X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314081610000

Well Details

Well ID: 0314081610000
Loading map...
Location: 00/10-16-031-08W4/0
Location Alias: 00/10-16-31-08 W4M
Location Alias 2: 00/10-16-031-08 W4/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 08
Section: 16
County/Municipality: Special Areas No. 3
Well Name: PETROREP ET AL YNGSTN 10-16-31-8
Operator Name: Petrorep (Canada) Ltd.
License Number: 0068577
License Date: 1978-02-24
License Status: RecCertified
Spud Date: 1978-03-24
Final Drill Date: 1978-03-27
Well Total Depth: 929.60 m
Surface Hole Latitude: 51.658507
Surface Hole Longitude: -111.075509

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-02-24 Obtained License
1978-03-25 Drill Stem Test Performed
1978-03-27 Finished Drilling
1978-03-28 Drill Stem Test Performed
1978-03-29 Drill Stem Test Performed
1978-03-29 Production Casing Operation Performed
1978-10-06 Perforation Treatment Performed - Jet Perforation
1978-10-26 Perforation Treatment Performed - Fractured
1978-10-30 Well Mode changed to Drilled and Cased
1979-03-15 Well Began Production
1979-03-15 Well Fluid changed to Gas
1979-03-15 Well Mode changed to Flowing
1979-08-28 Perforation Treatment Performed - Cement Squeeze
1979-08-31 Perforation Treatment Performed - Jet Perforation
1979-09-21 Perforation Treatment Performed - Alcohol Squeeze
1982-01-01 Well Fluid changed to Gas
1982-01-01 Well Mode changed to Suspended
1987-05-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-05-16 Plug Back Performed
1987-05-16 Well Abandoned
1987-05-16 Well Fluid changed to Gas
1987-05-16 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-10-06 Perforation 865.00 867.20 7
1978-10-06 Perforation 870.50 871.70 7
1978-10-06 Perforation 875.70 876.90 7
1978-10-26 Fracture 865.00 876.90 0
1979-08-28 Cement Squeeze 865.00 876.90 0
1979-08-31 Perforation 865.00 866.90 7
1979-09-21 Alchohol Squeeze 865.00 866.90 0
1987-05-16 Packing Device Capped w/Cement 854.50 862.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 3266 0.0 0.0 0.0
1980 477 0.0 0.0 0.0

For data sources see[5]

References