X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314220506020

Well Details

Well ID: 0314220506020
Loading map...
Location: 02/06-05-031-22W4/0
Location Alias: 02/06-05-31-22 W4M
Location Alias 2: 02/06-05-031-22 W4/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 22
Section: 05
County/Municipality: Kneehill County
Well Name: SOC GPINE 6-5-31-22
Operator Name: Pine Cliff Energy Ltd.
License Number: 0287150
License Date: 2003-05-14
License Status: Suspension
Spud Date: 2003-07-01
Final Drill Date: 2003-07-07
Well Total Depth: 1561.80 m
Surface Hole Latitude: 51.624155
Surface Hole Longitude: -113.089204

For data sources see[1][2]

Well History

Date Event
2003-05-14 Obtained License
2003-07-02 Surface Casing Operation Performed
2003-07-04 Drill Stem Test Performed
2003-07-07 Finished Drilling
2003-07-07 Well Log Performed
2003-07-07 Well Mode changed to Drilled and Cased
2003-07-08 Production Casing Operation Performed
2003-07-08 Rig Released
2003-07-15 Well Log Performed
2003-07-16 Perforation Treatment Performed - Jet Perforation
2003-07-16 Well Log Performed
2003-07-25 Well Began Production
2003-07-25 Well Fluid changed to Gas
2003-07-25 Well Mode changed to Flowing
2003-08-27 Perforation Treatment Performed - Jet Perforation
2003-08-27 Well Log Performed
2003-09-06 Perforation Treatment Performed - Fractured
2003-09-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-09-10 Well Fluid changed to Gas
2003-09-10 Well Mode changed to Abandoned Zone
2003-09-11 Well Log Performed
2003-10-16 Well Log Performed
2003-10-17 Perforation Treatment Performed - Cement Plug
2003-10-17 Plug Back Performed
2003-10-17 Well Log Performed
2003-10-20 Perforation Treatment Performed - Jet Perforation
2003-10-20 Well Log Performed
2003-10-21 Perforation Treatment Performed - Fractured
2003-10-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-10-23 Plug Back Performed
2003-10-23 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-07-16 Perforation 731.00 733.50 14
2003-10-23 Packing Device Capped w/Cement 526.00 534.00 0
2003-08-27 Perforation 733.50 734.50 14
2003-08-27 Perforation 736.50 739.00 14
2003-08-27 Perforation 741.00 743.00 14
2003-09-06 Fracture 731.00 743.00 0
2003-09-10 Packing Device Capped w/Cement 720.00 728.00 0
2003-10-17 Cement Plug 571.60 580.00 0
2003-10-20 Perforation 540.00 542.00 14
2003-10-21 Fracture 540.00 542.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 318 0.0 0.0 0.0

For data sources see[5]

References