X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314220707002

Well Details

Well ID: 0314220707002
Loading map...
Location: 00/07-07-031-22W4/2
Location Alias: 00/07-07-31-22 W4M
Location Alias 2: 00/07-07-031-22 W4/02
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 22
Section: 07
County/Municipality: Kneehill County
Well Name: SOC GPINE 7-7-31-22
Operator Name: Pine Cliff Energy Ltd.
License Number: 0032498
License Date: 1967-07-19
License Status: Suspension
Spud Date: 1967-07-23
Final Drill Date: 1967-08-02
Well Total Depth: 1561.20 m
Surface Hole Latitude: 51.639835
Surface Hole Longitude: -113.108291

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-07-19 Obtained License
1967-08-01 Drill Stem Test Performed
1967-08-02 Finished Drilling
1967-08-02 Well Mode changed to Drilled and Cased
1967-08-04 Drill Stem Test Performed
1967-08-05 Production Casing Operation Performed
1967-08-17 Perforation Treatment Performed - Jet Perforation
1982-08-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-08-19 Perforation Treatment Performed - Jet Perforation
1993-06-28 Perforation Treatment Performed - Jet Perforation
1993-06-28 Well Log Performed
1993-07-21 Well Began Production
1993-07-21 Well Fluid changed to Gas
1993-07-21 Well Mode changed to Flowing
2007-01-01 Well Fluid changed to Gas
2007-01-01 Well Mode changed to Suspended
2017-02-24 Well Log Performed
2017-02-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-02-25 Plug Back Performed
2017-02-25 Well Fluid changed to Gas
2017-02-25 Well Log Performed
2017-02-25 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-08-17 Perforation 1506.30 1507.50 7
1982-08-19 Perforation 1506.30 1509.40 13
1982-08-19 Acid Treatment 1506.30 1509.40 0
1993-06-28 Perforation 1491.40 1492.30 13
1993-06-28 Perforation 1493.80 1497.20 13
1993-06-28 Perforation 1499.00 1500.50 13
1993-06-28 Perforation 1491.40 1500.50 13
2017-02-25 Packing Device Capped w/Cement 1501.80 1504.80 0
2017-02-25 Packing Device Capped w/Cement 1476.80 1484.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 2296 0.0 0.0 0.0
1995 5515 0.0 0.0 0.0
1996 8258 0.0 0.0 0.0
1997 8120 0.0 0.0 0.0
1998 7995 0.0 0.0 0.0
1999 7440 0.0 0.0 0.0
2000 6755 0.0 0.0 0.0
2001 758 0.0 0.0 0.0
2002 48 0.0 0.0 0.0
2003 48 0.0 0.0 0.0
2004 48 0.0 0.0 0.0
2005 20 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-02-26 No Incident Encountered 0.00 0.00

For data sources see[6]

References