If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0304262002000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.582833,"lon":-113.622276,"icon":""}]} |
Location: 00/02-20-030-26W4/0 | |
Location Alias: 00/02-20-30-26 W4M | |
Location Alias 2: 00/02-20-030-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 030 | |
Meridian: 4 | |
Range: 26 | |
Section: 20 | |
County/Municipality: Kneehill County | |
Well Name: EMBER SD WORKMAN 2-20-30-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0440803 | |
License Date: 2011-12-09 | |
License Status: Issued | |
Spud Date: 2012-01-18 | |
Final Drill Date: 2012-01-20 | |
Well Total Depth: 1198.00 m | |
Surface Hole Latitude: 51.582833 | |
Surface Hole Longitude: -113.622276 |
Date | Event |
---|---|
2011-12-09 | Obtained License |
2012-01-18 | Direction Drilling Operation Performed - Deviate |
2012-01-19 | Surface Casing Operation Performed |
2012-01-20 | Finished Drilling |
2012-01-20 | Production Casing Operation Performed |
2012-01-20 | Rig Released |
2012-01-20 | Well Mode changed to Drilled and Cased |
2012-01-25 | Well Log Performed |
2012-02-03 | Perforation Treatment Performed - Jet Perforation |
2012-02-12 | Perforation Treatment Performed - Fractured |
2012-03-09 | Well Began Production |
2012-03-09 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-03-09 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-18 | Precision Drilling Corporation | 159 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-01-18 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-03 | Perforation | 388.00 | 391.00 | 13 |
2012-02-03 | Perforation | 673.00 | 675.00 | 13 |
2012-02-03 | Perforation | 677.60 | 678.60 | 13 |
2012-02-03 | Perforation | 681.50 | 682.00 | 13 |
2012-02-03 | Perforation | 683.20 | 684.20 | 13 |
2012-02-03 | Perforation | 688.90 | 689.40 | 13 |
2012-02-03 | Perforation | 690.90 | 691.90 | 13 |
2012-02-03 | Perforation | 725.00 | 727.00 | 13 |
2012-02-03 | Perforation | 751.80 | 752.30 | 13 |
2012-02-03 | Perforation | 753.70 | 755.20 | 13 |
2012-02-03 | Perforation | 756.00 | 759.00 | 13 |
2012-02-03 | Perforation | 393.00 | 395.00 | 13 |
2012-02-03 | Perforation | 759.50 | 761.50 | 13 |
2012-02-03 | Perforation | 777.50 | 779.50 | 13 |
2012-02-03 | Perforation | 795.50 | 796.00 | 13 |
2012-02-03 | Perforation | 808.10 | 809.60 | 13 |
2012-02-03 | Perforation | 811.00 | 811.50 | 13 |
2012-02-03 | Perforation | 813.10 | 816.10 | 13 |
2012-02-03 | Perforation | 818.90 | 819.40 | 13 |
2012-02-03 | Perforation | 831.60 | 832.60 | 13 |
2012-02-03 | Perforation | 834.00 | 835.00 | 13 |
2012-02-03 | Perforation | 844.00 | 845.00 | 13 |
2012-02-03 | Perforation | 395.00 | 397.00 | 13 |
2012-02-03 | Perforation | 849.60 | 850.60 | 13 |
2012-02-03 | Perforation | 1155.00 | 1157.50 | 13 |
2012-02-12 | Fracture | 388.00 | 850.60 | 0 |
2012-02-03 | Perforation | 539.40 | 540.40 | 13 |
2012-02-03 | Perforation | 545.80 | 546.80 | 13 |
2012-02-03 | Perforation | 551.00 | 551.50 | 13 |
2012-02-03 | Perforation | 618.00 | 618.50 | 13 |
2012-02-03 | Perforation | 657.00 | 659.00 | 13 |
2012-02-03 | Perforation | 659.00 | 661.00 | 13 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 7039 | 0.0 | 0.0 | 0.0 |
2013 | 8751 | 0.0 | 0.0 | 0.0 |
2014 | 8734 | 0.0 | 0.0 | 0.0 |
2015 | 8682 | 0.0 | 0.0 | 0.0 |
2016 | 8522 | 0.0 | 0.0 | 0.0 |
2017 | 8397 | 0.0 | 0.0 | 0.0 |
2018 | 8496 | 0.0 | 0.0 | 0.0 |
2019 | 8318 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]