X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314161608002

Well Details

Well ID: 0314161608002
Loading map...
Location: 00/08-16-031-16W4/2
Location Alias: 00/08-16-31-16 W4M
Location Alias 2: 00/08-16-031-16 W4/02
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 16
Section: 16
County/Municipality: Starland County
Well Name: RENAISSANCE ET AL WATTS 8-16-31-16
Operator Name: Baytex Energy Ltd.
License Number: 0121306
License Date: 1986-01-10
License Status: RecCertified
Spud Date: 1986-01-29
Final Drill Date: 1986-02-05
Well Total Depth: 1351.00 m
Surface Hole Latitude: 51.654148
Surface Hole Longitude: -112.203917

For data sources see[1][2]

Well History

Date Event
1986-01-10 Obtained License
1986-01-30 Surface Casing Operation Performed
1986-02-05 Finished Drilling
1986-02-05 Well Mode changed to Drilled and Cased
1986-02-06 Well Log Performed
1986-02-07 Drill Stem Test Performed
1986-02-08 Production Casing Operation Performed
1986-02-08 Rig Released
1986-02-10 Well Log Performed
1986-02-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-02-15 Perforation Treatment Performed - Jet Perforation
1986-02-15 Well Log Performed
1986-02-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-02-17 Perforation Treatment Performed - Jet Perforation
1986-02-17 Well Log Performed
1986-04-01 Well Began Production
1986-04-01 Well Fluid changed to Crude Oil
1986-04-01 Well Mode changed to Flowing
1993-05-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-05-04 Plug Back Performed
1993-05-04 Well Abandoned
1993-05-04 Well Fluid changed to Crude Oil
1993-05-04 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-02-15 Perforation 1309.00 1311.00 13
1986-02-15 Acid Treatment 1309.00 1311.00 0
1986-02-17 Perforation 1264.00 1266.00 13
1986-02-17 Acid Treatment 1264.00 1266.00 0
1993-05-04 Packing Device Capped w/Cement 1240.00 1248.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 3462 0.0 0.0 0.0
1987 6793 0.0 0.0 0.0
1988 7437 0.0 0.0 0.0
1989 8402 0.0 0.0 0.0
1990 8423 0.0 0.0 0.0
1991 6645 0.0 0.0 0.0
1992 8702 0.0 0.0 0.0
1993 3113 0.0 0.0 0.0

For data sources see[5]

References