If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0304262607000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.594797,"lon":-113.553384,"icon":""}]} |
Location: 00/07-26-030-26W4/0 | |
Location Alias: 00/07-26-30-26 W4M | |
Location Alias 2: 00/07-26-030-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 030 | |
Meridian: 4 | |
Range: 26 | |
Section: 26 | |
County/Municipality: Kneehill County | |
Well Name: EMBER SD TWINING 7-26-30-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0423473 | |
License Date: 2010-09-14 | |
License Status: Issued | |
Spud Date: 2010-10-31 | |
Final Drill Date: 2010-11-01 | |
Well Total Depth: 1004.00 m | |
Surface Hole Latitude: 51.594797 | |
Surface Hole Longitude: -113.553384 |
Date | Event |
---|---|
2010-09-14 | Obtained License |
2010-10-31 | Surface Casing Operation Performed |
2010-11-01 | Direction Drilling Operation Performed - Deviate |
2010-11-01 | Finished Drilling |
2010-11-01 | Well Mode changed to Drilled and Cased |
2010-11-02 | Production Casing Operation Performed |
2010-11-02 | Rig Released |
2010-11-07 | Well Log Performed |
2010-11-28 | Perforation Treatment Performed - Jet Perforation |
2010-11-29 | Perforation Treatment Performed - Jet Perforation |
2010-12-02 | Perforation Treatment Performed - Fractured |
2010-12-05 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-12-05 | Well Mode changed to Testing |
2011-01-12 | Well Began Production |
2011-01-12 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-01-12 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-11-01 | 114.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-11-28 | Perforation | 566.80 | 567.30 | 13 |
2010-11-28 | Perforation | 504.70 | 505.20 | 13 |
2010-11-28 | Perforation | 497.70 | 498.20 | 13 |
2010-11-28 | Perforation | 482.90 | 484.40 | 13 |
2010-11-28 | Perforation | 649.40 | 650.40 | 13 |
2010-11-28 | Perforation | 640.50 | 641.00 | 13 |
2010-11-28 | Perforation | 654.40 | 654.90 | 13 |
2010-11-28 | Perforation | 660.90 | 661.40 | 13 |
2010-11-28 | Perforation | 955.50 | 956.50 | 13 |
2010-11-28 | Perforation | 634.60 | 635.10 | 13 |
2010-11-28 | Perforation | 628.40 | 628.90 | 13 |
2010-11-28 | Perforation | 558.80 | 560.30 | 13 |
2010-11-28 | Perforation | 619.30 | 622.30 | 13 |
2010-11-28 | Perforation | 598.90 | 599.40 | 13 |
2010-11-28 | Perforation | 632.70 | 633.20 | 13 |
2010-11-28 | Perforation | 630.40 | 630.90 | 13 |
2010-11-29 | Perforation | 421.00 | 423.50 | 13 |
2010-11-29 | Perforation | 386.50 | 387.00 | 13 |
2010-11-29 | Perforation | 416.00 | 420.00 | 13 |
2010-11-29 | Perforation | 353.10 | 353.60 | 13 |
2010-11-29 | Perforation | 292.30 | 292.80 | 13 |
2010-11-29 | Perforation | 348.70 | 349.20 | 13 |
2010-11-28 | Perforation | 539.00 | 540.00 | 13 |
2010-12-02 | Fracture | 614.00 | 618.00 | 0 |
2010-12-02 | Fracture | 649.40 | 654.90 | 0 |
2010-12-02 | Fracture | 386.50 | 420.00 | 0 |
2010-12-02 | Fracture | 292.20 | 353.60 | 0 |
2010-12-02 | Fracture | 619.30 | 641.00 | 0 |
2010-12-02 | Fracture | 482.90 | 599.40 | 0 |
2010-11-28 | Perforation | 597.80 | 598.30 | 13 |
2010-11-28 | Perforation | 588.00 | 588.50 | 13 |
2010-11-28 | Perforation | 586.00 | 587.00 | 13 |
2010-11-28 | Perforation | 426.10 | 426.60 | 13 |
2010-11-28 | Perforation | 617.00 | 618.00 | 13 |
2010-11-28 | Perforation | 614.00 | 616.00 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 24 | 0.0 | 0.0 | 0.0 |
2011 | 8199 | 0.0 | 0.0 | 0.0 |
2012 | 8449 | 0.0 | 0.0 | 0.0 |
2013 | 8590 | 0.0 | 0.0 | 0.0 |
2014 | 8104 | 0.0 | 0.0 | 0.0 |
2015 | 8749 | 0.0 | 0.0 | 0.0 |
2016 | 8782 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]