If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0314250604000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.62103,"lon":-113.533658,"icon":""}]} |
Location: 00/04-06-031-25W4/0 | |
Location Alias: 00/04-06-31-25 W4M | |
Location Alias 2: 00/04-06-031-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 031 | |
Meridian: 4 | |
Range: 25 | |
Section: 06 | |
County/Municipality: Kneehill County | |
Well Name: EMBER SD TWINING 4-6-31-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0422949 | |
License Date: 2010-08-25 | |
License Status: Amended | |
Spud Date: 2010-11-09 | |
Final Drill Date: 2010-11-10 | |
Well Total Depth: 1196.00 m | |
Surface Hole Latitude: 51.621030 | |
Surface Hole Longitude: -113.533658 |
Date | Event |
---|---|
2010-08-25 | Obtained License |
2010-11-09 | Direction Drilling Operation Performed - Deviate |
2010-11-09 | Surface Casing Operation Performed |
2010-11-10 | Finished Drilling |
2010-11-10 | Well Mode changed to Drilled and Cased |
2010-11-11 | Production Casing Operation Performed |
2010-11-13 | Rig Released |
2010-11-20 | Well Log Performed |
2010-12-09 | Perforation Treatment Performed - Jet Perforation |
2010-12-16 | Perforation Treatment Performed - Fractured |
2010-12-19 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-12-19 | Well Mode changed to Testing |
2011-02-15 | Well Began Production |
2011-02-15 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-02-15 | Well Mode changed to Flowing |
2015-09-24 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-11-09 | 5.30 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-12-09 | Perforation | 640.40 | 641.90 | 13 |
2010-12-09 | Perforation | 434.60 | 435.10 | 13 |
2010-12-09 | Perforation | 428.50 | 429.00 | 13 |
2010-12-09 | Perforation | 420.10 | 420.60 | 13 |
2010-12-09 | Perforation | 704.40 | 705.40 | 13 |
2010-12-09 | Perforation | 772.70 | 773.70 | 13 |
2010-12-09 | Perforation | 1050.00 | 1053.00 | 13 |
2010-12-09 | Perforation | 774.50 | 775.00 | 13 |
2010-12-09 | Perforation | 1050.00 | 1053.00 | 13 |
2010-12-09 | Perforation | 785.10 | 786.10 | 13 |
2010-12-09 | Perforation | 759.40 | 761.40 | 13 |
2010-12-09 | Perforation | 590.40 | 591.40 | 13 |
2010-12-09 | Perforation | 722.50 | 724.00 | 13 |
2010-12-09 | Perforation | 709.20 | 710.20 | 13 |
2010-12-09 | Perforation | 719.20 | 719.70 | 13 |
2010-12-09 | Perforation | 754.80 | 756.80 | 13 |
2010-12-09 | Perforation | 740.90 | 744.40 | 13 |
2010-12-16 | Fracture | 490.50 | 534.00 | 0 |
2010-12-16 | Fracture | 425.00 | 427.00 | 0 |
2010-12-16 | Fracture | 586.70 | 761.40 | 0 |
2010-12-16 | Fracture | 772.70 | 786.10 | 0 |
2010-12-16 | Fracture | 420.10 | 420.60 | 0 |
2010-12-09 | Perforation | 586.70 | 589.70 | 13 |
2010-12-16 | Fracture | 428.50 | 435.10 | 0 |
2010-12-09 | Perforation | 669.00 | 669.50 | 13 |
2010-12-09 | Perforation | 663.10 | 663.60 | 13 |
2010-12-09 | Perforation | 659.00 | 659.50 | 13 |
2010-12-09 | Perforation | 532.00 | 534.00 | 13 |
2010-12-09 | Perforation | 490.50 | 494.50 | 13 |
2010-12-09 | Perforation | 425.00 | 427.00 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 24 | 0.0 | 0.0 | 0.0 |
2011 | 7666 | 0.0 | 0.0 | 0.0 |
2012 | 8668 | 0.0 | 0.0 | 0.0 |
2013 | 8751 | 0.0 | 0.0 | 0.0 |
2014 | 8734 | 0.0 | 0.0 | 0.0 |
2015 | 8749 | 0.0 | 0.0 | 0.0 |
2016 | 8782 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]