If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0314240516000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.631041,"lon":-113.363181,"icon":""}]} |
Location: 00/16-05-031-24W4/0 | |
Location Alias: 00/16-05-31-24 W4M | |
Location Alias 2: 00/16-05-031-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 031 | |
Meridian: 4 | |
Range: 24 | |
Section: 05 | |
County/Municipality: Kneehill County | |
Well Name: EOG ANDEX TWINING 16-5-31-24 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0102278 | |
License Date: 1983-07-20 | |
License Status: Abandoned | |
Spud Date: 1983-07-21 | |
Final Drill Date: 1983-08-02 | |
Well Total Depth: 1742.00 m | |
Surface Hole Latitude: 51.631041 | |
Surface Hole Longitude: -113.363181 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1983-07-20 | Obtained License |
1983-07-26 | Drill Stem Test Performed |
1983-07-29 | Drill Stem Test Performed |
1983-08-02 | Finished Drilling |
1983-08-02 | Well Mode changed to Drilled and Cased |
1983-08-04 | Production Casing Operation Performed |
1983-08-13 | Perforation Treatment Performed - Jet Perforation |
1983-08-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-08-17 | Perforation Treatment Performed - Jet Perforation |
1983-08-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-10-01 | Well Began Production |
1983-10-01 | Well Fluid changed to Crude Oil |
1983-10-01 | Well Mode changed to Pumping |
1987-02-28 | Well Fluid changed to Crude Oil |
1987-02-28 | Well Mode changed to Suspended |
1999-08-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-08-21 | Plug Back Performed |
1999-08-26 | Well Log Performed |
1999-10-04 | Perforation Treatment Performed - Jet Perforation |
1999-10-04 | Well Log Performed |
1999-10-05 | Perforation Treatment Performed - Remedial Casing |
1999-11-11 | Well Abandoned |
1999-11-11 | Well Fluid changed to Crude Oil |
1999-11-11 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1983-08-13 | Perforation | 1714.50 | 1719.00 | 13 |
1983-08-13 | Perforation | 1721.00 | 1725.50 | 13 |
1983-08-14 | Acid Treatment | 1714.50 | 1725.50 | 0 |
1983-08-17 | Perforation | 1687.50 | 1696.00 | 13 |
1983-08-18 | Acid Treatment | 1687.50 | 1696.00 | 0 |
1999-08-21 | Packing Device Capped w/Cement | 1672.00 | 1680.00 | 0 |
1999-10-04 | Perforation | 730.00 | 731.00 | 13 |
1999-10-05 | Remedial Casing Cementing | 730.00 | 731.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1983 | 2694 | 0.0 | 0.0 | 0.0 |
1984 | 7895 | 0.0 | 0.0 | 0.0 |
1985 | 8351 | 0.0 | 0.0 | 0.0 |
1986 | 8567 | 0.0 | 0.0 | 0.0 |
1987 | 432 | 0.0 | 0.0 | 0.0 |
For data sources see[5]