X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314241306000

Well Details

Well ID: 0314241306000
Loading map...
Location: 00/06-13-031-24W4/0
Location Alias: 00/06-13-31-24 W4M
Location Alias 2: 00/06-13-031-24 W4/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 24
Section: 13
County/Municipality: Kneehill County
Well Name: BUMPER ET AL TWINING 6-13-31-24
Operator Name: Marathon Canada Limited
License Number: 0112554
License Date: 1985-01-17
License Status: RecCertified
Spud Date: 1985-01-21
Final Drill Date: 1985-01-30
Well Total Depth: 1635.00 m
Surface Hole Latitude: 51.653938
Surface Hole Longitude: -113.280937

For data sources see[1][2]

Well History

Date Event
1985-01-17 Obtained License
1985-01-22 Surface Casing Operation Performed
1985-01-27 Drill Stem Test Performed
1985-01-30 Finished Drilling
1985-01-30 Well Log Performed
1985-01-30 Well Mode changed to Drilled and Cased
1985-01-31 Well Log Performed
1985-02-01 Production Casing Operation Performed
1985-02-01 Rig Released
1985-03-06 Well Log Performed
1985-03-07 Perforation Treatment Performed - Jet Perforation
1985-03-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-04-01 Well Began Production
1985-04-01 Well Fluid changed to Crude Oil
1985-04-01 Well Mode changed to Pumping
1985-06-01 Well Fluid changed to Crude Oil
1985-06-01 Well Mode changed to Suspended
1995-08-04 Well Log Performed
1995-08-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-08-05 Perforation Treatment Performed - Jet Perforation
1995-08-05 Plug Back Performed
1995-08-31 Perforation Treatment Performed - Remedial Casing
1995-08-31 Well Fluid changed to Crude Oil
1995-08-31 Well Mode changed to Abandoned
1995-09-09 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-03-07 Perforation 1598.00 1599.00 13
1985-03-07 Perforation 1594.00 1597.00 13
1985-03-07 Perforation 1590.50 1591.50 13
1985-03-08 Acid Treatment 1590.50 1599.00 0
1995-08-05 Packing Device Capped w/Cement 1575.00 1583.00 0
1995-08-05 Perforation 305.00 306.00 13
1995-08-31 Remedial Casing Cementing 305.00 306.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 1947 0.0 0.0 0.0

For data sources see[5]

References