X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314221415000

Well Details

Well ID: 0314221415000
Loading map...
Location: 00/15-14-031-22W4/0
Location Alias: 00/15-14-31-22 W4M
Location Alias 2: 00/15-14-031-22 W4/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 22
Section: 14
County/Municipality: Kneehill County
Well Name: GULF GHOST PINE 15-14-31-22
Operator Name: Pine Cliff Energy Ltd.
License Number: 0008984
License Date: 1955-01-07
License Status: Abandoned
Spud Date: 1955-01-18
Final Drill Date: 1955-02-27
Well Total Depth: 2072.60 m
Surface Hole Latitude: 51.661956
Surface Hole Longitude: -113.013810

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1955-01-07 Obtained License
1955-01-27 Drill Stem Test Performed
1955-02-03 Drill Stem Test Performed
1955-02-26 Production Casing Operation Performed
1955-02-27 Drill Stem Test Performed
1955-02-27 Finished Drilling
1955-03-03 Well Log Performed
1955-03-05 Perforation Treatment Performed - Jet Perforation
1955-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-03-06 Perforation Treatment Performed - Acid Wash - No Pressure
1955-03-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-03-17 Perforation Treatment Performed - Acid Wash - No Pressure
1955-03-17 Perforation Treatment Performed - Fractured
1955-04-11 Perforation Treatment Performed - Cement Squeeze
1955-09-01 Well Mode changed to Drilled and Cased
1960-10-28 Perforation Treatment Performed - Jet Perforation
1967-12-01 Well Began Production
1967-12-01 Well Fluid changed to Gas
1967-12-01 Well Mode changed to Flowing
1968-07-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-06-01 Well Fluid changed to Gas
1995-06-01 Well Mode changed to Suspended
1997-04-30 Well Fluid changed to Gas
1997-04-30 Well Mode changed to Flowing
1997-05-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-05-09 Plug Back Performed
1997-05-09 Well Fluid changed to Gas
1997-05-09 Well Log Performed
1997-05-09 Well Mode changed to Abandoned Zone
1997-05-10 Perforation Treatment Performed - Jet Perforation
1997-05-12 Perforation Treatment Performed - Fractured
1997-05-14 Well Log Performed
2011-12-08 Well Log Performed
2011-12-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-12-09 Perforation Treatment Performed - Jet Perforation
2011-12-09 Plug Back Performed
2011-12-09 Well Log Performed
2011-12-12 Perforation Treatment Performed - Remedial Casing
2011-12-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-12-13 Perforation Treatment Performed - Jet Perforation
2011-12-13 Well Log Performed
2011-12-14 Well Log Performed
2011-12-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-12-15 Perforation Treatment Performed - Remedial Casing
2011-12-16 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1955-03-05 Perforation 1486.20 1489.30 20
1960-10-28 Perforation 1471.00 1472.20 7
1968-07-10 Acid Treatment 1469.10 1472.20 0
1997-05-09 Packing Device Capped w/Cement 1456.00 1464.00 0
1997-05-10 Perforation 1450.00 1452.00 16
1997-05-10 Perforation 1452.50 1454.50 16
1997-05-12 Fracture 1450.00 1454.50 0
2011-12-09 Packing Device Capped w/Cement 1416.00 1444.00 0
2011-12-09 Perforation 443.00 445.00 26
2011-12-12 Remedial Casing Cementing 443.00 445.00 0
2011-12-13 Packing Device Capped w/Cement 423.00 439.00 0
1955-03-06 Acid Wash 1486.20 1489.30 0
2011-12-13 Perforation 317.00 319.00 18
2011-12-13 Packing Device Capped w/Cement 304.00 314.00 0
2011-12-13 Perforation 215.00 217.00 18
2011-12-15 Remedial Casing Cementing 215.00 217.00 0
2011-12-15 Packing Device Capped w/Cement 183.00 211.00 0
1955-03-06 Acid Treatment 1486.20 1489.30 0
1955-03-17 Acid Wash 1486.20 1489.30 0
1955-03-17 Acid Treatment 1486.20 1489.30 0
1955-03-17 Fracture 1486.20 1489.30 0
1955-04-11 Cement Squeeze 1486.20 1489.30 0
1960-10-28 Perforation 1469.10 1469.70 7
1960-10-28 Perforation 1469.70 1471.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1971 4184 0.0 0.0 0.0
1972 7940 0.0 0.0 0.0
1973 8719 0.0 0.0 0.0
1974 8428 0.0 0.0 0.0
1975 5199 0.0 0.0 0.0
1976 4967 0.0 0.0 0.0
1978 4839 0.0 0.0 0.0
1979 8265 0.0 0.0 0.0
1980 2996 0.0 0.0 0.0
1981 5724 0.0 0.0 0.0
1982 450 0.0 0.0 0.0
1983 960 0.0 0.0 0.0
1984 2589 0.0 0.0 0.0
1985 4988 0.0 0.0 0.0
1986 2478 0.0 0.0 0.0
1987 459 0.0 0.0 0.0
1997 206 0.0 0.0 0.0

For data sources see[5]

References