If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0305051714002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.577228,"lon":-114.670563,"icon":""}]} |
Location: 00/14-17-030-05W5/2 | |
Location Alias: 00/14-17-30-05 W5M | |
Location Alias 2: 00/14-17-030-05 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 030 | |
Meridian: 5 | |
Range: 05 | |
Section: 17 | |
County/Municipality: Mountain View County | |
Well Name: TQN PWEI LOCHEND 14-17-30-5 | |
Operator Name: TAQA North Ltd. | |
License Number: 0341542 | |
License Date: 2005-10-31 | |
License Status: Abandoned | |
Spud Date: 2005-11-15 | |
Final Drill Date: 2005-12-12 | |
Well Total Depth: 2980.00 m | |
Surface Hole Latitude: 51.577228 | |
Surface Hole Longitude: -114.670563 |
Date | Event |
---|---|
2005-10-31 | Obtained License |
2005-11-18 | Surface Casing Operation Performed |
2005-11-20 | Direction Drilling Operation Performed - Deviate |
2005-12-07 | Direction Drilling Operation Performed - Deviate |
2005-12-12 | Finished Drilling |
2005-12-12 | Well Log Performed |
2005-12-12 | Well Mode changed to Drilled and Cased |
2005-12-13 | Well Log Performed |
2005-12-14 | Production Casing Operation Performed |
2005-12-15 | Rig Released |
2009-02-24 | Well Log Performed |
2009-02-26 | Perforation Treatment Performed - Jet Perforation |
2009-02-26 | Well Log Performed |
2009-02-27 | Well Log Performed |
2014-06-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-06-08 | Plug Back Performed |
2014-06-08 | Well Mode changed to Abandoned Zone |
2014-06-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-06-09 | Perforation Treatment Performed - Jet Perforation |
2014-06-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-06-12 | Perforation Treatment Performed - Cement Squeeze |
2014-06-13 | Perforation Treatment Performed - Jet Perforation |
2014-06-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-06-14 | Perforation Treatment Performed - Cement Squeeze |
2014-06-14 | Plug Back Performed |
2014-06-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-06-15 | Perforation Treatment Performed - Jet Perforation |
2014-06-15 | Well Log Performed |
2014-06-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-06-16 | Perforation Treatment Performed - Cement Squeeze |
2014-07-09 | Well Abandoned |
2014-07-09 | Well Mode changed to Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2005-11-20 | 634.00 | Deviate (5 - 79 degrees) |
2005-12-07 | 2293.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-02-26 | Perforation | 2907.00 | 2909.00 | 13 |
2014-06-12 | Packing Device Capped w/Cement | 858.00 | 868.00 | 0 |
2014-06-12 | Packing Device Capped w/Cement | 781.00 | 785.00 | 0 |
2014-06-13 | Perforation | 779.00 | 781.00 | 20 |
2014-06-14 | Cement Squeeze | 779.00 | 781.00 | 0 |
2014-06-14 | Packing Device Capped w/Cement | 760.00 | 770.00 | 0 |
2014-06-15 | Packing Device Capped w/Cement | 680.00 | 685.00 | 0 |
2014-06-15 | Perforation | 679.00 | 680.00 | 20 |
2014-06-16 | Cement Squeeze | 679.00 | 680.00 | 0 |
2014-06-16 | Packing Device Capped w/Cement | 664.00 | 674.00 | 0 |
2009-02-26 | Perforation | 2824.00 | 2827.00 | 13 |
2014-06-08 | Packing Device Capped w/Cement | 2812.00 | 2820.00 | 0 |
2014-06-09 | Packing Device Capped w/Cement | 1042.00 | 1050.00 | 0 |
2014-06-09 | Perforation | 1040.00 | 1042.00 | 20 |
2014-06-09 | Perforation | 880.00 | 881.00 | 20 |
2014-06-12 | Cement Squeeze | 1040.00 | 1042.00 | 0 |
2014-06-12 | Packing Device Capped w/Cement | 1010.00 | 1028.00 | 0 |
2014-06-12 | Cement Squeeze | 880.00 | 881.00 | 0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-06-08 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]