X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314221611000

Well Details

Well ID: 0314221611000
Loading map...
Location: 00/11-16-031-22W4/0
Location Alias: 00/11-16-31-22 W4M
Location Alias 2: 00/11-16-031-22 W4/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 22
Section: 16
County/Municipality: Kneehill County
Well Name: PINE CLIFF GPINE 11-16-31-22
Operator Name: Pine Cliff Energy Ltd.
License Number: 0241496
License Date: 2000-08-30
License Status: Suspension
Spud Date: 2000-12-15
Final Drill Date: 2000-12-25
Well Total Depth: 1538.00 m
Surface Hole Latitude: 51.657394
Surface Hole Longitude: -113.067624

For data sources see[1][2]

Well History

Date Event
2000-08-30 Obtained License
2000-12-16 Surface Casing Operation Performed
2000-12-18 Direction Drilling Operation Performed - Deviate
2000-12-25 Finished Drilling
2000-12-26 Well Log Performed
2000-12-28 Production Casing Operation Performed
2000-12-28 Rig Released
2000-12-28 Well Mode changed to Drilled and Cased
2001-01-13 Perforation Treatment Performed - Jet Perforation
2001-01-13 Well Log Performed
2001-01-15 Perforation Treatment Performed - Fractured
2001-02-15 Well Began Production
2001-02-15 Well Fluid changed to Gas
2001-02-15 Well Mode changed to Flowing
2006-02-18 Well Log Performed
2006-02-19 Perforation Treatment Performed - Jet Perforation
2006-02-19 Well Log Performed
2006-02-22 Perforation Treatment Performed - Fractured
2006-02-24 Perforation Treatment Performed - Fractured
2006-02-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-02-28 Plug Back Performed
2006-02-28 Well Fluid changed to Gas
2006-02-28 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-12-18 1083.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-01-13 Perforation 1441.00 1444.00 20
2001-01-15 Fracture 1441.00 1444.00 0
2006-02-19 Perforation 1250.50 1251.70 17
2006-02-22 Fracture 1250.50 1251.70 0
2006-02-24 Fracture 1250.50 1251.70 0
2006-02-28 Packing Device Capped w/Cement 1421.90 1429.90 0
2006-02-28 Packing Device Capped w/Cement 1127.40 1235.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 8186 0.0 0.0 0.0
2002 7839 0.0 0.0 0.0
2003 2556 0.0 0.0 0.0
2004 3221 0.0 0.0 0.0
2005 6023 0.0 0.0 0.0
2006 1152 0.0 0.0 0.0

For data sources see[6]

References