X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314241114000

Well Details

Well ID: 0314241114000
Loading map...
Location: 00/14-11-031-24W4/0
Location Alias: 00/14-11-31-24 W4M
Location Alias 2: 00/14-11-031-24 W4/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 24
Section: 11
County/Municipality: Kneehill County
Well Name: EOG BUMPER TWINING 14-11-31-24
Operator Name: Canadian Natural Resources Limited
License Number: 0071109
License Date: 1978-08-03
License Status: Suspension
Spud Date: 1978-08-05
Final Drill Date: 1978-08-16
Well Total Depth: 1692.00 m
Surface Hole Latitude: 51.645783
Surface Hole Longitude: -113.305781

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-08-03 Obtained License
1978-08-10 Drill Stem Test Performed
1978-08-13 Drill Stem Test Performed
1978-08-16 Finished Drilling
1978-08-16 Well Mode changed to Drilled and Cased
1978-08-18 Production Casing Operation Performed
1978-08-26 Perforation Treatment Performed - Jet Perforation
1978-08-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-08-30 Well Began Production
1978-08-30 Well Fluid changed to Crude Oil
1978-08-30 Well Mode changed to Pumping
1997-01-01 Well Fluid changed to Crude Oil
1997-01-01 Well Mode changed to Suspended
2006-06-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-07-01 Well Fluid changed to Crude Oil
2006-07-01 Well Mode changed to Flowing
2016-10-31 Well Fluid changed to Crude Oil
2016-10-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-08-26 Perforation 1645.00 1647.00 3
2006-06-19 Acid Treatment 1654.50 1655.50 0
2006-06-19 Acid Treatment 1645.00 1647.00 0
1978-08-26 Perforation 1654.50 1655.50 3
1978-08-26 Perforation 1659.50 1664.00 3
1978-08-26 Perforation 1667.50 1668.00 3
1978-08-26 Perforation 1669.00 1670.50 3
1978-08-27 Acid Treatment 1645.00 1670.50 0
2006-06-19 Acid Treatment 1669.00 1670.50 0
2006-06-19 Acid Treatment 1667.50 1668.00 0
2006-06-19 Acid Treatment 1659.50 1664.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 2058 0.0 0.0 0.0
1979 7066 0.0 0.0 0.0
1980 6744 0.0 0.0 0.0
1981 6952 0.0 0.0 0.0
1982 7296 0.0 0.0 0.0
1983 8087 0.0 0.0 0.0
1984 8135 0.0 0.0 0.0
1985 8063 0.0 0.0 0.0
1986 8279 0.0 0.0 0.0
1987 6840 0.0 0.0 0.0
1988 8279 0.0 0.0 0.0
1989 6984 0.0 0.0 0.0
1990 8448 0.0 0.0 0.0
1991 7391 0.0 0.0 0.0
1992 2496 0.0 0.0 0.0
1993 2976 0.0 0.0 0.0
1994 2568 0.0 0.0 0.0
1996 744 0.0 0.0 0.0
1997 1320 0.0 0.0 0.0
2006 4390 0.0 0.0 0.0
2007 7668 0.0 0.0 0.0
2008 8256 0.0 0.0 0.0
2009 8471 0.0 0.0 0.0
2010 5856 0.0 0.0 0.0
2011 4490 0.0 0.0 0.0
2012 7398 0.0 0.0 0.0
2013 7143 0.0 0.0 0.0
2014 4124 0.0 0.0 0.0
2015 4722 0.0 0.0 0.0
2016 24 0.0 0.0 0.0

For data sources see[5]

References