If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0314250709020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.641019,"lon":-113.530953,"icon":""}]} |
Location: 02/09-07-031-25W4/0 | |
Location Alias: 02/09-07-31-25 W4M | |
Location Alias 2: 02/09-07-031-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 031 | |
Meridian: 4 | |
Range: 25 | |
Section: 07 | |
County/Municipality: Kneehill County | |
Well Name: EMBER 102 SD TWINING 9-7-31-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0423876 | |
License Date: 2010-09-24 | |
License Status: Issued | |
Spud Date: 2010-10-15 | |
Final Drill Date: 2010-10-16 | |
Well Total Depth: 995.00 m | |
Surface Hole Latitude: 51.641019 | |
Surface Hole Longitude: -113.530953 |
Date | Event |
---|---|
2010-09-24 | Obtained License |
2010-10-15 | Surface Casing Operation Performed |
2010-10-16 | Direction Drilling Operation Performed - Deviate |
2010-10-16 | Finished Drilling |
2010-10-16 | Production Casing Operation Performed |
2010-10-16 | Rig Released |
2010-10-16 | Well Mode changed to Drilled and Cased |
2010-10-18 | Well Log Performed |
2010-11-13 | Perforation Treatment Performed - Jet Perforation |
2010-11-21 | Perforation Treatment Performed - Fractured |
2010-11-26 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-11-26 | Well Mode changed to Testing |
2011-02-15 | Well Began Production |
2011-02-15 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-02-15 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-10-16 | 111.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-11-13 | Perforation | 657.60 | 658.10 | 13 |
2010-11-13 | Perforation | 610.60 | 611.60 | 13 |
2010-11-13 | Perforation | 597.50 | 598.00 | 13 |
2010-11-13 | Perforation | 595.30 | 596.30 | 13 |
2010-11-13 | Perforation | 594.00 | 594.50 | 13 |
2010-11-13 | Perforation | 593.40 | 593.90 | 13 |
2010-11-13 | Perforation | 558.90 | 559.90 | 13 |
2010-11-13 | Perforation | 557.20 | 558.20 | 13 |
2010-11-13 | Perforation | 541.50 | 542.00 | 13 |
2010-11-13 | Perforation | 539.40 | 540.40 | 13 |
2010-11-13 | Perforation | 531.60 | 532.60 | 13 |
2010-11-13 | Perforation | 656.80 | 657.30 | 13 |
2010-11-13 | Perforation | 497.60 | 498.60 | 13 |
2010-11-13 | Perforation | 494.90 | 495.40 | 13 |
2010-11-13 | Perforation | 481.20 | 482.70 | 13 |
2010-11-13 | Perforation | 436.60 | 437.10 | 13 |
2010-11-13 | Perforation | 416.50 | 417.00 | 13 |
2010-11-13 | Perforation | 389.70 | 390.20 | 13 |
2010-11-13 | Perforation | 374.20 | 374.70 | 13 |
2010-11-13 | Perforation | 367.90 | 368.40 | 13 |
2010-11-13 | Perforation | 355.10 | 356.10 | 13 |
2010-11-13 | Perforation | 300.20 | 300.70 | 13 |
2010-11-13 | Perforation | 654.40 | 654.90 | 13 |
2010-11-13 | Perforation | 263.30 | 263.80 | 13 |
2010-11-13 | Perforation | 239.90 | 240.40 | 13 |
2010-11-13 | Perforation | 236.30 | 237.80 | 13 |
2010-11-13 | Perforation | 490.00 | 493.00 | 13 |
2010-11-13 | Perforation | 484.00 | 487.00 | 13 |
2010-11-21 | Fracture | 484.00 | 493.00 | 0 |
2010-11-21 | Fracture | 494.90 | 643.60 | 0 |
2010-11-21 | Fracture | 236.30 | 482.70 | 0 |
2010-11-21 | Fracture | 652.60 | 658.10 | 0 |
2010-11-13 | Perforation | 652.60 | 653.60 | 13 |
2010-11-13 | Perforation | 642.10 | 643.60 | 13 |
2010-11-13 | Perforation | 638.80 | 639.80 | 13 |
2010-11-13 | Perforation | 628.60 | 629.10 | 13 |
2010-11-13 | Perforation | 626.80 | 627.80 | 13 |
2010-11-13 | Perforation | 625.20 | 626.20 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 24 | 0.0 | 0.0 | 0.0 |
2011 | 7666 | 0.0 | 0.0 | 0.0 |
2012 | 8668 | 0.0 | 0.0 | 0.0 |
2013 | 8751 | 0.0 | 0.0 | 0.0 |
2014 | 8734 | 0.0 | 0.0 | 0.0 |
2015 | 8749 | 0.0 | 0.0 | 0.0 |
2016 | 8782 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]