If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0304263616000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.616432,"lon":-113.523105,"icon":""}]} |
Location: 00/16-36-030-26W4/0 | |
Location Alias: 00/16-36-30-26 W4M | |
Location Alias 2: 00/16-36-030-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 030 | |
Meridian: 4 | |
Range: 26 | |
Section: 36 | |
County/Municipality: Kneehill County | |
Well Name: EMBER TWINING 16-36-30-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0422603 | |
License Date: 2010-08-12 | |
License Status: Issued | |
Spud Date: 2010-10-20 | |
Final Drill Date: 2010-11-20 | |
Well Total Depth: 979.00 m | |
Surface Hole Latitude: 51.616432 | |
Surface Hole Longitude: -113.523105 |
Date | Event |
---|---|
2010-08-12 | Obtained License |
2010-10-20 | Surface Casing Operation Performed |
2010-11-20 | Finished Drilling |
2010-11-20 | Production Casing Operation Performed |
2010-11-20 | Rig Released |
2010-11-20 | Well Mode changed to Drilled and Cased |
2010-12-03 | Well Log Performed |
2011-01-08 | Perforation Treatment Performed - Jet Perforation |
2011-01-12 | Perforation Treatment Performed - Fractured |
2011-01-15 | Well Fluid changed to Coalbed Methane-Coals Only |
2011-01-15 | Well Mode changed to Testing |
2011-01-29 | Well Began Production |
2011-01-29 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-01-29 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-01-08 | Perforation | 474.90 | 475.90 | 13 |
2011-01-08 | Perforation | 596.00 | 596.50 | 13 |
2011-01-08 | Perforation | 378.50 | 380.00 | 13 |
2011-01-08 | Perforation | 344.80 | 345.30 | 13 |
2011-01-08 | Perforation | 400.60 | 401.10 | 13 |
2011-01-08 | Perforation | 367.40 | 367.90 | 13 |
2011-01-08 | Perforation | 350.60 | 351.10 | 13 |
2011-01-08 | Perforation | 540.00 | 541.00 | 13 |
2011-01-08 | Perforation | 617.90 | 618.40 | 13 |
2011-01-08 | Perforation | 616.50 | 617.50 | 13 |
2011-01-08 | Perforation | 615.20 | 615.70 | 13 |
2011-01-08 | Perforation | 472.60 | 474.10 | 13 |
2011-01-08 | Perforation | 627.70 | 628.20 | 13 |
2011-01-08 | Perforation | 638.40 | 639.40 | 13 |
2011-01-08 | Perforation | 631.90 | 632.40 | 13 |
2011-01-08 | Perforation | 628.90 | 629.40 | 13 |
2011-01-08 | Perforation | 582.20 | 582.70 | 13 |
2011-01-08 | Perforation | 583.90 | 585.40 | 13 |
2011-01-08 | Perforation | 575.20 | 575.70 | 13 |
2011-01-08 | Perforation | 571.10 | 572.60 | 13 |
2011-01-08 | Perforation | 611.80 | 612.80 | 13 |
2011-01-08 | Perforation | 600.10 | 602.60 | 13 |
2011-01-08 | Perforation | 467.60 | 468.10 | 13 |
2011-01-08 | Perforation | 613.90 | 614.40 | 13 |
2011-01-12 | Fracture | 378.50 | 380.00 | 0 |
2011-01-12 | Fracture | 596.00 | 596.50 | 0 |
2011-01-12 | Fracture | 600.10 | 614.40 | 0 |
2011-01-12 | Fracture | 627.70 | 639.40 | 0 |
2011-01-12 | Fracture | 338.90 | 367.90 | 0 |
2011-01-12 | Fracture | 400.60 | 585.40 | 0 |
2011-01-08 | Perforation | 476.40 | 476.90 | 13 |
2011-01-08 | Perforation | 539.00 | 539.50 | 13 |
2011-01-08 | Perforation | 535.70 | 536.20 | 13 |
2011-01-08 | Perforation | 520.10 | 521.10 | 13 |
2011-01-08 | Perforation | 412.50 | 413.00 | 13 |
2011-01-08 | Perforation | 338.90 | 339.40 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 8098 | 0.0 | 0.0 | 0.0 |
2012 | 8668 | 0.0 | 0.0 | 0.0 |
2013 | 8751 | 0.0 | 0.0 | 0.0 |
2014 | 8734 | 0.0 | 0.0 | 0.0 |
2015 | 8749 | 0.0 | 0.0 | 0.0 |
2016 | 8782 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]