 7
2018-08-24 Perforation 5408.00 5408.50 7
2018-08-27 Perforation 4523.50 4524.00 7
2018-08-27 Multi-Stage Fracture 4523.50 4569.80 0
2018-08-27 Perforation 4508.30 4508.80 7
2018-08-27 Perforation 4493.00 4493.50 7
2018-08-27 Perforation 4477.80 4478.30 7
2018-08-27 Perforation 4462.50 4463.00 7
2018-08-27 Multi-Stage Fracture 4462.50 4508.80 0
2018-08-28 Perforation 4447.30 4447.80 7
2018-08-28 Perforation 4432.00 4432.50 7
2018-08-28 Perforation 4416.80 4417.30 7
2018-08-24 Perforation 5392.80 5393.30 7
2018-08-28 Perforation 4401.50 4402.00 7
2018-08-28 Multi-Stage Fracture 4401.50 4447.80 0
2018-08-28 Perforation 4386.30 4386.80 7
2018-08-28 Perforation 4371.00 4371.50 7
2018-08-28 Perforation 4355.80 4356.30 7
2018-08-28 Perforation 4340.50 4341.00 7
2018-08-28 Multi-Stage Fracture 4340.50 4386.80 0
2018-08-28 Perforation 4325.30 4325.80 7
2018-08-28 Perforation 4310.00 4310.50 7
2018-08-28 Perforation 4294.80 4295.30 7

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-08-23 2018-09-05 2,401 46,196 N/A
2 2018-08-24 2018-09-05 2,401 0 N/A
3 2018-08-24 2018-08-31 2,401 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 89.6235 N/A
40/70 Domestic Sand Step Energy Services Crystalline Silica 14808-60-7 100 3.5355 N/A
50/140 Domestic Sand Step Energy Services Crystalline Silica 14808-60-7 100 0.464 N/A
15% HCL Acid Step Energy Services Acid Hydrochloric Acid 7647-01-0 100 0.5965 N/A
Water 7732-18-5 100 0.5965 N/A
SAB-1 Acid Blend Step Energy Services Acid Acetic Acid 64-19-7 100 0.0061 N/A
Ethylene Glycol 107-21-1 100 0.0061 N/A
Methyl Alcohol 67-56-1 100 0.0061 N/A
Non Hazardous Ingredients Not Available 100 0.0061 N/A
Propan-2-ol 67-63-0 100 0.0061 N/A
Aqucar 742 (Biocide) Step Energy Services Bactericide/Biocide Ethanol 64-17-5 100 0.0127 N/A
Glutaraldehyde 111-30-8 100 0.0127 N/A
Methanol 67-56-1 100 0.0127 N/A
Non-Hazardous Ingredients Not Available 100 0.0127 N/A
Quaternary ammonium compounds.
benzyl-C12-16-alkyldimethyl. chlorides
68424-85-1 100 0.0127 N/A
SCBO-2 (Breaker) Step Energy Services Breaker Ammonium Persulfate 7727-54-0 100 0.0104 N/A
Cured Acrylic Resin Not Available 100 0.0104 N/A
Non-Hazardous Ingredients Not Available 100 0.0104 N/A
SBH-1 (Buffer) Step Energy Services Buffer Non-Hazardous Ingredients Not Available 100 0.0039 N/A
Potassium Carbonate 584-08-7 100 0.0039 N/A
Potassium Hydroxide 1310-58-3 100 0.0039 N/A
SBX-1 (Crosslinker) Step Energy Services Crosslinker Boric Acid 10043-35-3 100 0.0203 N/A
Ethylene Glycol 107-21-1 100 0.0203 N/A
Non-Hazardous Ingredients Not Available 100 0.0203 N/A
Potassium Carbonate 584-08-7 100 0.0203 N/A
Potassium Hydroxide 1310-58-3 100 0.0203 N/A
SFR-106 (Friction Reducer) Step Energy Services Friction Reducer Ethoxylated Alcohol 78330-21-9 100 0.059 N/A
Non-Hazardous Ingredients Not Available 100 0.059 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.059 N/A
SWG-101 (Gellant) Step Energy Services Gelling Agent Guar gum 9000-30-0 100 0.1386 N/A
SSI-1 (Scale Inhibitor) Step Energy Services Scale Inhibitor Methyl Alcohol 67-56-1 100 0.0143 N/A
Non-Hazardous Ingredients Not Available 100 0.0143 N/A
SAS-4 (Anti-Sludge) Step Energy Services Surfactant 1.1' - Oxybisbenzene. tetrapropylene dervis. sulfonated 119345-03-8 100 0.0028 N/A
Alkylbenzene sulfonic acid 27176-87-0 100 0.0028 N/A
Methanol 67-56-1 100 0.0028 N/A
Xylene 1330-20-7 100 0.0028 N/A
SNE-2 (Non-Emulsifier) Step Energy Services Surfactant 2-Ethylhexanol distillation residue 68609-68-7 100 0.0882 N/A
Dodecylbenzene Sulfonic Acid 27176-87-0 100 0.0882 N/A
Methanol 67-56-1 100 0.0882 N/A
Monoethanolamine 141-43-5 100 0.0882 N/A
Oxirane. methyl-. polymer 11/6/9003 100 0.0882 N/A
Poly(oxy-1.2-ethanediyl). alphaisotridecyl-omega-hydroxy- 9043-30-5 100 0.0882 N/A
Water 7732-18-5 100 0.0882 N/A
2 30/50 Domestic Sand Step Energy Services Crystalline Silica 14808-60-7 100 5.8976 N/A
SBX-7 (Crosslinker) Step Energy Services Crosslinker Non-Hazardous Ingredients Not Available 100 0.0923 N/A
Petroleum Distillates. hydrotreated light 64742-47-8 100 0.0923 N/A
3 SFR-302 (Friction Reducer) Step Energy Services Friction Reducer Proprietary Trade Secret 100 0.0119 N/A
Sodium Chloride 7647-14-5 100 0.0119 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-08-20 2018-09-05 Surface Water - Runoff 42590
2018-08-04 2018-08-04 Recycled Fracturing Water (treated at well site) 3296
2018-08-07 2018-08-07 Recycled Fracturing Water (treated at well site) 1520

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 1916 0.0 0.0 0.0
2019 6929 0.0 0.0 0.0
2020 1951 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-07-25 No Incident Encountered 0.00 0.00
2018-08-23 No Incident Encountered 0.00 0.00

For data sources see[9]

References