X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314091912000

Well Details

Well ID: 0314091912000
Loading map...
Location: 00/12-19-031-09W4/0
Location Alias: 00/12-19-31-09 W4M
Location Alias 2: 00/12-19-031-09 W4/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 09
Section: 19
County/Municipality: Special Areas No. 3
Well Name: MARL YNGSTN 12-19-31-9
Operator Name: Marlboro Energy Ltd.
License Number: 0049154
License Date: 1974-02-25
License Status: Issued
Spud Date: 1974-03-05
Final Drill Date: 1974-03-22
Well Total Depth: 1158.20 m
Surface Hole Latitude: 51.672480
Surface Hole Longitude: -111.277585

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-02-25 Obtained License
1974-03-12 Drill Stem Test Performed
1974-03-19 Drill Stem Test Performed
1974-03-22 Finished Drilling
1974-03-22 Well Mode changed to Drilled and Cased
1974-03-23 Drill Stem Test Performed
1974-03-23 Production Casing Operation Performed
1974-08-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-08-01 Perforation Treatment Performed - Jet Perforation
1974-08-05 Perforation Treatment Performed - Cement Squeeze
1974-08-07 Perforation Treatment Performed - Cement Squeeze
1974-08-15 Perforation Treatment Performed - Abrasa-Jet Perforation
1974-08-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-08-26 Well Began Production
1974-08-26 Well Fluid changed to Crude Oil
1974-08-26 Well Mode changed to Pumping
1981-10-07 Perforation Treatment Performed - Chemical Squeeze
1981-10-08 Perforation Treatment Performed - Chemical Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-08-01 Perforation 1130.20 1132.60 10
1974-08-01 Acid Treatment 1130.20 1132.60 0
1974-08-05 Cement Squeeze 1130.20 1132.60 0
1974-08-07 Cement Squeeze 1130.20 1132.60 0
1974-08-15 Hydra Jet Perforation 1129.90 1132.00 7
1974-08-15 Acid Treatment 1129.90 1132.00 0
1981-10-07 Chemical Squeeze 1129.90 1132.00 0
1981-10-08 Chemical Squeeze 1129.90 1132.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1974 2772 0.0 0.0 0.0
1975 5487 0.0 0.0 0.0
1976 8426 0.0 0.0 0.0
1977 7928 0.0 0.0 0.0
1978 8419 0.0 0.0 0.0
1979 8541 0.0 0.0 0.0
1980 8783 0.0 0.0 0.0
1981 8483 0.0 0.0 0.0
1982 8543 0.0 0.0 0.0
1983 8669 0.0 0.0 0.0
1984 8658 0.0 0.0 0.0
1985 8289 0.0 0.0 0.0
1986 2467 0.0 0.0 0.0
1987 6374 0.0 0.0 0.0
1988 8539 0.0 0.0 0.0
1989 8359 0.0 0.0 0.0
1990 8579 0.0 0.0 0.0
1991 8642 0.0 0.0 0.0
1992 8759 0.0 0.0 0.0
1993 8516 0.0 0.0 0.0
1994 8627 0.0 0.0 0.0
1995 8440 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8735 0.0 0.0 0.0
1998 8759 0.0 0.0 0.0
1999 8687 0.0 0.0 0.0
2000 8735 0.0 0.0 0.0
2001 8683 0.0 0.0 0.0
2002 8271 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8771 0.0 0.0 0.0
2005 8004 0.0 0.0 0.0
2006 8659 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8652 0.0 0.0 0.0
2009 8645 0.0 0.0 0.0
2010 8615 0.0 0.0 0.0
2011 8689 0.0 0.0 0.0
2012 8759 0.0 0.0 0.0
2013 8723 0.0 0.0 0.0
2014 8479 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8591 0.0 0.0 0.0
2018 8747 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References