X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0305033116000

Well Details

Well ID: 0305033116000
Loading map...
Location: 00/16-31-030-03W5/0
Location Alias: 00/16-31-30-03 W5M
Location Alias 2: 00/16-31-030-03 W5/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 5
Range: 03
Section: 31
County/Municipality: Mountain View County
Well Name: BONAVISTA CROSS 16-31-30-3
Operator Name: Bonavista Energy Corporation
License Number: 0017857
License Date: 1959-09-29
License Status: Issued
Spud Date: 1959-09-30
Final Drill Date: 1959-10-17
Well Total Depth: 2148.80 m
Surface Hole Latitude: 51.618638
Surface Hole Longitude: -114.403400

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-09-29 Obtained License
1959-10-17 Finished Drilling
1959-10-17 Well Mode changed to Drilled and Cased
1959-10-21 Production Casing Operation Performed
1959-11-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-11-02 Perforation Treatment Performed - Selective Jet Perforations
1959-11-09 Well Began Production
1959-11-09 Well Fluid changed to Crude Oil
1959-11-09 Well Mode changed to Flowing
1959-12-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-12-08 Well Fluid changed to Crude Oil
1961-12-08 Well Mode changed to Pumping
1976-09-08 Perforation Treatment Performed - Condensate Squeeze
1977-07-01 Well Fluid changed to Crude Oil
1977-07-01 Well Mode changed to Suspended
1989-06-15 Well Fluid changed to Crude Oil
1989-06-15 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-11-02 Selective Jet Perforations 2115.60 2115.90 0
1959-11-02 Selective Jet Perforations 2116.20 2116.50 0
1959-11-02 Selective Jet Perforations 2116.80 2117.10 0
1959-11-02 Selective Jet Perforations 2117.40 2118.10 0
1959-11-02 Acid Treatment 2115.60 2118.10 0
1959-12-11 Acid Treatment 2115.60 2118.10 0
1976-09-08 Condensate Squeeze 2115.60 2118.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1972 408 0.0 0.0 0.0
1973 6671 0.0 0.0 0.0
1974 8759 0.0 0.0 0.0
1975 8699 0.0 0.0 0.0
1976 381 0.0 0.0 0.0
1977 528 0.0 0.0 0.0
1989 4218 0.0 0.0 0.0
1990 8291 0.0 0.0 0.0
1991 8630 0.0 0.0 0.0
1992 8528 0.0 0.0 0.0
1993 6969 0.0 0.0 0.0
1994 8307 0.0 0.0 0.0
1995 8635 0.0 0.0 0.0
1996 8735 0.0 0.0 0.0
1997 8652 0.0 0.0 0.0
1998 7296 0.0 0.0 0.0
1999 7834 0.0 0.0 0.0
2000 8532 0.0 0.0 0.0
2001 8709 0.0 0.0 0.0
2002 8738 0.0 0.0 0.0
2003 8585 0.0 0.0 0.0
2004 8567 0.0 0.0 0.0
2005 8711 0.0 0.0 0.0
2006 7368 0.0 0.0 0.0
2007 8256 0.0 0.0 0.0
2008 8279 0.0 0.0 0.0
2009 8000 0.0 0.0 0.0
2010 8363 0.0 0.0 0.0
2011 8663 0.0 0.0 0.0
2012 8711 0.0 0.0 0.0
2013 8015 0.0 0.0 0.0
2014 3142 0.0 0.0 0.0
2015 8736 0.0 0.0 0.0
2016 7033 0.0 0.0 0.0
2017 1670 0.0 0.0 0.0
2018 6887 0.0 0.0 0.0
2019 7675 0.0 0.0 0.0
2020 2173 0.0 0.0 0.0

For data sources see[5]

References