X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314230206000

Well Details

Well ID: 0314230206000
Loading map...
Location: 00/06-02-031-23W4/0
Location Alias: 00/06-02-31-23 W4M
Location Alias 2: 00/06-02-031-23 W4/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 23
Section: 02
County/Municipality: Kneehill County
Well Name: BUMPER DEV GPINE 6-2-31-23
Operator Name: Canstone Energy Ltd.
License Number: 0055515
License Date: 1975-10-23
License Status: Issued
Spud Date: 1975-10-23
Final Drill Date: 1975-11-01
Well Total Depth: 1664.20 m
Surface Hole Latitude: 51.626684
Surface Hole Longitude: -113.159398

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-10-23 Obtained License
1975-10-26 Drill Stem Test Performed
1975-10-29 Drill Stem Test Performed
1975-11-01 Finished Drilling
1975-11-02 Drill Stem Test Performed
1975-11-04 Drill Stem Test Performed
1975-11-06 Drill Stem Test Performed
1975-11-07 Production Casing Operation Performed
1975-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-12-12 Perforation Treatment Performed - Jet Perforation
1975-12-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1975-12-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-12-16 Perforation Treatment Performed - Jet Perforation
1976-01-10 Perforation Treatment Performed - Jet Perforation
1976-01-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-01-16 Perforation Treatment Performed - Fractured
1976-05-20 Well Mode changed to Drilled and Cased
1977-01-01 Well Began Production
1977-01-01 Well Fluid changed to Gas
1977-01-01 Well Mode changed to Flowing
2018-10-01 Well Fluid changed to Gas
2018-10-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-12-12 Perforation 1620.90 1621.50 3
1976-01-16 Fracture 1397.80 1401.80 0
1975-12-12 Perforation 1624.30 1627.30 3
1975-12-12 Acid Treatment 1620.90 1627.30 0
1975-12-15 Packing Device Capped w/Cement 1614.20 1617.30 0
1975-12-16 Perforation 1567.30 1569.70 3
1975-12-16 Acid Treatment 1567.30 1569.70 0
1976-01-10 Perforation 1397.80 1398.70 7
1976-01-10 Perforation 1399.30 1401.80 7
1976-01-11 Acid Treatment 1397.80 1401.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 8490 0.0 0.0 0.0
1978 8723 0.0 0.0 0.0
1979 8682 0.0 0.0 0.0
1980 8699 0.0 0.0 0.0
1981 8759 0.0 0.0 0.0
1982 8569 0.0 0.0 0.0
1983 8557 0.0 0.0 0.0
1984 8520 0.0 0.0 0.0
1985 8529 0.0 0.0 0.0
1986 8639 0.0 0.0 0.0
1987 7887 0.0 0.0 0.0
1988 7651 0.0 0.0 0.0
1989 8207 0.0 0.0 0.0
1990 7416 0.0 0.0 0.0
1991 7506 0.0 0.0 0.0
1992 8042 0.0 0.0 0.0
1993 7760 0.0 0.0 0.0
1994 5922 0.0 0.0 0.0
1995 7442 0.0 0.0 0.0
1996 8782 0.0 0.0 0.0
1997 8579 0.0 0.0 0.0
1998 8457 0.0 0.0 0.0
1999 8402 0.0 0.0 0.0
2000 8668 0.0 0.0 0.0
2001 8561 0.0 0.0 0.0
2002 8276 0.0 0.0 0.0
2003 8562 0.0 0.0 0.0
2004 7885 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8705 0.0 0.0 0.0
2010 8455 0.0 0.0 0.0
2011 8010 0.0 0.0 0.0
2012 2656 0.0 0.0 0.0
2013 5559 0.0 0.0 0.0
2014 3182 0.0 0.0 0.0
2015 4607 0.0 0.0 0.0
2016 2709 0.0 0.0 0.0
2017 376 0.0 0.0 0.0

For data sources see[5]

References