X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304262510000

Well Details

Well ID: 0304262510000
Loading map...
Location: 00/10-25-030-26W4/0
Location Alias: 00/10-25-30-26 W4M
Location Alias 2: 00/10-25-030-26 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 26
Section: 25
County/Municipality: Kneehill County
Well Name: EMBER SD TWINING 10-25-30-26
Operator Name: Ember Resources Inc.
License Number: 0424034
License Date: 2010-09-29
License Status: Issued
Spud Date: 2010-10-15
Final Drill Date: 2010-10-17
Well Total Depth: 1225.00 m
Surface Hole Latitude: 51.603787
Surface Hole Longitude: -113.525892

For data sources see[1][2]

Well History

Date Event
2010-09-29 Obtained License
2010-10-15 Direction Drilling Operation Performed - Deviate
2010-10-16 Surface Casing Operation Performed
2010-10-17 Finished Drilling
2010-10-17 Production Casing Operation Performed
2010-10-17 Rig Released
2010-10-17 Well Mode changed to Drilled and Cased
2010-10-20 Well Log Performed
2010-12-02 Perforation Treatment Performed - Jet Perforation
2010-12-04 Perforation Treatment Performed - Fractured
2010-12-07 Well Fluid changed to Coalbed Methane-Coals Only
2010-12-07 Well Mode changed to Testing
2011-01-07 Well Began Production
2011-01-07 Well Fluid changed to Coalbed Methane-Coals and Other
2011-01-07 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-10-15 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-12-02 Perforation 596.00 596.50 13
2010-12-02 Perforation 352.10 352.60 13
2010-12-02 Perforation 745.00 747.00 13
2010-12-02 Perforation 420.90 421.40 13
2010-12-02 Perforation 454.40 454.90 13
2010-12-02 Perforation 445.20 445.70 13
2010-12-02 Perforation 427.60 428.10 13
2010-12-02 Perforation 776.80 777.80 13
2010-12-02 Perforation 773.00 773.50 13
2010-12-02 Perforation 770.30 770.80 13
2010-12-02 Perforation 788.50 789.00 13
2010-12-02 Perforation 593.80 594.80 13
2010-12-02 Perforation 800.70 801.20 13
2010-12-02 Perforation 792.60 793.10 13
2010-12-02 Perforation 789.90 790.40 13
2010-12-02 Perforation 730.80 731.80 13
2010-12-02 Perforation 749.30 751.30 13
2010-12-02 Perforation 711.30 712.80 13
2010-12-02 Perforation 730.00 730.50 13
2010-12-02 Perforation 752.30 753.80 13
2010-12-02 Perforation 765.70 766.70 13
2010-12-02 Perforation 751.10 751.60 13
2010-12-02 Perforation 588.50 589.50 13
2010-12-04 Fracture 745.00 747.00 0
2010-12-04 Fracture 352.10 731.80 0
2010-12-04 Fracture 788.50 801.20 0
2010-12-04 Fracture 749.30 777.80 0
2010-12-02 Perforation 614.40 614.90 13
2010-12-02 Perforation 675.10 677.10 13
2010-12-02 Perforation 672.90 673.40 13
2010-12-02 Perforation 649.70 650.70 13
2010-12-02 Perforation 511.10 511.60 13
2010-12-02 Perforation 419.10 419.60 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 24 0.0 0.0 0.0
2011 8602 0.0 0.0 0.0
2012 8668 0.0 0.0 0.0
2013 8751 0.0 0.0 0.0
2014 8734 0.0 0.0 0.0
2015 8749 0.0 0.0 0.0
2016 8782 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References