X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0305010102000

Well Details

Well ID: 0305010102000
Loading map...
Location: 00/02-01-030-01W5/0
Location Alias: 00/02-01-30-01 W5M
Location Alias 2: 00/02-01-030-01 W5/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 5
Range: 01
Section: 01
County/Municipality: Mountain View County
Well Name: NEO GARR 2-1-30-1
Operator Name: NEO Exploration Inc.
License Number: 0073810
License Date: 1979-01-09
License Status: Abandoned
Spud Date: 1979-02-09
Final Drill Date: 1979-02-20
Well Total Depth: 1765.00 m
Surface Hole Latitude: 51.536134
Surface Hole Longitude: -114.008306

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-01-09 Obtained License
1979-02-20 Finished Drilling
1979-02-20 Well Mode changed to Drilled and Cased
1979-02-22 Production Casing Operation Performed
1979-03-01 Perforation Treatment Performed - Jet Perforation
1979-03-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-03-03 Perforation Treatment Performed - Fractured
1979-04-13 Well Began Production
1979-04-13 Well Fluid changed to Crude Oil
1979-04-13 Well Mode changed to Pumping
1979-05-09 Perforation Treatment Performed - Fractured
1979-06-13 Perforation Treatment Performed - Fractured
1993-01-29 Well Fluid changed to Crude Oil
1993-01-29 Well Mode changed to Suspended
1993-08-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-08-19 Perforation Treatment Performed - Jet Perforation
1993-08-19 Perforation Treatment Performed - Remedial Casing
1993-08-19 Plug Back Performed
1993-08-19 Well Fluid changed to Crude Oil
1993-08-19 Well Log Performed
1993-08-19 Well Mode changed to Abandoned
1993-08-20 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-03-01 Perforation 1733.50 1737.60 13
1979-03-02 Acid Treatment 1733.50 1737.60 0
1979-03-03 Fracture 1733.50 1737.60 0
1979-05-09 Fracture 1733.50 1737.60 0
1979-06-13 Fracture 1733.50 1737.60 0
1993-08-19 Packing Device Capped w/Cement 1716.50 1725.00 0
1993-08-19 Perforation 556.00 557.00 13
1993-08-19 Remedial Casing Cementing 556.00 557.00 0
1993-08-19 Packing Device Capped w/Cement 510.00 550.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 3113 0.0 0.0 0.0
1980 6654 0.0 0.0 0.0
1981 5331 0.0 0.0 0.0
1982 3337 0.0 0.0 0.0
1983 6892 0.0 0.0 0.0
1984 8116 0.0 0.0 0.0
1985 8279 0.0 0.0 0.0
1986 8459 0.0 0.0 0.0
1987 8179 0.0 0.0 0.0
1988 8599 0.0 0.0 0.0
1989 4072 0.0 0.0 0.0
1990 6710 0.0 0.0 0.0
1991 8752 0.0 0.0 0.0
1992 8692 0.0 0.0 0.0
1993 600 0.0 0.0 0.0

For data sources see[5]

References