If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0314223015030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.693599,"lon":-113.109623,"icon":""}]} |
Location: 03/15-30-031-22W4/0 | |
Location Alias: 03/15-30-31-22 W4M | |
Location Alias 2: 03/15-30-031-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 031 | |
Meridian: 4 | |
Range: 22 | |
Section: 30 | |
County/Municipality: Kneehill County | |
Well Name: EMBER 103 GPINE 15-30-31-22 | |
Operator Name: Ember Resources Inc. | |
License Number: 0411657 | |
License Date: 2009-07-30 | |
License Status: Amended | |
Spud Date: 2009-08-11 | |
Final Drill Date: 2009-09-18 | |
Well Total Depth: 838.00 m | |
Surface Hole Latitude: 51.693599 | |
Surface Hole Longitude: -113.109623 |
Date | Event |
---|---|
2009-07-30 | Obtained License |
2009-08-11 | Surface Casing Operation Performed |
2009-09-17 | Direction Drilling Operation Performed - Deviate |
2009-09-18 | Finished Drilling |
2009-09-18 | Well Mode changed to Drilled and Cased |
2009-09-19 | Production Casing Operation Performed |
2009-09-19 | Rig Released |
2009-09-19 | Well Log Performed |
2009-11-16 | Perforation Treatment Performed - Jet Perforation |
2009-11-16 | Well Log Performed |
2009-11-19 | Perforation Treatment Performed - Fractured |
2009-11-23 | Well Fluid changed to Coalbed Methane-Coals Only |
2009-11-23 | Well Mode changed to Testing |
2009-11-27 | Well Began Production |
2009-11-27 | Well Fluid changed to Coalbed Methane-Coals Only |
2009-11-27 | Well Mode changed to Flowing |
2010-01-29 | Well Log Performed |
2013-09-15 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-09-17 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-11-16 | Perforation | 801.40 | 801.90 | 13 |
2009-11-16 | Perforation | 459.00 | 459.50 | 13 |
2009-11-16 | Perforation | 451.10 | 452.10 | 13 |
2009-11-16 | Perforation | 442.30 | 442.80 | 13 |
2009-11-16 | Perforation | 439.80 | 440.30 | 13 |
2009-11-16 | Perforation | 389.00 | 390.50 | 13 |
2009-11-16 | Perforation | 381.20 | 382.20 | 13 |
2009-11-16 | Perforation | 376.30 | 377.30 | 13 |
2009-11-16 | Perforation | 369.00 | 372.00 | 13 |
2009-11-16 | Perforation | 360.70 | 361.20 | 13 |
2009-11-16 | Perforation | 359.80 | 360.30 | 13 |
2009-11-16 | Perforation | 794.30 | 794.80 | 13 |
2009-11-16 | Perforation | 347.00 | 347.50 | 13 |
2009-11-16 | Perforation | 341.60 | 342.60 | 13 |
2009-11-16 | Perforation | 333.00 | 334.50 | 13 |
2009-11-16 | Perforation | 324.70 | 326.70 | 13 |
2009-11-16 | Perforation | 322.40 | 322.90 | 13 |
2009-11-16 | Perforation | 276.50 | 277.00 | 13 |
2009-11-16 | Perforation | 269.70 | 270.20 | 13 |
2009-11-16 | Perforation | 267.30 | 267.80 | 13 |
2009-11-19 | Fracture | 785.00 | 801.90 | 0 |
2009-11-19 | Fracture | 497.50 | 505.20 | 0 |
2009-11-16 | Perforation | 785.00 | 785.50 | 13 |
2009-11-19 | Fracture | 439.80 | 481.40 | 0 |
2009-11-19 | Fracture | 359.80 | 390.50 | 0 |
2009-11-19 | Fracture | 322.40 | 347.50 | 0 |
2009-11-19 | Fracture | 267.30 | 277.00 | 0 |
2009-11-16 | Perforation | 504.70 | 505.20 | 13 |
2009-11-16 | Perforation | 500.40 | 500.90 | 13 |
2009-11-16 | Perforation | 497.50 | 498.00 | 13 |
2009-11-16 | Perforation | 480.90 | 481.40 | 13 |
2009-11-16 | Perforation | 470.50 | 471.00 | 13 |
2009-11-16 | Perforation | 465.40 | 466.40 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 828 | 0.0 | 0.0 | 0.0 |
2010 | 8580 | 0.0 | 0.0 | 0.0 |
2011 | 8628 | 0.0 | 0.0 | 0.0 |
2012 | 8731 | 0.0 | 0.0 | 0.0 |
2013 | 8714 | 0.0 | 0.0 | 0.0 |
2014 | 8705 | 0.0 | 0.0 | 0.0 |
2015 | 8546 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]