X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304253209000

Well Details

Well ID: 0304253209000
Loading map...
Location: 00/09-32-030-25W4/0
Location Alias: 00/09-32-30-25 W4M
Location Alias 2: 00/09-32-030-25 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 25
Section: 32
County/Municipality: Kneehill County
Well Name: EMBER TWINING 9-32-30-25
Operator Name: Ember Resources Inc.
License Number: 0422222
License Date: 2010-07-28
License Status: Issued
Spud Date: 2010-10-14
Final Drill Date: 2010-10-25
Well Total Depth: 969.00 m
Surface Hole Latitude: 51.614939
Surface Hole Longitude: -113.479624

For data sources see[1][2]

Well History

Date Event
2010-07-28 Obtained License
2010-10-15 Surface Casing Operation Performed
2010-10-25 Finished Drilling
2010-10-25 Well Mode changed to Drilled and Cased
2010-10-27 Production Casing Operation Performed
2010-10-27 Rig Released
2010-11-02 Well Log Performed
2010-11-11 Perforation Treatment Performed - Jet Perforation
2010-11-12 Perforation Treatment Performed - Fractured
2010-11-15 Well Fluid changed to Coalbed Methane-Coals and Other
2010-11-15 Well Mode changed to Testing
2011-01-24 Well Began Production
2011-01-24 Well Fluid changed to Coalbed Methane-Coals and Other
2011-01-24 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-11-11 Perforation 473.80 474.30 13
2010-11-11 Perforation 336.20 336.70 13
2010-11-11 Perforation 577.20 578.20 13
2010-11-11 Perforation 227.10 228.10 13
2010-11-11 Perforation 397.70 398.20 13
2010-11-11 Perforation 421.40 421.90 13
2010-11-11 Perforation 341.90 342.40 13
2010-11-11 Perforation 355.50 356.00 13
2010-11-11 Perforation 614.60 615.60 13
2010-11-11 Perforation 611.60 612.60 13
2010-11-11 Perforation 608.50 609.00 13
2010-11-11 Perforation 475.00 475.50 13
2010-11-11 Perforation 615.80 616.30 13
2010-11-11 Perforation 638.60 639.10 13
2010-11-11 Perforation 627.90 628.40 13
2010-11-11 Perforation 623.90 624.40 13
2010-11-11 Perforation 603.80 604.30 13
2010-11-11 Perforation 565.30 566.30 13
2010-11-11 Perforation 539.00 541.50 13
2010-11-11 Perforation 522.00 522.50 13
2010-11-11 Perforation 567.90 568.40 13
2010-11-11 Perforation 596.00 597.00 13
2010-11-11 Perforation 468.50 469.00 13
2010-11-11 Perforation 581.40 582.40 13
2010-11-11 Perforation 593.50 595.00 13
2010-11-12 Fracture 227.10 470.80 0
2010-11-12 Fracture 577.20 578.20 0
2010-11-12 Fracture 623.90 639.10 0
2010-11-12 Fracture 581.40 609.00 0
2010-11-12 Fracture 479.20 568.40 0
2010-11-11 Perforation 469.80 470.80 13
2010-11-11 Perforation 515.50 516.00 13
2010-11-11 Perforation 519.10 519.60 13
2010-11-11 Perforation 479.20 479.70 13
2010-11-11 Perforation 486.50 487.00 13
2010-11-11 Perforation 247.50 248.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 24 0.0 0.0 0.0
2011 8194 0.0 0.0 0.0
2012 8668 0.0 0.0 0.0
2013 8751 0.0 0.0 0.0
2014 8734 0.0 0.0 0.0
2015 8749 0.0 0.0 0.0
2016 8782 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References