If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0304252903000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.593864,"lon":-113.499817,"icon":""}]} |
Location: 00/03-29-030-25W4/0 | |
Location Alias: 00/03-29-30-25 W4M | |
Location Alias 2: 00/03-29-030-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 030 | |
Meridian: 4 | |
Range: 25 | |
Section: 29 | |
County/Municipality: Kneehill County | |
Well Name: EMBER SD TWINING 3-29-30-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0423421 | |
License Date: 2010-09-10 | |
License Status: Issued | |
Spud Date: 2010-11-03 | |
Final Drill Date: 2010-11-04 | |
Well Total Depth: 1179.50 m | |
Surface Hole Latitude: 51.593864 | |
Surface Hole Longitude: -113.499817 |
Date | Event |
---|---|
2010-09-10 | Obtained License |
2010-11-03 | Direction Drilling Operation Performed - Deviate |
2010-11-03 | Surface Casing Operation Performed |
2010-11-04 | Finished Drilling |
2010-11-04 | Production Casing Operation Performed |
2010-11-04 | Rig Released |
2010-11-04 | Well Mode changed to Drilled and Cased |
2010-11-08 | Well Log Performed |
2010-12-28 | Perforation Treatment Performed - Jet Perforation |
2010-12-29 | Perforation Treatment Performed - Jet Perforation |
2011-01-03 | Perforation Treatment Performed - Fractured |
2011-01-25 | Well Began Production |
2011-01-25 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-01-25 | Well Mode changed to Flowing |
2016-11-16 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-11-03 | 5.40 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-12-28 | Perforation | 733.80 | 734.30 | 13 |
2010-12-29 | Perforation | 420.80 | 421.80 | 13 |
2010-12-29 | Perforation | 411.80 | 412.30 | 13 |
2010-12-29 | Perforation | 561.10 | 561.60 | 13 |
2010-12-29 | Perforation | 554.30 | 557.30 | 13 |
2010-12-29 | Perforation | 541.50 | 542.00 | 13 |
2010-12-29 | Perforation | 686.00 | 687.50 | 13 |
2010-12-29 | Perforation | 682.00 | 683.50 | 13 |
2010-12-29 | Perforation | 492.00 | 494.50 | 13 |
2010-12-29 | Perforation | 402.80 | 403.30 | 13 |
2010-12-29 | Perforation | 396.30 | 396.80 | 13 |
2010-12-28 | Perforation | 744.30 | 744.80 | 13 |
2010-12-29 | Perforation | 390.10 | 390.60 | 13 |
2010-12-29 | Perforation | 564.50 | 565.00 | 13 |
2010-12-29 | Perforation | 703.60 | 705.10 | 13 |
2010-12-29 | Perforation | 688.70 | 689.70 | 13 |
2010-12-29 | Perforation | 705.60 | 706.10 | 13 |
2010-12-29 | Perforation | 722.00 | 723.00 | 13 |
2010-12-29 | Perforation | 708.30 | 709.30 | 13 |
2010-12-29 | Perforation | 668.00 | 669.00 | 13 |
2010-12-29 | Perforation | 572.40 | 572.90 | 13 |
2010-12-29 | Perforation | 567.00 | 567.50 | 13 |
2010-12-28 | Perforation | 727.10 | 727.60 | 13 |
2010-12-29 | Perforation | 609.40 | 610.40 | 13 |
2010-12-29 | Perforation | 665.40 | 666.40 | 13 |
2010-12-29 | Perforation | 633.20 | 635.70 | 13 |
2011-01-03 | Fracture | 492.00 | 494.50 | 0 |
2011-01-03 | Fracture | 682.00 | 687.50 | 0 |
2011-01-03 | Fracture | 744.30 | 749.30 | 0 |
2011-01-03 | Fracture | 564.50 | 669.00 | 0 |
2011-01-03 | Fracture | 688.70 | 734.30 | 0 |
2011-01-03 | Fracture | 390.10 | 421.80 | 0 |
2011-01-03 | Fracture | 537.60 | 557.30 | 0 |
2010-12-28 | Perforation | 730.10 | 730.60 | 13 |
2010-12-28 | Perforation | 1066.00 | 1067.00 | 13 |
2010-12-28 | Perforation | 1102.50 | 1105.00 | 13 |
2010-12-28 | Perforation | 748.80 | 749.30 | 13 |
2010-12-28 | Perforation | 745.80 | 746.30 | 13 |
2010-12-29 | Perforation | 537.60 | 538.10 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 8170 | 0.0 | 0.0 | 0.0 |
2012 | 8668 | 0.0 | 0.0 | 0.0 |
2013 | 8751 | 0.0 | 0.0 | 0.0 |
2014 | 8734 | 0.0 | 0.0 | 0.0 |
2015 | 8749 | 0.0 | 0.0 | 0.0 |
2016 | 8782 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-11-16 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]