X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0305010216002

Well Details

Well ID: 0305010216002
Loading map...
Location: 00/16-02-030-01W5/2
Location Alias: 00/16-02-30-01 W5M
Location Alias 2: 00/16-02-030-01 W5/02
Country: Canada
Province: Alberta
Township: 030
Meridian: 5
Range: 01
Section: 02
County/Municipality: Mountain View County
Well Name: COTTON FLAME CROSSE 16-2-30-1
Operator Name: Cotton Petroleum Corporation
License Number: 0099710
License Date: 1982-12-13
License Status: RecCertified
Spud Date: 1982-12-16
Final Drill Date: 1982-12-27
Well Total Depth: 1776.00 m
Surface Hole Latitude: 51.545279
Surface Hole Longitude: -114.027066

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-12-13 Obtained License
1982-12-27 Finished Drilling
1982-12-27 Well Mode changed to Drilled and Cased
1982-12-29 Well Log Performed
1982-12-30 Production Casing Operation Performed
1983-01-06 Perforation Treatment Performed - Jet Perforation
1983-01-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-01-09 Perforation Treatment Performed - Jet Perforation
1983-01-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-01-11 Perforation Treatment Performed - Fractured
1983-02-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-02-21 Perforation Treatment Performed - Jet Perforation
1983-02-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-02-24 Perforation Treatment Performed - Jet Perforation
1983-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-03-01 Well Fluid changed to Gas
1983-03-01 Well Mode changed to Testing
1983-03-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-03-02 Well Fluid changed to Gas
1983-03-02 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-01-06 Perforation 1742.20 1744.00 13
1983-02-25 Acid Treatment 1254.80 1258.20 0
1983-03-02 Packing Device Capped w/Cement 1232.00 1240.00 0
1983-01-07 Acid Treatment 1742.20 1744.00 0
1983-01-09 Perforation 1742.20 1744.00 13
1983-01-10 Acid Treatment 1742.20 1744.00 0
1983-01-11 Fracture 1742.20 1744.00 0
1983-02-21 Packing Device Capped w/Cement 1722.00 1730.00 0
1983-02-21 Perforation 1261.50 1264.00 4
1983-02-22 Acid Treatment 1261.50 1264.00 0
1983-02-24 Perforation 1254.80 1258.20 4

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 24 0.0 0.0 0.0

For data sources see[5]

References