If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0304252916000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.5999,"lon":-113.48216,"icon":""}]} |
Location: 00/16-29-030-25W4/0 | |
Location Alias: 00/16-29-30-25 W4M | |
Location Alias 2: 00/16-29-030-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 030 | |
Meridian: 4 | |
Range: 25 | |
Section: 29 | |
County/Municipality: Kneehill County | |
Well Name: EMBER SD TWINING 16-29-30-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0423228 | |
License Date: 2010-09-03 | |
License Status: Issued | |
Spud Date: 2010-12-13 | |
Final Drill Date: 2010-12-15 | |
Well Total Depth: 1165.00 m | |
Surface Hole Latitude: 51.599900 | |
Surface Hole Longitude: -113.482160 |
Date | Event |
---|---|
2010-09-03 | Obtained License |
2010-12-13 | Direction Drilling Operation Performed - Deviate |
2010-12-14 | Surface Casing Operation Performed |
2010-12-15 | Finished Drilling |
2010-12-15 | Production Casing Operation Performed |
2010-12-15 | Rig Released |
2010-12-15 | Well Mode changed to Drilled and Cased |
2011-01-08 | Well Log Performed |
2011-01-24 | Perforation Treatment Performed - Jet Perforation |
2011-02-04 | Perforation Treatment Performed - Fractured |
2011-02-16 | Well Began Production |
2011-02-16 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-02-16 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-12-13 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-01-24 | Perforation | 540.80 | 542.30 | 13 |
2011-01-24 | Perforation | 674.00 | 676.00 | 13 |
2011-01-24 | Perforation | 384.90 | 385.40 | 13 |
2011-01-24 | Perforation | 453.80 | 454.80 | 13 |
2011-01-24 | Perforation | 658.50 | 659.00 | 13 |
2011-01-24 | Perforation | 458.40 | 458.90 | 13 |
2011-01-24 | Perforation | 525.40 | 525.90 | 13 |
2011-01-24 | Perforation | 399.80 | 400.30 | 13 |
2011-01-24 | Perforation | 410.50 | 411.00 | 13 |
2011-01-24 | Perforation | 724.80 | 725.80 | 13 |
2011-01-24 | Perforation | 726.60 | 727.10 | 13 |
2011-01-24 | Perforation | 545.60 | 546.10 | 13 |
2011-01-24 | Perforation | 707.50 | 708.00 | 13 |
2011-01-24 | Perforation | 712.40 | 713.90 | 13 |
2011-01-24 | Perforation | 738.80 | 739.30 | 13 |
2011-01-24 | Perforation | 1068.50 | 1069.50 | 13 |
2011-01-24 | Perforation | 730.60 | 731.10 | 13 |
2011-01-24 | Perforation | 732.50 | 733.00 | 13 |
2011-01-24 | Perforation | 644.40 | 645.40 | 13 |
2011-01-24 | Perforation | 652.00 | 652.50 | 13 |
2011-01-24 | Perforation | 610.00 | 613.00 | 13 |
2011-01-24 | Perforation | 639.80 | 640.30 | 13 |
2011-01-24 | Perforation | 533.10 | 533.60 | 13 |
2011-01-24 | Perforation | 661.70 | 662.20 | 13 |
2011-01-24 | Perforation | 702.20 | 703.20 | 13 |
2011-01-24 | Perforation | 686.20 | 687.20 | 13 |
2011-01-24 | Perforation | 681.00 | 683.00 | 13 |
2011-02-04 | Fracture | 453.80 | 676.00 | 0 |
2011-02-04 | Fracture | 384.90 | 713.90 | 0 |
2011-02-04 | Fracture | 726.60 | 739.30 | 0 |
2011-01-24 | Perforation | 534.00 | 534.50 | 13 |
2011-01-24 | Perforation | 555.70 | 556.20 | 13 |
2011-01-24 | Perforation | 591.60 | 592.10 | 13 |
2011-01-24 | Perforation | 549.60 | 550.10 | 13 |
2011-01-24 | Perforation | 552.00 | 552.50 | 13 |
2011-01-24 | Perforation | 528.40 | 528.90 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 7642 | 0.0 | 0.0 | 0.0 |
2012 | 8668 | 0.0 | 0.0 | 0.0 |
2013 | 8751 | 0.0 | 0.0 | 0.0 |
2014 | 8734 | 0.0 | 0.0 | 0.0 |
2015 | 8749 | 0.0 | 0.0 | 0.0 |
2016 | 8782 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]