X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314201906000

Well Details

Well ID: 0314201906000
Loading map...
Location: 00/06-19-031-20W4/0
Location Alias: 00/06-19-31-20 W4M
Location Alias 2: 00/06-19-031-20 W4/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 20
Section: 19
County/Municipality: Starland County
Well Name: PINE CLIFF GPINE 6-19-31-20
Operator Name: Pine Cliff Energy Ltd.
License Number: 0342412
License Date: 2005-11-10
License Status: Issued
Spud Date: 2005-12-02
Final Drill Date: 2005-12-03
Well Total Depth: 466.00 m
Surface Hole Latitude: 51.670021
Surface Hole Longitude: -112.828615

For data sources see[1][2]

Well History

Date Event
2005-11-10 Obtained License
2005-11-27 Surface Casing Operation Performed
2005-12-03 Finished Drilling
2005-12-03 Production Casing Operation Performed
2005-12-03 Rig Released
2005-12-03 Well Mode changed to Drilled and Cased
2005-12-10 Well Log Performed
2005-12-19 Perforation Treatment Performed - Jet Perforation
2006-01-06 Perforation Treatment Performed - Fractured
2006-01-14 Well Log Performed
2006-07-01 Well Began Production
2006-07-01 Well Fluid changed to Coalbed Methane-Coals Only
2006-07-01 Well Mode changed to Flowing
2006-11-20 Well Log Performed
2014-06-01 Well Fluid changed to Coalbed Methane-Coals Only
2014-06-01 Well Mode changed to Suspended
2015-01-23 Well Fluid changed to Coalbed Methane-Coals Only
2015-01-23 Well Mode changed to Flowing
2016-08-01 Well Fluid changed to Gas
2016-08-01 Well Mode changed to Suspended
2016-09-01 Well Fluid changed to Coalbed Methane-Coals Only
2016-09-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-12-19 Perforation 360.50 361.00 13
2005-12-19 Perforation 221.00 221.50 13
2005-12-19 Perforation 218.40 220.40 13
2005-12-19 Perforation 217.10 218.10 13
2005-12-19 Perforation 213.00 214.00 13
2006-01-06 Fracture 213.00 361.00 0
2005-12-19 Perforation 345.20 345.70 13
2005-12-19 Perforation 339.20 339.70 13
2005-12-19 Perforation 270.00 270.50 13
2005-12-19 Perforation 248.80 249.80 13
2005-12-19 Perforation 245.30 245.80 13
2005-12-19 Perforation 235.20 235.70 13
2005-12-19 Perforation 229.60 230.10 13
2005-12-19 Perforation 222.40 222.90 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 3877 0.0 0.0 0.0
2007 8245 0.0 0.0 0.0
2008 8452 0.0 0.0 0.0
2009 8732 0.0 0.0 0.0
2010 8619 0.0 0.0 0.0
2011 6944 0.0 0.0 0.0
2012 7384 0.0 0.0 0.0
2013 411 0.0 0.0 0.0
2015 4676 0.0 0.0 0.0
2016 1632 0.0 0.0 0.0
2017 7693 0.0 0.0 0.0
2018 3863 0.0 0.0 0.0
2019 3623 0.0 0.0 0.0
2020 839 0.0 0.0 0.0

For data sources see[5]

References