X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304252916000

Well Details

Well ID: 0304252916000
Loading map...
Location: 00/16-29-030-25W4/0
Location Alias: 00/16-29-30-25 W4M
Location Alias 2: 00/16-29-030-25 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 25
Section: 29
County/Municipality: Kneehill County
Well Name: EMBER SD TWINING 16-29-30-25
Operator Name: Ember Resources Inc.
License Number: 0423228
License Date: 2010-09-03
License Status: Issued
Spud Date: 2010-12-13
Final Drill Date: 2010-12-15
Well Total Depth: 1165.00 m
Surface Hole Latitude: 51.599900
Surface Hole Longitude: -113.482160

For data sources see[1][2]

Well History

Date Event
2010-09-03 Obtained License
2010-12-13 Direction Drilling Operation Performed - Deviate
2010-12-14 Surface Casing Operation Performed
2010-12-15 Finished Drilling
2010-12-15 Production Casing Operation Performed
2010-12-15 Rig Released
2010-12-15 Well Mode changed to Drilled and Cased
2011-01-08 Well Log Performed
2011-01-24 Perforation Treatment Performed - Jet Perforation
2011-02-04 Perforation Treatment Performed - Fractured
2011-02-16 Well Began Production
2011-02-16 Well Fluid changed to Coalbed Methane-Coals and Other
2011-02-16 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-12-13 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-01-24 Perforation 540.80 542.30 13
2011-01-24 Perforation 674.00 676.00 13
2011-01-24 Perforation 384.90 385.40 13
2011-01-24 Perforation 453.80 454.80 13
2011-01-24 Perforation 658.50 659.00 13
2011-01-24 Perforation 458.40 458.90 13
2011-01-24 Perforation 525.40 525.90 13
2011-01-24 Perforation 399.80 400.30 13
2011-01-24 Perforation 410.50 411.00 13
2011-01-24 Perforation 724.80 725.80 13
2011-01-24 Perforation 726.60 727.10 13
2011-01-24 Perforation 545.60 546.10 13
2011-01-24 Perforation 707.50 708.00 13
2011-01-24 Perforation 712.40 713.90 13
2011-01-24 Perforation 738.80 739.30 13
2011-01-24 Perforation 1068.50 1069.50 13
2011-01-24 Perforation 730.60 731.10 13
2011-01-24 Perforation 732.50 733.00 13
2011-01-24 Perforation 644.40 645.40 13
2011-01-24 Perforation 652.00 652.50 13
2011-01-24 Perforation 610.00 613.00 13
2011-01-24 Perforation 639.80 640.30 13
2011-01-24 Perforation 533.10 533.60 13
2011-01-24 Perforation 661.70 662.20 13
2011-01-24 Perforation 702.20 703.20 13
2011-01-24 Perforation 686.20 687.20 13
2011-01-24 Perforation 681.00 683.00 13
2011-02-04 Fracture 453.80 676.00 0
2011-02-04 Fracture 384.90 713.90 0
2011-02-04 Fracture 726.60 739.30 0
2011-01-24 Perforation 534.00 534.50 13
2011-01-24 Perforation 555.70 556.20 13
2011-01-24 Perforation 591.60 592.10 13
2011-01-24 Perforation 549.60 550.10 13
2011-01-24 Perforation 552.00 552.50 13
2011-01-24 Perforation 528.40 528.90 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 7642 0.0 0.0 0.0
2012 8668 0.0 0.0 0.0
2013 8751 0.0 0.0 0.0
2014 8734 0.0 0.0 0.0
2015 8749 0.0 0.0 0.0
2016 8782 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References