X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314211311002

Well Details

Well ID: 0314211311002
Loading map...
Location: 00/11-13-031-21W4/2
Location Alias: 00/11-13-31-21 W4M
Location Alias 2: 00/11-13-031-21 W4/02
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 21
Section: 13
County/Municipality: Starland County
Well Name: PINE CLIFF GPINE 11-13-31-21
Operator Name: Pine Cliff Energy Ltd.
License Number: 0032631
License Date: 1967-08-18
License Status: Issued
Spud Date: 1967-08-29
Final Drill Date: 1967-09-05
Well Total Depth: 1463.00 m
Surface Hole Latitude: 51.657905
Surface Hole Longitude: -112.854379

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-08-18 Obtained License
1967-09-05 Finished Drilling
1967-09-06 Drill Stem Test Performed
1967-09-07 Drill Stem Test Performed
1967-09-08 Drill Stem Test Performed
1967-09-08 Production Casing Operation Performed
1969-07-18 Perforation Treatment Performed - Jet Perforation
1994-01-13 Well Log Performed
1994-01-14 Perforation Treatment Performed - Jet Perforation
1994-01-14 Well Mode changed to Drilled and Cased
1994-01-17 Well Log Performed
1994-01-18 Perforation Treatment Performed - Cement Squeeze
1994-01-22 Perforation Treatment Performed - Jet Perforation
1994-01-22 Well Log Performed
1994-01-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-01-25 Perforation Treatment Performed - Cement Squeeze
1994-01-25 Plug Back Performed
1994-02-01 Well Began Production
1994-02-01 Well Fluid changed to Gas
1994-02-01 Well Mode changed to Flowing
2002-06-01 Well Fluid changed to Gas
2002-06-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-07-18 Perforation 1375.30 1380.40 13
1994-01-14 Perforation 1401.80 1405.10 13
1994-01-18 Cement Squeeze 1375.30 1380.40 0
1994-01-22 Perforation 1375.30 1377.70 13
1994-01-25 Acid Treatment 1375.30 1377.70 0
1994-01-25 Cement Squeeze 1375.30 1377.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 7071 0.0 0.0 0.0
1995 7113 0.0 0.0 0.0
1996 5559 0.0 0.0 0.0
1997 4356 0.0 0.0 0.0
1998 2983 0.0 0.0 0.0
1999 2748 0.0 0.0 0.0
2000 2680 0.0 0.0 0.0
2001 5880 0.0 0.0 0.0
2002 7964 0.0 0.0 0.0
2003 8513 0.0 0.0 0.0
2004 8343 0.0 0.0 0.0
2005 7588 0.0 0.0 0.0
2006 8745 0.0 0.0 0.0
2007 8471 0.0 0.0 0.0
2008 8711 0.0 0.0 0.0
2009 8711 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 7762 0.0 0.0 0.0
2012 8729 0.0 0.0 0.0
2013 8558 0.0 0.0 0.0
2014 8504 0.0 0.0 0.0
2015 6426 0.0 0.0 0.0
2016 8759 0.0 0.0 0.0
2017 6722 0.0 0.0 0.0
2018 8688 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References