X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304253601000

Well Details

Well ID: 0304253601000
Loading map...
Location: 00/01-36-030-25W4/0
Location Alias: 00/01-36-30-25 W4M
Location Alias 2: 00/01-36-030-25 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 25
Section: 36
County/Municipality: Kneehill County
Well Name: ARTIS HZ TWINING 1-36-30-25
Operator Name: Artis Exploration Ltd.
License Number: 0490601
License Date: 2018-08-27
License Status: Issued
Spud Date: 2018-09-01
Final Drill Date: 2018-09-17
Well Total Depth: 4784.00 m
Surface Hole Latitude: 51.629717
Surface Hole Longitude: -113.384846

For data sources see[1][2]

Well History

Date Event
2018-08-27 Obtained License
2018-09-01 Surface Casing Operation Performed
2018-09-10 Intermediate Casing Operation Performed
2018-09-11 Direction Drilling Operation Performed - Deviate
2018-09-12 Direction Drilling Operation Performed - Horizontal
2018-09-17 Finished Drilling
2018-09-17 Well Log Performed
2018-09-17 Well Mode changed to Drilled and Cased
2018-09-18 Production Casing Operation Performed
2018-09-19 Rig Released
2018-10-22 Well Log Performed
2018-11-01 Perforation Treatment Performed - Jet Perforation
2018-11-02 Perforation Treatment Performed - Jet Perforation
2018-11-02 Perforation Treatment Performed - Multi-Stage Fracture
2018-11-03 Perforation Treatment Performed - Jet Perforation
2018-11-03 Perforation Treatment Performed - Multi-Stage Fracture
2018-11-04 Perforation Treatment Performed - Jet Perforation
2018-11-04 Perforation Treatment Performed - Multi-Stage Fracture
2018-11-05 Perforation Treatment Performed - Jet Perforation
2018-11-05 Perforation Treatment Performed - Multi-Stage Fracture
2018-11-06 Perforation Treatment Performed - Jet Perforation
2018-11-06 Perforation Treatment Performed - Multi-Stage Fracture
2018-11-07 Perforation Treatment Performed - Jet Perforation
2018-11-07 Perforation Treatment Performed - Multi-Stage Fracture
2018-11-08 Perforation Treatment Performed - Jet Perforation
2018-11-08 Perforation Treatment Performed - Multi-Stage Fracture
2018-11-09 Perforation Treatment Performed - Jet Perforation
2018-11-09 Perforation Treatment Performed - Multi-Stage Fracture
2018-11-10 Perforation Treatment Performed - Multi-Stage Fracture
2018-11-21 Well Began Production
2018-11-21 Well Fluid changed to Crude Oil
2018-11-21 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-09-01 Trinidad Drilling Ltd. 418 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-09-11 2063.40 Deviate (5 - 79 degrees)
2018-09-12 2421.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-11-01 Perforation 4717.60 4718.00 7
2018-11-02 Perforation 4660.00 4660.40 7
2018-11-05 Perforation 3580.00 3580.40 7
2018-11-05 Multi-Stage Fracture 3580.00 3625.40 0
2018-11-06 Perforation 3565.00 3565.40 7
2018-11-06 Perforation 3550.00 3550.40 7
2018-11-06 Perforation 3535.00 3535.40 7
2018-11-06 Perforation 3520.00 3520.40 7
2018-11-06 Multi-Stage Fracture 3520.00 3565.40 0
2018-11-06 Perforation 3505.00 3505.40 7
2018-11-06 Perforation 3490.00 3490.40 7
2018-11-06 Perforation 3475.00 3475.40 7
2018-11-02 Multi-Stage Fracture 4660.00 4707.40 0
2018-11-06 Perforation 3460.00 3460.40 7
2018-11-06 Multi-Stage Fracture 3460.00 3505.40 0
2018-11-06 Perforation 3445.00 3445.40 7
2018-11-06 Perforation 3430.00 3430.40 7
2018-11-06 Perforation 3415.00 3415.40 7
2018-11-06 Perforation 3400.00 3400.40 7
2018-11-06 Multi-Stage Fracture 3400.00 3445.40 0
2018-11-06 Perforation 3385.00 3385.40 7
2018-11-06 Perforation 3370.00 3370.40 7
2018-11-06 Perforation 3355.00 3355.40 7
2018-11-02 Perforation 4645.00 4645.40 7
2018-11-06 Perforation 3340.00 3340.40 7
2018-11-06 Multi-Stage Fracture 3340.00 3385.40 0
2018-11-06 Perforation 3325.00 3325.40 7
2018-11-06 Perforation 3310.00 3310.40 7
2018-11-06 Perforation 3295.00 3295.40 7
2018-11-06 Perforation 3280.00 3280.40 7
2018-11-07 Multi-Stage Fracture 3280.00 3325.40 0
2018-11-07 Perforation 3265.00 3265.40 7
2018-11-07 Perforation 3250.00 3250.40 7
2018-11-07 Perforation 3235.00 3235.40 7
2018-11-02 Perforation 4630.00 4630.40 7
2018-11-07 Perforation 3220.00 3220.40 7
2018-11-07 Multi-Stage Fracture 3220.00 3265.40 0
2018-11-07 Perforation 3205.00 3205.40 7
2018-11-07 Perforation 3190.00 3190.40 7
2018-11-07 Perforation 3175.00 3175.40 7
2018-11-07 Perforation 3160.00 3160.40 7
2018-11-07 Multi-Stage Fracture 3160.00 3205.40 0
2018-11-07 Perforation 3145.00 3145.40 7
2018-11-07 Perforation 3130.00 3130.40 7
2018-11-07 Perforation 3115.00 3115.40 7
2018-11-02 Perforation 4615.00 4615.40 7
2018-11-07 Perforation 3100.00 3100.40 7
2018-11-07 Multi-Stage Fracture 3100.00 3145.40 0
2018-11-08 Perforation 3085.00 3085.40 7
2018-11-08 Perforation 3070.00 3070.40 7
2018-11-08 Perforation 3055.00 3055.40 7
2018-11-08 Perforation 3040.00 3040.40 7
2018-11-08 Multi-Stage Fracture 3040.00 3085.40 0
2018-11-08 Perforation 3025.00 3025.40 7
2018-11-08 Perforation 3010.00 3010.40 7
2018-11-08 Perforation 2995.00 2995.40 7
2018-11-02 Perforation 4600.00 4600.40 7
2018-11-08 Perforation 2980.00 2980.40 7
2018-11-08 Multi-Stage Fracture 2980.00 3025.40 0
2018-11-08 Perforation 2965.00 2965.40 7
2018-11-08 Perforation 2950.00 2950.40 7
2018-11-08 Perforation 2935.00 2935.40 7
2018-11-08 Perforation 2920.00 2920.40 7
2018-11-08 Multi-Stage Fracture 2920.00 2965.40 0
2018-11-08 Perforation 2905.00 2905.40 7
2018-11-08 Perforation 2890.00 2890.40 7
2018-11-08 Perforation 2875.00 2875.40 7
2018-11-02 Multi-Stage Fracture 4600.00 4645.40 0
2018-11-08 Perforation 2860.00 2860.40 7
2018-11-08 Multi-Stage Fracture 2860.00 2905.40 0
2018-11-08 Perforation 2845.00 2845.40 7
2018-11-08 Perforation 2830.00 2830.40 7
2018-11-08 Perforation 2815.00 2815.40 7
2018-11-08 Perforation 2800.00 2800.40 7
2018-11-09 Multi-Stage Fracture 2800.00 2845.40 0
2018-11-09 Perforation 2785.00 2785.40 7
2018-11-09 Perforation 2770.00 2770.40 7
2018-11-09 Perforation 2755.00 2755.40 7
2018-11-02 Perforation 4585.00 4585.40 7
2018-11-09 Perforation 2740.00 2740.40 7
2018-11-09 Multi-Stage Fracture 2740.00 2785.40 0
2018-11-09 Perforation 2725.00 2725.40 7
2018-11-09 Perforation 2710.00 2710.40 7
2018-11-09 Perforation 2695.00 2695.40 7
2018-11-09 Perforation 2680.00 2680.40 7
2018-11-09 Multi-Stage Fracture 2680.00 2725.40 0
2018-11-09 Perforation 2665.00 2665.40 7
2018-11-09 Perforation 2650.00 2650.40 7
2018-11-09 Perforation 2635.00 2635.40 7
2018-11-02 Perforation 4570.00 4570.40 7
2018-11-09 Perforation 2620.00 2620.40 7
2018-11-09 Multi-Stage Fracture 2620.00 2665.40 0
2018-11-09 Perforation 2605.00 2605.40 7
2018-11-09 Perforation 2590.00 2590.40 7
2018-11-09 Perforation 2575.00 2575.40 7
2018-11-09 Perforation 2560.00 2560.40 7
2018-11-09 Multi-Stage Fracture 2560.00 2605.40 0
2018-11-09 Perforation 2540.00 2540.40 7
2018-11-09 Perforation 2520.00 2520.40 7
2018-11-09 Perforation 2500.00 2500.40 7
2018-11-02 Perforation 4555.00 4555.40 7
2018-11-09 Perforation 2480.00 2480.40 7
2018-11-10 Multi-Stage Fracture 2480.00 2540.40 0
2018-11-01 Perforation 4732.50 4732.90 7
2018-11-02 Perforation 4540.00 4540.40 7
2018-11-02 Multi-Stage Fracture 4540.00 4585.40 0
2018-11-03 Perforation 4525.00 4525.40 7
2018-11-03 Perforation 4510.00 4510.40 7
2018-11-03 Perforation 4495.00 4495.40 7
2018-11-03 Perforation 4480.00 4480.40 7
2018-11-03 Multi-Stage Fracture 4480.00 4525.40 0
2018-11-03 Perforation 4465.00 4465.40 7
2018-11-03 Perforation 4450.00 4450.40 7
2018-11-03 Perforation 4435.00 4435.40 7
2018-11-01 Perforation 4747.30 4747.70 7
2018-11-03 Perforation 4420.00 4420.40 7
2018-11-03 Multi-Stage Fracture 4420.00 4465.40 0
2018-11-03 Perforation 4405.00 4405.40 7
2018-11-03 Perforation 4390.00 4390.40 7
2018-11-03 Perforation 4375.00 4375.40 7
2018-11-03 Perforation 4360.00 4360.40 7
2018-11-03 Multi-Stage Fracture 4360.00 4405.40 0
2018-11-03 Perforation 4345.00 4345.40 7
2018-11-03 Perforation 4330.00 4330.40 7
2018-11-03 Perforation 4315.00 4315.40 7
2018-11-02 Perforation 4725.00 4725.50 7
2018-11-03 Perforation 4300.00 4300.40 7
2018-11-04 Multi-Stage Fracture 4300.00 4345.40 0
2018-11-04 Perforation 4285.00 4285.40 7
2018-11-04 Perforation 4270.00 4270.40 7
2018-11-04 Perforation 4255.00 4255.40 7
2018-11-04 Perforation 4240.00 4240.40 7
2018-11-04 Multi-Stage Fracture 4240.00 4285.40 0
2018-11-04 Perforation 4225.00 4225.40 7
2018-11-04 Perforation 4210.00 4210.40 7
2018-11-04 Perforation 4195.00 4195.40 7
2018-11-02 Perforation 4739.00 4739.50 7
2018-11-04 Perforation 4180.00 4180.40 7
2018-11-04 Multi-Stage Fracture 4180.00 4225.40 0
2018-11-04 Perforation 4165.00 4165.40 7
2018-11-04 Perforation 4150.00 4150.40 7
2018-11-04 Perforation 4135.00 4135.40 7
2018-11-04 Perforation 4120.00 4120.40 7
2018-11-04 Multi-Stage Fracture 4120.00 4165.40 0
2018-11-04 Perforation 4105.00 4105.40 7
2018-11-04 Perforation 4090.00 4090.40 7
2018-11-04 Perforation 4075.00 4075.40 7
2018-11-02 Multi-Stage Fracture 4717.60 4747.70 0
2018-11-04 Perforation 4060.00 4060.40 7
2018-11-04 Multi-Stage Fracture 4060.00 4105.40 0
2018-11-04 Perforation 4045.00 4045.40 7
2018-11-04 Perforation 4030.00 4030.40 7
2018-11-04 Perforation 4015.00 4015.40 7
2018-11-04 Perforation 4000.00 4000.40 7
2018-11-04 Multi-Stage Fracture 4000.00 4045.40 0
2018-11-04 Perforation 3985.00 3985.40 7
2018-11-04 Perforation 3970.00 3970.40 7
2018-11-04 Perforation 3955.00 3955.40 7
2018-11-02 Perforation 4707.00 4707.40 7
2018-11-04 Perforation 3940.00 3940.40 7
2018-11-05 Multi-Stage Fracture 3940.00 3985.40 0
2018-11-05 Perforation 3925.00 3925.40 7
2018-11-05 Perforation 3910.00 3910.40 7
2018-11-05 Perforation 3895.00 3895.40 7
2018-11-05 Perforation 3880.00 3880.40 7
2018-11-05 Multi-Stage Fracture 3880.00 3925.40 0
2018-11-05 Perforation 3865.00 3865.40 7
2018-11-05 Perforation 3850.00 3850.40 7
2018-11-05 Perforation 3835.00 3835.40 7
2018-11-02 Perforation 4690.00 4690.40 7
2018-11-05 Perforation 3820.00 3820.40 7
2018-11-05 Multi-Stage Fracture 3820.00 3865.40 0
2018-11-05 Perforation 3805.00 3805.40 7
2018-11-05 Perforation 3790.00 3790.40 7
2018-11-05 Perforation 3775.00 3775.40 7
2018-11-05 Perforation 3760.00 3760.40 7
2018-11-05 Multi-Stage Fracture 3760.00 3805.40 0
2018-11-05 Perforation 3745.00 3745.40 7
2018-11-05 Perforation 3730.00 3730.40 7
2018-11-05 Perforation 3715.00 3715.40 7
2018-11-02 Perforation 4675.00 4675.40 7
2018-11-05 Perforation 3700.00 3700.40 7
2018-11-05 Multi-Stage Fracture 3700.00 3745.40 0
2018-11-05 Perforation 3685.00 3685.40 7
2018-11-05 Perforation 3670.00 3670.40 7
2018-11-05 Perforation 3655.00 3655.40 7
2018-11-05 Perforation 3640.00 3640.40 7
2018-11-05 Multi-Stage Fracture 3640.00 3685.40 0
2018-11-05 Perforation 3625.00 3625.40 7
2018-11-05 Perforation 3610.00 3610.40 7
2018-11-05 Perforation 3595.00 3595.40 7

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-11-02 2018-11-10 2,307 33,553 N/A
2 2018-11-02 2018-11-05 2,307 0 N/A
3 2018-11-02 2018-11-06 2,307 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 88.4389 N/A
30/50 Domestic Sand Step Energy Services Crystalline Silica 14808-60-7 100 6.8847 N/A
40/70 Domestic Sand Step Energy Services Crystalline Silica 14808-60-7 100 3.9321 N/A
50/140 Domestic Sand Step Energy Services Crystalline Silica 14808-60-7 100 0.5003 N/A
15% HCl Acid Step Energy Services Acid Hydrochloric Acid 7647-01-0 100 0.5781 N/A
Water 7732-18-5 100 0.5781 N/A
SAB-1 Acid Blend Additive Package Step Energy Services Acid Acetic Acid 64-19-7 100 0.0063 N/A
Ethylene Glycol 107-21-1 100 0.0063 N/A
Methyl Alcohol 67-56-1 100 0.0063 N/A
Non Hazardous Ingredients Not Available 100 0.0063 N/A
Propan-2-ol 67-63-0 100 0.0063 N/A
Aqucar 742 (Biocide) Step Energy Services Bactericide/Biocide Ethanol 64-17-5 100 0.0178 N/A
Glutaraldehyde 111-30-8 100 0.0178 N/A
Methanol 67-56-1 100 0.0178 N/A
Non-Hazardous Ingredients Not Available 100 0.0178 N/A
Quaternary ammonium compounds.
benzyl-C12-16-alkyldimethyl. chlorides
68424-85-1 100 0.0178 N/A
SCBO-2 (Breaker) Step Energy Services Breaker Ammonium Persulfate 7727-54-0 100 0.0105 N/A
Cured Acrylic Resin Not Available 100 0.0105 N/A
Non-Hazardous Ingredients Not Available 100 0.0105 N/A
SBX-1 (Crosslinker) Step Energy Services Crosslinker Boric Acid 10043-35-3 100 0.0254 N/A
Ethylene Glycol 107-21-1 100 0.0254 N/A
Non-Hazardous Ingredients Not Available 100 0.0254 N/A
Potassium Carbonate 584-08-7 100 0.0254 N/A
Potassium Hydroxide 1310-58-3 100 0.0254 N/A
SFR-106 (Friction Reducer) Step Energy Services Friction Reducer Ethoxylated Alcohol 78330-21-9 100 0.0695 N/A
Non-Hazardous Ingredients Not Available 100 0.0695 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.0695 N/A
SWG-101 (Gellant) Step Energy Services Gelling Agent Guar gum 9000-30-0 100 0.1353 N/A
SSI-1 (Scale Inhibitor) Step Energy Services Scale Inhibitor Methyl Alcohol 67-56-1 100 0.0088 N/A
Non-Hazardous Ingredients Not Available 100 0.0088 N/A
SAS-4 (Anti-Sludge) Step Energy Services Surfactant 1.1' - Oxybisbenzene. tetrapropylene dervis. sulfonated 119345-03-8 100 0.0028 N/A
Alkylbenzene sulfonic acid 27176-87-0 100 0.0028 N/A
Methanol 67-56-1 100 0.0028 N/A
Xylene 1330-20-7 100 0.0028 N/A
SNE-2 (Non-Emulsifier) Step Energy Services Surfactant 2-Ethylhexanol distillation residue 68609-68-7 100 0.0879 N/A
Dodecylbenzene Sulfonic Acid 27176-87-0 100 0.0879 N/A
Methanol 67-56-1 100 0.0879 N/A
Monoethanolamine 141-43-5 100 0.0879 N/A
Oxirane. methyl-. polymer 11/6/9003 100 0.0879 N/A
Poly(oxy-1.2-ethanediyl). alphaisotridecyl-omega-hydroxy- 9043-30-5 100 0.0879 N/A
Water 7732-18-5 100 0.0879 N/A
2 SBH-1 (Buffer) Step Energy Services Buffer Non-Hazardous Ingredients Not Available 100 0.0127 N/A
Potassium Carbonate 584-08-7 100 0.0127 N/A
Potassium Hydroxide 1310-58-3 100 0.0127 N/A
SBX-7 (Crosslinker) Step Energy Services Crosslinker Non-Hazardous Ingredients Not Available 100 0.0834 N/A
Petroleum Distillates. hydrotreated light 64742-47-8 100 0.0834 N/A
3 SAF-3 (Anti Foamer) Step Energy Services Defoamer Alcohols. C9-11-iso-. C10-rich. ethoxylated 78330-20-8 100 0.0012 N/A
Non-Hazardous Ingredients Not Available 100 0.0012 N/A
Polyethylene glycol monotridecyl ether. liquids 24938-91-8 100 0.0012 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-10-27 2018-11-12 Waste Water - Municipal 30498
2018-10-22 2018-11-09 Recycled Fracturing Water (treated at well site) 2038
2018-10-22 2018-11-09 Recycled Fracturing Water (treated at well site) 2039
2018-11-17 2018-11-19 Municipal Water 220
2018-10-21 2018-10-21 Municipal Water 286

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 600 0.0 0.0 0.0
2019 6986 0.0 0.0 0.0
2020 1991 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-09-12 No Incident Encountered 0.00 0.00
2018-10-31 No Incident Encountered 0.00 0.00

For data sources see[10]

References