X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304272012000

Well Details

Well ID: 0304272012000
Loading map...
Location: 00/12-20-030-27W4/0
Location Alias: 00/12-20-30-27 W4M
Location Alias 2: 00/12-20-030-27 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 27
Section: 20
County/Municipality: Mountain View County
Well Name: PWEI UNIT #1 LPINECK 12-20-30-27
Operator Name: TAQA North Ltd.
License Number: 0024149
License Date: 1963-05-14
License Status: Suspension
Spud Date: 1963-05-17
Final Drill Date: 1963-06-17
Well Total Depth: 2471.90 m
Surface Hole Latitude: 51.584969
Surface Hole Longitude: -113.775872

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-05-14 Obtained License
1963-06-10 Drill Stem Test Performed
1963-06-17 Finished Drilling
1963-06-17 Well Mode changed to Drilled and Cased
1963-06-18 Drill Stem Test Performed
1963-06-20 Production Casing Operation Performed
1963-06-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-06-21 Perforation Treatment Performed - Jet Perforation
1963-06-26 Well Began Production
1963-06-26 Well Fluid changed to Crude Oil
1963-06-26 Well Mode changed to Flowing
1963-07-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-01-09 Perforation Treatment Performed - Cement Squeeze
1964-01-13 Perforation Treatment Performed - Abrasa-Jet Perforation
1964-01-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-01-27 Well Fluid changed to Crude Oil
1964-01-27 Well Mode changed to Pumping
1965-05-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-10-30 Well Fluid changed to Crude Oil
1968-10-30 Well Mode changed to Suspended
1973-06-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1973-06-15 Well Fluid changed to Crude Oil
1973-06-15 Well Mode changed to Abandoned Zone
1973-06-19 Perforation Treatment Performed - Jet Perforation
1973-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-06-28 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-06-21 Perforation 2451.50 2452.40 13
1973-06-25 Acid Treatment 2308.90 2315.30 0
1973-06-28 Fracture 2308.90 2315.30 0
1963-06-21 Acid Treatment 2451.50 2452.40 0
1963-07-15 Acid Treatment 2451.50 2452.40 0
1964-01-09 Cement Squeeze 2451.50 2452.40 0
1964-01-13 Hydra Jet Perforation 2452.10 2452.10 0
1964-01-13 Acid Treatment 2452.10 2452.10 0
1965-05-25 Acid Treatment 2452.10 2452.10 0
1973-06-15 Packing Device Capped w/Cement 2430.80 2439.90 0
1973-06-19 Perforation 2308.90 2315.30 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 233 0.0 0.0 0.0
1973 1 0.0 0.0 0.0

For data sources see[5]

References