If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0314091810000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.658472,"lon":-111.266681,"icon":""}]} |
Location: 00/10-18-031-09W4/0 | |
Location Alias: 00/10-18-31-09 W4M | |
Location Alias 2: 00/10-18-031-09 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 031 | |
Meridian: 4 | |
Range: 09 | |
Section: 18 | |
County/Municipality: Special Areas No. 3 | |
Well Name: MARL YNGSTN 10-18-31-9 | |
Operator Name: Marlboro Energy Ltd. | |
License Number: 0110810 | |
License Date: 1984-11-19 | |
License Status: Suspension | |
Spud Date: 1984-12-10 | |
Final Drill Date: 1984-12-16 | |
Well Total Depth: 1161.00 m | |
Surface Hole Latitude: 51.658472 | |
Surface Hole Longitude: -111.266681 |
Date | Event |
---|---|
1984-11-19 | Obtained License |
1984-12-11 | Lost Circulation Occurred |
1984-12-11 | Surface Casing Operation Performed |
1984-12-16 | Finished Drilling |
1984-12-16 | Well Mode changed to Drilled and Cased |
1984-12-18 | Well Log Performed |
1984-12-19 | Production Casing Operation Performed |
1984-12-19 | Rig Released |
1985-01-02 | Well Log Performed |
1985-01-03 | Perforation Treatment Performed - Jet Perforation |
1985-01-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-01-13 | Well Began Production |
1985-01-13 | Well Fluid changed to Crude Oil |
1985-01-13 | Well Mode changed to Pumping |
1986-03-31 | Well Fluid changed to Crude Oil |
1986-03-31 | Well Mode changed to Suspended |
1988-03-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-03-01 | Perforation Treatment Performed - Cement Squeeze |
1988-03-03 | Perforation Treatment Performed - Jet Perforation |
1988-03-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-03-06 | Perforation Treatment Performed - Jet Perforation |
1988-03-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-03-14 | Well Fluid changed to Crude Oil |
1988-03-14 | Well Mode changed to Pumping |
1988-08-02 | Perforation Treatment Performed - Jet Perforation |
1988-08-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-03-31 | Well Fluid changed to Crude Oil |
1990-03-31 | Well Mode changed to Suspended |
1994-12-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-12-09 | Plug Back Performed |
1994-12-09 | Well Fluid changed to Crude Oil |
1994-12-09 | Well Mode changed to Abandoned Zone |
2005-09-06 | Perforation Treatment Performed - Jet Perforation |
2005-11-03 | Well Fluid changed to Crude Oil |
2005-11-03 | Well Mode changed to Pumping |
2017-09-01 | Well Fluid changed to Crude Oil |
2017-09-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1985-01-03 | Perforation | 1128.00 | 1130.70 | 3 |
1988-08-03 | Acid Treatment | 1127.90 | 1129.50 | 0 |
1994-12-09 | Packing Device Capped w/Cement | 1115.00 | 1123.00 | 0 |
2005-09-06 | Perforation | 1127.90 | 1130.70 | 13 |
1985-01-07 | Acid Treatment | 1128.00 | 1130.70 | 0 |
1988-03-01 | Acid Treatment | 1128.00 | 1130.70 | 0 |
1988-03-01 | Cement Squeeze | 1128.00 | 1130.70 | 0 |
1988-03-03 | Perforation | 1128.00 | 1129.00 | 13 |
1988-03-05 | Acid Treatment | 1128.00 | 1129.00 | 0 |
1988-03-06 | Perforation | 1128.00 | 1129.50 | 13 |
1988-03-07 | Acid Treatment | 1128.00 | 1129.50 | 0 |
1988-08-02 | Perforation | 1127.90 | 1129.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1985 | 7035 | 0.0 | 0.0 | 0.0 |
1986 | 2136 | 0.0 | 0.0 | 0.0 |
1988 | 6432 | 0.0 | 0.0 | 0.0 |
1989 | 4619 | 0.0 | 0.0 | 0.0 |
1990 | 1186 | 0.0 | 0.0 | 0.0 |
2005 | 1416 | 0.0 | 0.0 | 0.0 |
2006 | 8587 | 0.0 | 0.0 | 0.0 |
2007 | 8571 | 0.0 | 0.0 | 0.0 |
2008 | 8674 | 0.0 | 0.0 | 0.0 |
2009 | 8596 | 0.0 | 0.0 | 0.0 |
2010 | 7983 | 0.0 | 0.0 | 0.0 |
2011 | 7809 | 0.0 | 0.0 | 0.0 |
2012 | 6407 | 0.0 | 0.0 | 0.0 |
2013 | 4224 | 0.0 | 0.0 | 0.0 |
2014 | 8348 | 0.0 | 0.0 | 0.0 |
2015 | 8531 | 0.0 | 0.0 | 0.0 |
2016 | 8759 | 0.0 | 0.0 | 0.0 |
2017 | 216 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1984-12-11 | Lost Circulation | 127.00 | 180.00 |
For data sources see[6]