X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314230305002

Well Details

Well ID: 0314230305002
Loading map...
Location: 00/05-03-031-23W4/2
Location Alias: 00/05-03-31-23 W4M
Location Alias 2: 00/05-03-031-23 W4/02
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 23
Section: 03
County/Municipality: Kneehill County
Well Name: BUMPER GHOST PINE 5-3-31-23
Operator Name: Canstone Energy Ltd.
License Number: 0237403
License Date: 2000-05-16
License Status: Issued
Spud Date: 2000-06-12
Final Drill Date: 2000-06-17
Well Total Depth: 1630.00 m
Surface Hole Latitude: 51.626938
Surface Hole Longitude: -113.188969

For data sources see[1][2]

Well History

Date Event
2000-05-16 Obtained License
2000-06-14 Surface Casing Operation Performed
2000-06-17 Finished Drilling
2000-06-17 Well Mode changed to Drilled and Cased
2000-06-18 Well Log Performed
2000-06-19 Drill Stem Test Performed
2000-06-19 Production Casing Operation Performed
2000-06-19 Rig Released
2000-07-10 Perforation Treatment Performed - Jet Perforation
2000-07-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-12-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-11-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-11-08 Plug Back Performed
2003-11-09 Perforation Treatment Performed - Jet Perforation
2003-11-10 Perforation Treatment Performed - Fractured
2004-10-26 Well Began Production
2004-10-26 Well Fluid changed to Gas
2004-10-26 Well Mode changed to Flowing
2020-03-01 Well Fluid changed to Gas
2020-03-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-07-10 Perforation 1611.00 1614.00 17
2000-07-10 Perforation 1606.00 1609.00 17
2000-07-11 Acid Treatment 1606.00 1614.00 0
2000-12-08 Acid Treatment 1606.00 1614.00 0
2003-11-08 Packing Device Capped w/Cement 1587.00 1595.00 0
2003-11-09 Perforation 1375.00 1377.00 17
2003-11-10 Fracture 1375.00 1377.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 1466 0.0 0.0 0.0
2005 8732 0.0 0.0 0.0
2006 8562 0.0 0.0 0.0
2007 8746 0.0 0.0 0.0
2008 8598 0.0 0.0 0.0
2009 8658 0.0 0.0 0.0
2010 8732 0.0 0.0 0.0
2011 8231 0.0 0.0 0.0
2012 4543 0.0 0.0 0.0
2013 3697 0.0 0.0 0.0
2014 3761 0.0 0.0 0.0
2015 5774 0.0 0.0 0.0
2016 3858 0.0 0.0 0.0
2017 1246 0.0 0.0 0.0
2018 1210 0.0 0.0 0.0

For data sources see[5]

References