X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304253206000

Well Details

Well ID: 0304253206000
Loading map...
Location: 00/06-32-030-25W4/0
Location Alias: 00/06-32-30-25 W4M
Location Alias 2: 00/06-32-030-25 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 25
Section: 32
County/Municipality: Kneehill County
Well Name: EMBER TWINING 6-32-30-25
Operator Name: Ember Resources Inc.
License Number: 0132610
License Date: 1988-02-25
License Status: Amended
Spud Date: 1988-05-19
Final Drill Date: 1988-05-30
Well Total Depth: 1831.00 m
Surface Hole Latitude: 51.611977
Surface Hole Longitude: -113.491062

For data sources see[1][2]

Well History

Date Event
1988-02-25 Obtained License
1988-05-21 Surface Casing Operation Performed
1988-05-26 Drill Stem Test Performed
1988-05-30 Finished Drilling
1988-05-30 Well Log Performed
1988-05-30 Well Mode changed to Drilled and Cased
1988-06-01 Drill Stem Test Performed
1988-06-02 Drill Stem Test Performed
1988-06-03 Production Casing Operation Performed
1988-06-03 Rig Released
1988-06-08 Perforation Treatment Performed - Jet Perforation
1988-06-09 Well Log Performed
1988-06-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-06-12 Perforation Treatment Performed - Jet Perforation
1988-06-12 Well Log Performed
1988-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-06-15 Well Began Production
1988-06-15 Well Fluid changed to Crude Oil
1988-06-15 Well Mode changed to Flowing
1988-10-20 Well Log Performed
1988-10-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-10-25 Plug Back Performed
1988-10-25 Well Fluid changed to Crude Oil
1988-10-25 Well Mode changed to Abandoned Zone
1988-10-27 Perforation Treatment Performed - Jet Perforation
1988-10-27 Well Log Performed
1988-10-29 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-06-08 Perforation 1765.50 1767.30 13
1988-06-08 Perforation 1768.00 1772.00 13
1988-06-10 Acid Treatment 1765.50 1772.00 0
1988-06-12 Perforation 1760.50 1764.00 13
1988-06-13 Acid Treatment 1760.50 1764.00 0
1988-10-25 Packing Device Capped w/Cement 1745.00 1758.00 0
1988-10-27 Perforation 1532.50 1534.50 13
1988-10-29 Fracture 1532.50 1534.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 2376 0.0 0.0 0.0

For data sources see[5]

References