X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304253404000

Well Details

Well ID: 0304253404000
Loading map...
Location: 00/04-34-030-25W4/0
Location Alias: 00/04-34-30-25 W4M
Location Alias 2: 00/04-34-030-25 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 25
Section: 34
County/Municipality: Kneehill County
Well Name: EMBER TWINING 4-34-30-25
Operator Name: Ember Resources Inc.
License Number: 0302621
License Date: 2004-01-26
License Status: Suspension
Spud Date: 2004-03-17
Final Drill Date: 2004-03-21
Well Total Depth: 1564.00 m
Surface Hole Latitude: 51.608533
Surface Hole Longitude: -113.445789

For data sources see[1][2]

Well History

Date Event
2004-01-26 Obtained License
2004-03-18 Surface Casing Operation Performed
2004-03-20 Production Casing Operation Performed
2004-03-21 Finished Drilling
2004-03-21 Well Log Performed
2004-03-21 Well Mode changed to Drilled and Cased
2004-03-22 Rig Released
2004-04-12 Perforation Treatment Performed - Jet Perforation
2004-04-12 Well Log Performed
2004-05-16 Perforation Treatment Performed - Fractured
2004-08-18 Well Began Production
2004-08-18 Well Fluid changed to Gas
2004-08-18 Well Mode changed to Flowing
2017-01-11 Well Fluid changed to Gas
2017-01-11 Well Mode changed to Suspended
2017-01-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-01-13 Plug Back Performed
2017-01-13 Well Fluid changed to Gas
2017-01-13 Well Mode changed to Abandoned Zone
2017-01-16 Well Log Performed
2017-02-27 Perforation Treatment Performed - Jet Perforation
2017-02-27 Well Log Performed
2017-03-03 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-04-12 Perforation 1501.00 1503.00 17
2017-02-27 Perforation 470.50 472.00 13
2017-02-27 Perforation 474.50 475.50 13
2017-02-27 Perforation 498.40 499.40 13
2017-02-27 Perforation 501.40 502.40 13
2017-02-27 Perforation 517.00 519.50 13
2017-02-27 Perforation 525.00 527.00 13
2017-02-27 Perforation 536.00 537.00 13
2017-02-27 Perforation 549.60 551.60 13
2017-02-27 Perforation 552.40 553.40 13
2017-02-27 Perforation 564.70 565.70 13
2004-05-16 Fracture 1501.00 1503.00 0
2017-02-27 Perforation 578.00 579.00 13
2017-02-27 Perforation 582.00 583.00 13
2017-02-27 Perforation 594.00 595.00 13
2017-02-27 Perforation 598.00 599.00 13
2017-02-27 Perforation 603.00 604.00 13
2017-02-27 Perforation 616.50 617.50 13
2017-03-03 Fracture 330.50 331.50 0
2017-03-03 Fracture 350.50 351.50 0
2017-03-03 Fracture 387.50 389.50 0
2017-03-03 Fracture 441.30 442.30 0
2017-01-13 Packing Device Capped w/Cement 1486.80 1494.80 0
2017-03-03 Fracture 443.60 444.60 0
2017-03-03 Fracture 459.50 464.50 0
2017-03-03 Fracture 470.50 472.00 0
2017-03-03 Fracture 474.50 475.50 0
2017-03-03 Fracture 498.40 499.40 0
2017-03-03 Fracture 501.40 502.40 0
2017-03-03 Fracture 517.00 519.50 0
2017-03-03 Fracture 525.00 527.00 0
2017-03-03 Fracture 536.00 537.00 0
2017-03-03 Fracture 549.60 551.60 0
2017-02-27 Perforation 330.50 331.50 13
2017-03-03 Fracture 552.40 553.40 0
2017-03-03 Fracture 564.70 565.70 0
2017-03-03 Fracture 578.00 579.00 0
2017-03-03 Fracture 582.00 583.00 0
2017-03-03 Fracture 594.00 595.00 0
2017-03-03 Fracture 598.00 599.00 0
2017-03-03 Fracture 603.00 604.00 0
2017-03-03 Fracture 616.50 617.50 0
2017-02-27 Perforation 350.50 351.50 13
2017-02-27 Perforation 387.50 389.50 13
2017-02-27 Perforation 441.30 442.30 13
2017-02-27 Perforation 443.60 444.60 13
2017-02-27 Perforation 459.50 464.50 13

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-03-03 2017-03-03 0 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 100 N/A

For data sources see[5]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 1794 0.0 0.0 0.0
2005 8713 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 6263 0.0 0.0 0.0
2010 6804 0.0 0.0 0.0
2011 6985 0.0 0.0 0.0
2012 2131 0.0 0.0 0.0
2013 1893 0.0 0.0 0.0
2014 995 0.0 0.0 0.0
2015 756 0.0 0.0 0.0
2016 1 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-03-03 No Incident Encountered 0.00 0.00

For data sources see[7]

References