If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0304262608000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.5948,"lon":-113.54738,"icon":""}]} |
Location: 00/08-26-030-26W4/0 | |
Location Alias: 00/08-26-30-26 W4M | |
Location Alias 2: 00/08-26-030-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 030 | |
Meridian: 4 | |
Range: 26 | |
Section: 26 | |
County/Municipality: Kneehill County | |
Well Name: EMBER SD TWINING 8-26-30-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0423453 | |
License Date: 2010-09-13 | |
License Status: Issued | |
Spud Date: 2010-11-02 | |
Final Drill Date: 2010-11-03 | |
Well Total Depth: 1024.00 m | |
Surface Hole Latitude: 51.594800 | |
Surface Hole Longitude: -113.547380 |
Date | Event |
---|---|
2010-09-13 | Obtained License |
2010-11-02 | Direction Drilling Operation Performed - Deviate |
2010-11-02 | Surface Casing Operation Performed |
2010-11-03 | Finished Drilling |
2010-11-03 | Production Casing Operation Performed |
2010-11-03 | Rig Released |
2010-11-03 | Well Mode changed to Drilled and Cased |
2010-11-08 | Well Log Performed |
2010-12-08 | Perforation Treatment Performed - Jet Perforation |
2010-12-17 | Perforation Treatment Performed - Fractured |
2010-12-21 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-12-21 | Well Mode changed to Testing |
2011-01-07 | Well Began Production |
2011-01-07 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-01-07 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-11-02 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-12-08 | Perforation | 523.10 | 523.60 | 13 |
2010-12-08 | Perforation | 443.00 | 445.00 | 13 |
2010-12-08 | Perforation | 377.40 | 377.90 | 13 |
2010-12-08 | Perforation | 510.60 | 511.10 | 13 |
2010-12-08 | Perforation | 447.20 | 447.70 | 13 |
2010-12-08 | Perforation | 395.30 | 395.80 | 13 |
2010-12-08 | Perforation | 622.20 | 622.70 | 13 |
2010-12-08 | Perforation | 685.00 | 685.50 | 13 |
2010-12-08 | Perforation | 676.40 | 676.90 | 13 |
2010-12-08 | Perforation | 673.70 | 674.70 | 13 |
2010-12-08 | Perforation | 928.50 | 930.00 | 13 |
2010-12-08 | Perforation | 518.70 | 520.20 | 13 |
2010-12-08 | Perforation | 903.90 | 904.40 | 13 |
2010-12-08 | Perforation | 863.90 | 864.40 | 13 |
2010-12-08 | Perforation | 656.50 | 657.00 | 13 |
2010-12-08 | Perforation | 650.20 | 650.70 | 13 |
2010-12-08 | Perforation | 640.80 | 641.80 | 13 |
2010-12-08 | Perforation | 623.20 | 623.70 | 13 |
2010-12-08 | Perforation | 654.30 | 655.30 | 13 |
2010-12-08 | Perforation | 642.60 | 644.10 | 13 |
2010-12-08 | Perforation | 651.70 | 652.70 | 13 |
2010-12-17 | Fracture | 443.00 | 445.00 | 0 |
2010-12-08 | Perforation | 513.20 | 515.20 | 13 |
2010-12-17 | Fracture | 308.00 | 395.80 | 0 |
2010-12-17 | Fracture | 673.70 | 685.50 | 0 |
2010-12-17 | Fracture | 447.20 | 657.00 | 0 |
2010-12-08 | Perforation | 564.00 | 564.50 | 13 |
2010-12-08 | Perforation | 611.10 | 612.10 | 13 |
2010-12-08 | Perforation | 584.30 | 585.80 | 13 |
2010-12-08 | Perforation | 581.00 | 581.50 | 13 |
2010-12-08 | Perforation | 368.10 | 368.60 | 13 |
2010-12-08 | Perforation | 308.00 | 308.50 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 24 | 0.0 | 0.0 | 0.0 |
2011 | 8602 | 0.0 | 0.0 | 0.0 |
2012 | 8668 | 0.0 | 0.0 | 0.0 |
2013 | 8751 | 0.0 | 0.0 | 0.0 |
2014 | 8734 | 0.0 | 0.0 | 0.0 |
2015 | 8749 | 0.0 | 0.0 | 0.0 |
2016 | 8782 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]