X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314240110000

Well Details

Well ID: 0314240110000
Loading map...
Location: 00/10-01-031-24W4/0
Location Alias: 00/10-01-31-24 W4M
Location Alias 2: 00/10-01-031-24 W4/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 24
Section: 01
County/Municipality: Kneehill County
Well Name: ANDEX ET AL TWINING 10-1-31-24
Operator Name: Canadian Natural Resources Limited
License Number: 0056923
License Date: 1976-02-04
License Status: Re-Entered
Spud Date: 1976-02-09
Final Drill Date: 1976-02-21
Well Total Depth: 1617.00 m
Surface Hole Latitude: 51.628536
Surface Hole Longitude: -113.272085

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-02-04 Obtained License
1976-02-13 Drill Stem Test Performed
1976-02-14 Drill Stem Test Performed
1976-02-17 Drill Stem Test Performed
1976-02-21 Finished Drilling
1976-02-22 Drill Stem Test Performed
1976-02-23 Production Casing Operation Performed
1976-02-28 Perforation Treatment Performed - Open-Hole Completion
1976-03-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-03-07 Perforation Treatment Performed - Jet Perforation
1976-03-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-03-13 Perforation Treatment Performed - Jet Perforation
1976-06-05 Well Mode changed to Drilled and Cased
1976-12-21 Well Began Production
1976-12-21 Well Fluid changed to Gas
1976-12-21 Well Mode changed to Flowing
1981-12-16 Well Fluid changed to Gas
1981-12-16 Well Mode changed to Suspended
1982-09-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-05-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-05-28 Plug Back Performed
1993-05-28 Well Log Performed
1993-05-29 Perforation Treatment Performed - Jet Perforation
1993-05-31 Perforation Treatment Performed - Remedial Casing
1993-05-31 Well Fluid changed to Gas
1993-05-31 Well Mode changed to Abandoned and Re-entered
1993-06-10 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-02-28 Open Hole/Barefoot Completion 1565.50 1617.00 0
1993-05-31 Remedial Casing Cementing 370.00 371.00 0
1976-03-02 Acid Treatment 1565.50 1617.00 0
1976-03-07 Perforation 1563.60 1568.50 13
1976-03-08 Acid Treatment 1563.60 1568.50 0
1976-03-12 Packing Device Capped w/Cement 1551.40 1551.40 0
1976-03-13 Perforation 1348.10 1352.10 7
1982-09-24 Acid Treatment 1348.10 1352.10 0
1993-05-28 Packing Device Capped w/Cement 1332.00 1340.00 0
1993-05-29 Perforation 370.00 371.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 192 0.0 0.0 0.0
1977 8137 0.0 0.0 0.0
1978 8370 0.0 0.0 0.0
1979 7073 0.0 0.0 0.0
1980 48 0.0 0.0 0.0

For data sources see[5]

References