If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0304260616020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.546491,"lon":-113.640159,"icon":""}]} |
Location: 02/16-06-030-26W4/0 | |
Location Alias: 02/16-06-30-26 W4M | |
Location Alias 2: 02/16-06-030-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 030 | |
Meridian: 4 | |
Range: 26 | |
Section: 06 | |
County/Municipality: Kneehill County | |
Well Name: EMBER ET AL 102 SWALWELL 16-6-30-26 | |
Operator Name: Ember Resources Inc. | |
License Number: 0423618 | |
License Date: 2010-09-20 | |
License Status: Issued | |
Spud Date: 2011-02-07 | |
Final Drill Date: 2011-02-09 | |
Well Total Depth: 1084.00 m | |
Surface Hole Latitude: 51.546491 | |
Surface Hole Longitude: -113.640159 |
Date | Event |
---|---|
2010-09-20 | Obtained License |
2011-01-20 | Surface Casing Operation Performed |
2011-02-07 | Production Casing Operation Performed |
2011-02-09 | Finished Drilling |
2011-02-09 | Well Mode changed to Drilled and Cased |
2011-02-10 | Rig Released |
2011-02-16 | Well Log Performed |
2011-02-24 | Perforation Treatment Performed - Jet Perforation |
2011-02-24 | Well Log Performed |
2011-02-26 | Perforation Treatment Performed - Fractured |
2011-03-08 | Well Began Production |
2011-03-08 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-03-08 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-02-24 | Perforation | 694.00 | 695.00 | 13 |
2011-02-24 | Perforation | 620.00 | 622.00 | 13 |
2011-02-24 | Perforation | 614.00 | 615.00 | 13 |
2011-02-24 | Perforation | 610.20 | 610.70 | 13 |
2011-02-24 | Perforation | 588.00 | 588.50 | 13 |
2011-02-24 | Perforation | 586.00 | 587.00 | 13 |
2011-02-24 | Perforation | 575.20 | 575.70 | 13 |
2011-02-24 | Perforation | 541.50 | 543.00 | 13 |
2011-02-24 | Perforation | 504.00 | 505.00 | 13 |
2011-02-24 | Perforation | 485.00 | 485.50 | 13 |
2011-02-24 | Perforation | 484.00 | 484.50 | 13 |
2011-02-24 | Perforation | 690.50 | 692.00 | 13 |
2011-02-24 | Perforation | 439.50 | 440.00 | 13 |
2011-02-24 | Perforation | 434.50 | 435.00 | 13 |
2011-02-24 | Perforation | 419.80 | 420.30 | 13 |
2011-02-24 | Perforation | 322.50 | 323.00 | 13 |
2011-02-24 | Perforation | 314.00 | 315.00 | 13 |
2011-02-24 | Perforation | 304.70 | 305.20 | 13 |
2011-02-24 | Perforation | 289.00 | 289.50 | 13 |
2011-02-24 | Perforation | 280.50 | 282.00 | 13 |
2011-02-26 | Fracture | 690.50 | 695.00 | 0 |
2011-02-26 | Fracture | 677.50 | 682.50 | 0 |
2011-02-24 | Perforation | 682.00 | 682.50 | 13 |
2011-02-26 | Fracture | 658.00 | 658.50 | 0 |
2011-02-26 | Fracture | 638.90 | 643.20 | 0 |
2011-02-26 | Fracture | 620.00 | 624.50 | 0 |
2011-02-26 | Fracture | 610.20 | 615.00 | 0 |
2011-02-26 | Fracture | 586.00 | 588.50 | 0 |
2011-02-26 | Fracture | 575.20 | 575.70 | 0 |
2011-02-26 | Fracture | 541.50 | 543.00 | 0 |
2011-02-26 | Fracture | 504.00 | 505.00 | 0 |
2011-02-26 | Fracture | 484.00 | 485.50 | 0 |
2011-02-26 | Fracture | 434.50 | 440.00 | 0 |
2011-02-24 | Perforation | 680.50 | 681.50 | 13 |
2011-02-26 | Fracture | 419.80 | 420.30 | 0 |
2011-02-26 | Fracture | 322.50 | 323.00 | 0 |
2011-02-26 | Fracture | 314.00 | 315.00 | 0 |
2011-02-26 | Fracture | 304.70 | 305.20 | 0 |
2011-02-26 | Fracture | 289.00 | 289.50 | 0 |
2011-02-26 | Fracture | 280.50 | 282.00 | 0 |
2011-02-24 | Perforation | 677.50 | 679.50 | 13 |
2011-02-24 | Perforation | 658.00 | 658.50 | 13 |
2011-02-24 | Perforation | 642.20 | 643.20 | 13 |
2011-02-24 | Perforation | 638.90 | 639.40 | 13 |
2011-02-24 | Perforation | 622.50 | 624.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 7045 | 0.0 | 0.0 | 0.0 |
2012 | 8748 | 0.0 | 0.0 | 0.0 |
2013 | 8721 | 0.0 | 0.0 | 0.0 |
2014 | 7799 | 0.0 | 0.0 | 0.0 |
2015 | 8720 | 0.0 | 0.0 | 0.0 |
2016 | 8774 | 0.0 | 0.0 | 0.0 |
2017 | 8697 | 0.0 | 0.0 | 0.0 |
2018 | 8660 | 0.0 | 0.0 | 0.0 |
2019 | 8589 | 0.0 | 0.0 | 0.0 |
2020 | 2175 | 0.0 | 0.0 | 0.0 |
For data sources see[5]