If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0314250612000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.632602,"lon":-113.53479,"icon":""}]} |
Location: 00/12-06-031-25W4/0 | |
Location Alias: 00/12-06-31-25 W4M | |
Location Alias 2: 00/12-06-031-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 031 | |
Meridian: 4 | |
Range: 25 | |
Section: 06 | |
County/Municipality: Kneehill County | |
Well Name: EMBER TWINING 12-6-31-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0423969 | |
License Date: 2010-09-28 | |
License Status: Amended | |
Spud Date: 2010-11-05 | |
Final Drill Date: 2010-11-06 | |
Well Total Depth: 1228.00 m | |
Surface Hole Latitude: 51.632602 | |
Surface Hole Longitude: -113.534790 |
Date | Event |
---|---|
2010-09-28 | Obtained License |
2010-11-05 | Direction Drilling Operation Performed - Deviate |
2010-11-05 | Surface Casing Operation Performed |
2010-11-06 | Finished Drilling |
2010-11-06 | Production Casing Operation Performed |
2010-11-06 | Well Mode changed to Drilled and Cased |
2010-11-07 | Rig Released |
2010-11-09 | Well Log Performed |
2010-11-26 | Perforation Treatment Performed - Jet Perforation |
2010-12-01 | Perforation Treatment Performed - Fractured |
2010-12-04 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-12-04 | Well Mode changed to Testing |
2011-02-15 | Well Began Production |
2011-02-15 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-02-15 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-11-05 | 129.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-11-26 | Perforation | 623.00 | 624.00 | 13 |
2010-11-26 | Perforation | 752.10 | 754.10 | 13 |
2010-11-26 | Perforation | 454.90 | 455.90 | 13 |
2010-11-26 | Perforation | 535.50 | 536.00 | 13 |
2010-11-26 | Perforation | 469.70 | 470.20 | 13 |
2010-11-26 | Perforation | 463.70 | 464.20 | 13 |
2010-11-26 | Perforation | 813.00 | 814.00 | 13 |
2010-11-26 | Perforation | 799.40 | 801.40 | 13 |
2010-11-26 | Perforation | 779.90 | 783.40 | 13 |
2010-11-26 | Perforation | 820.60 | 821.10 | 13 |
2010-11-26 | Perforation | 817.60 | 818.10 | 13 |
2010-11-26 | Perforation | 620.20 | 622.70 | 13 |
2010-11-26 | Perforation | 814.70 | 815.20 | 13 |
2010-11-26 | Perforation | 776.00 | 777.00 | 13 |
2010-11-26 | Perforation | 689.40 | 689.90 | 13 |
2010-11-26 | Perforation | 691.80 | 692.80 | 13 |
2010-11-26 | Perforation | 674.30 | 675.30 | 13 |
2010-11-26 | Perforation | 754.30 | 755.80 | 13 |
2010-11-26 | Perforation | 740.20 | 740.70 | 13 |
2010-11-26 | Perforation | 737.00 | 739.00 | 13 |
2010-12-01 | Fracture | 752.10 | 754.10 | 0 |
2010-12-01 | Fracture | 796.00 | 797.50 | 0 |
2010-11-26 | Perforation | 616.30 | 617.30 | 13 |
2010-12-01 | Fracture | 799.40 | 814.00 | 0 |
2010-12-01 | Fracture | 814.70 | 815.20 | 0 |
2010-12-01 | Fracture | 384.10 | 740.70 | 0 |
2010-12-01 | Fracture | 754.30 | 777.00 | 0 |
2010-11-26 | Perforation | 626.00 | 627.00 | 13 |
2010-11-26 | Perforation | 669.90 | 670.40 | 13 |
2010-11-26 | Perforation | 667.90 | 668.90 | 13 |
2010-11-26 | Perforation | 630.00 | 630.50 | 13 |
2010-11-26 | Perforation | 384.10 | 384.20 | 13 |
2010-11-26 | Perforation | 796.00 | 797.50 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 24 | 0.0 | 0.0 | 0.0 |
2011 | 7666 | 0.0 | 0.0 | 0.0 |
2012 | 8668 | 0.0 | 0.0 | 0.0 |
2013 | 8751 | 0.0 | 0.0 | 0.0 |
2014 | 8734 | 0.0 | 0.0 | 0.0 |
2015 | 8749 | 0.0 | 0.0 | 0.0 |
2016 | 8782 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]