X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304252902000

Well Details

Well ID: 0304252902000
Loading map...
Location: 00/02-29-030-25W4/0
Location Alias: 00/02-29-30-25 W4M
Location Alias 2: 00/02-29-030-25 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 25
Section: 29
County/Municipality: Kneehill County
Well Name: EMBER SD TWINING 2-29-30-25
Operator Name: Ember Resources Inc.
License Number: 0423138
License Date: 2010-09-01
License Status: Issued
Spud Date: 2010-12-09
Final Drill Date: 2010-12-10
Well Total Depth: 1203.00 m
Surface Hole Latitude: 51.593871
Surface Hole Longitude: -113.472501

For data sources see[1][2]

Well History

Date Event
2010-09-01 Obtained License
2010-12-09 Surface Casing Operation Performed
2010-12-10 Direction Drilling Operation Performed - Deviate
2010-12-10 Finished Drilling
2010-12-10 Well Mode changed to Drilled and Cased
2010-12-11 Production Casing Operation Performed
2010-12-11 Rig Released
2010-12-17 Well Log Performed
2011-01-17 Perforation Treatment Performed - Jet Perforation
2011-01-21 Perforation Treatment Performed - Fractured
2011-01-24 Well Fluid changed to Coalbed Methane-Coals and Other
2011-01-24 Well Mode changed to Testing
2011-02-10 Well Began Production
2011-02-10 Well Fluid changed to Coalbed Methane-Coals and Other
2011-02-10 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-12-10 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-01-17 Perforation 652.20 653.70 13
2011-01-17 Perforation 466.50 468.00 13
2011-01-17 Perforation 471.20 471.70 13
2011-01-17 Perforation 457.70 458.20 13
2011-01-17 Perforation 458.60 459.10 13
2011-01-17 Perforation 553.30 553.80 13
2011-01-17 Perforation 633.00 633.50 13
2011-01-17 Perforation 483.90 484.40 13
2011-01-17 Perforation 496.50 498.00 13
2011-01-17 Perforation 822.40 822.90 13
2011-01-17 Perforation 821.40 821.90 13
2011-01-17 Perforation 657.70 658.20 13
2011-01-17 Perforation 804.10 805.10 13
2011-01-17 Perforation 824.80 825.30 13
2011-01-17 Perforation 835.60 836.60 13
2011-01-17 Perforation 832.00 833.50 13
2011-01-17 Perforation 826.40 826.90 13
2011-01-17 Perforation 800.10 801.10 13
2011-01-17 Perforation 754.60 756.10 13
2011-01-17 Perforation 757.60 758.60 13
2011-01-17 Perforation 705.30 706.30 13
2011-01-17 Perforation 725.70 728.20 13
2011-01-17 Perforation 639.80 640.30 13
2011-01-17 Perforation 790.00 791.00 13
2011-01-17 Perforation 785.00 786.50 13
2011-01-17 Perforation 772.20 772.70 13
2011-01-21 Fracture 457.70 805.10 0
2011-01-21 Fracture 821.40 833.50 0
2011-01-21 Fracture 835.60 836.60 0
2011-01-17 Perforation 641.80 642.80 13
2011-01-17 Perforation 697.60 698.10 13
2011-01-17 Perforation 701.70 702.20 13
2011-01-17 Perforation 664.20 665.20 13
2011-01-17 Perforation 669.90 670.40 13
2011-01-17 Perforation 634.40 634.90 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 7810 0.0 0.0 0.0
2012 8668 0.0 0.0 0.0
2013 8751 0.0 0.0 0.0
2014 8734 0.0 0.0 0.0
2015 8749 0.0 0.0 0.0
2016 8782 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References