X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314220508002

Well Details

Well ID: 0314220508002
Loading map...
Location: 00/08-05-031-22W4/2
Location Alias: 00/08-05-31-22 W4M
Location Alias 2: 00/08-05-031-22 W4/02
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 22
Section: 05
County/Municipality: Kneehill County
Well Name: EMBER GPINE 8-5-31-22
Operator Name: Ember Resources Inc.
License Number: 0320891
License Date: 2004-12-06
License Status: Issued
Spud Date: 2004-12-19
Final Drill Date: 2005-01-14
Well Total Depth: 530.00 m
Surface Hole Latitude: 51.626256
Surface Hole Longitude: -113.079237

For data sources see[1][2]

Well History

Date Event
2004-12-06 Obtained License
2004-12-20 Surface Casing Operation Performed
2005-01-14 Finished Drilling
2005-01-14 Production Casing Operation Performed
2005-01-14 Rig Released
2005-01-14 Well Mode changed to Drilled and Cased
2005-01-21 Well Log Performed
2005-02-08 Perforation Treatment Performed - Jet Perforation
2005-02-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-02-16 Perforation Treatment Performed - Jet Perforation
2005-02-16 Plug Back Performed
2005-05-29 Perforation Treatment Performed - Fractured
2005-06-06 Well Fluid changed to Coalbed Methane-Coals Only
2005-06-06 Well Mode changed to Testing
2005-11-23 Well Began Production
2005-11-23 Well Fluid changed to Coalbed Methane-Coals Only
2005-11-23 Well Mode changed to Flowing
2017-03-27 Well Fluid changed to Coalbed Methane-Coals Only
2017-03-27 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-02-08 Perforation 464.00 465.00 20
2005-02-16 Perforation 330.10 331.10 13
2005-02-16 Perforation 326.10 327.10 13
2005-02-16 Perforation 319.00 320.00 13
2005-02-16 Perforation 314.60 316.60 13
2005-02-16 Perforation 290.90 293.90 13
2005-02-16 Perforation 284.10 285.10 13
2005-02-16 Perforation 282.50 283.50 13
2005-02-16 Perforation 274.50 275.50 13
2005-02-16 Perforation 273.00 274.00 13
2005-02-16 Perforation 271.10 272.10 13
2005-02-16 Packing Device Capped w/Cement 451.00 459.00 0
2005-02-16 Perforation 255.60 256.60 13
2005-02-16 Perforation 228.50 229.50 13
2005-05-29 Fracture 228.50 431.30 0
2005-02-16 Perforation 430.30 431.30 13
2005-02-16 Perforation 414.60 415.60 13
2005-02-16 Perforation 401.50 403.50 13
2005-02-16 Perforation 393.50 394.50 13
2005-02-16 Perforation 386.70 387.70 13
2005-02-16 Perforation 376.00 377.00 13
2005-02-16 Perforation 361.80 362.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 1056 0.0 0.0 0.0
2006 8695 0.0 0.0 0.0
2007 8659 0.0 0.0 0.0
2008 8579 0.0 0.0 0.0
2009 8581 0.0 0.0 0.0
2010 8570 0.0 0.0 0.0
2011 8628 0.0 0.0 0.0
2012 8731 0.0 0.0 0.0
2013 8714 0.0 0.0 0.0
2014 8705 0.0 0.0 0.0
2015 8546 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References