If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0305051109003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.556489,"lon":-114.58968,"icon":""}]} |
Location: 00/09-11-030-05W5/3 | |
Location Alias: 00/09-11-30-05 W5M | |
Location Alias 2: 00/09-11-030-05 W5/03 | |
Country: Canada | |
Province: Alberta | |
Township: 030 | |
Meridian: 5 | |
Range: 05 | |
Section: 11 | |
County/Municipality: Mountain View County | |
Well Name: BONAVISTA LOCHEND 9-11-30-5 | |
Operator Name: Bonavista Energy Corporation | |
License Number: 0334181 | |
License Date: 2005-07-07 | |
License Status: Amended | |
Spud Date: 2006-08-24 | |
Final Drill Date: 2006-08-29 | |
Well Total Depth: 3032.00 m | |
Surface Hole Latitude: 51.556489 | |
Surface Hole Longitude: -114.589680 |
Date | Event |
---|---|
2005-07-07 | Obtained License |
2006-08-29 | Finished Drilling |
2006-08-29 | Well Mode changed to Drilled and Cased |
2006-08-31 | Well Log Performed |
2006-09-01 | Production Casing Operation Performed |
2006-09-02 | Rig Released |
2006-09-05 | Perforation Treatment Performed - Jet Perforation |
2006-09-05 | Well Log Performed |
2006-09-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-09-09 | Perforation Treatment Performed - Jet Perforation |
2006-09-09 | Plug Back Performed |
2006-09-09 | Well Log Performed |
2006-12-28 | Well Began Production |
2006-12-28 | Well Fluid changed to Gas |
2006-12-28 | Well Mode changed to Pumping |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-09-05 | Perforation | 2966.00 | 2970.50 | 17 |
2006-09-09 | Packing Device Capped w/Cement | 2942.00 | 2950.00 | 0 |
2006-09-09 | Perforation | 2684.00 | 2686.00 | 17 |
2006-09-09 | Perforation | 2680.00 | 2682.00 | 17 |
2006-09-09 | Perforation | 2663.50 | 2666.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 75 | 0.0 | 0.0 | 0.0 |
2007 | 7973 | 0.0 | 0.0 | 0.0 |
2008 | 7259 | 0.0 | 0.0 | 0.0 |
2009 | 7813 | 0.0 | 0.0 | 0.0 |
2010 | 8503 | 0.0 | 0.0 | 0.0 |
2011 | 8447 | 0.0 | 0.0 | 0.0 |
2012 | 8783 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 5601 | 0.0 | 0.0 | 0.0 |
2015 | 8171 | 0.0 | 0.0 | 0.0 |
2016 | 8759 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8113 | 0.0 | 0.0 | 0.0 |
2019 | 8697 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]