X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314231113000

Well Details

Well ID: 0314231113000
Loading map...
Location: 00/13-11-031-23W4/0
Location Alias: 00/13-11-31-23 W4M
Location Alias 2: 00/13-11-031-23 W4/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 23
Section: 11
County/Municipality: Kneehill County
Well Name: EMBER GPINE 13-11-31-23
Operator Name: Ember Resources Inc.
License Number: 0312911
License Date: 2004-08-05
License Status: Issued
Spud Date: 2004-09-01
Final Drill Date: 2004-09-20
Well Total Depth: 859.00 m
Surface Hole Latitude: 51.646459
Surface Hole Longitude: -113.164898

For data sources see[1][2]

Well History

Date Event
2004-08-05 Obtained License
2004-09-01 Surface Casing Operation Performed
2004-09-20 Finished Drilling
2004-09-20 Well Mode changed to Drilled and Cased
2004-09-21 Production Casing Operation Performed
2004-09-21 Rig Released
2004-10-06 Well Log Performed
2004-10-29 Perforation Treatment Performed - Jet Perforation
2004-12-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-12-06 Perforation Treatment Performed - Jet Perforation
2004-12-06 Plug Back Performed
2004-12-06 Well Mode changed to Abandoned Zone
2004-12-18 Perforation Treatment Performed - Jet Perforation
2005-01-03 Perforation Treatment Performed - Jet Perforation
2005-01-29 Perforation Treatment Performed - Jet Perforation
2005-02-05 Perforation Treatment Performed - Fractured
2005-02-11 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-10-29 Perforation 824.00 826.00 20
2005-01-29 Perforation 518.70 519.70 13
2005-01-29 Perforation 511.60 512.60 13
2005-01-29 Perforation 484.30 485.30 13
2005-01-29 Perforation 450.40 453.40 13
2005-01-29 Perforation 448.10 449.10 13
2005-01-29 Perforation 445.40 446.40 13
2005-01-29 Perforation 442.50 443.50 13
2005-01-29 Perforation 413.50 414.50 13
2005-01-29 Perforation 407.90 408.90 13
2005-01-29 Perforation 400.20 402.20 13
2004-12-06 Packing Device Capped w/Cement 807.00 815.00 0
2005-01-29 Perforation 395.50 396.50 13
2005-01-29 Perforation 378.30 379.30 13
2005-01-29 Perforation 335.60 336.60 13
2005-01-29 Perforation 328.00 329.00 13
2005-01-29 Perforation 299.30 300.30 13
2005-01-29 Perforation 293.60 294.60 13
2005-01-29 Perforation 265.00 266.00 13
2005-02-05 Fracture 265.00 562.10 0
2004-12-06 Perforation 738.00 739.00 20
2004-12-18 Perforation 601.00 603.00 20
2005-01-03 Perforation 589.00 590.00 20
2005-01-29 Perforation 561.10 562.10 13
2005-01-29 Perforation 544.10 545.10 13
2005-01-29 Perforation 541.10 542.10 13
2005-01-29 Perforation 525.30 526.30 13

For data sources see[4]



References