X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304252603000

Well Details

Well ID: 0304252603000
Loading map...
Location: 00/03-26-030-25W4/0
Location Alias: 00/03-26-30-25 W4M
Location Alias 2: 00/03-26-030-25 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 25
Section: 26
County/Municipality: Kneehill County
Well Name: EMBER TWINING 3-26-30-25
Operator Name: Ember Resources Inc.
License Number: 0422015
License Date: 2010-07-21
License Status: Issued
Spud Date: 2010-10-12
Final Drill Date: 2010-10-17
Well Total Depth: 990.00 m
Surface Hole Latitude: 51.594074
Surface Hole Longitude: -113.419703

For data sources see[1][2]

Well History

Date Event
2010-07-21 Obtained License
2010-10-12 Surface Casing Operation Performed
2010-10-17 Finished Drilling
2010-10-17 Production Casing Operation Performed
2010-10-17 Rig Released
2010-10-17 Well Mode changed to Drilled and Cased
2010-10-19 Well Log Performed
2010-11-04 Perforation Treatment Performed - Jet Perforation
2010-11-11 Perforation Treatment Performed - Fractured
2010-11-14 Well Fluid changed to Coalbed Methane-Coals and Other
2010-11-14 Well Mode changed to Testing
2010-12-19 Well Began Production
2010-12-19 Well Fluid changed to Coalbed Methane-Coals and Other
2010-12-19 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-11-04 Perforation 483.20 483.70 13
2010-11-04 Perforation 223.30 223.80 13
2010-11-04 Perforation 510.00 513.00 13
2010-11-04 Perforation 325.30 325.80 13
2010-11-04 Perforation 443.50 444.00 13
2010-11-04 Perforation 442.10 442.60 13
2010-11-04 Perforation 437.00 438.00 13
2010-11-04 Perforation 503.40 503.90 13
2010-11-04 Perforation 591.40 592.40 13
2010-11-04 Perforation 588.90 589.90 13
2010-11-04 Perforation 584.40 584.90 13
2010-11-04 Perforation 459.20 459.70 13
2010-11-04 Perforation 599.90 600.90 13
2010-11-04 Perforation 611.80 612.30 13
2010-11-04 Perforation 604.90 605.90 13
2010-11-04 Perforation 603.90 604.40 13
2010-11-04 Perforation 549.30 549.80 13
2010-11-04 Perforation 554.20 555.20 13
2010-11-04 Perforation 538.80 539.80 13
2010-11-04 Perforation 541.50 542.50 13
2010-11-04 Perforation 582.40 582.90 13
2010-11-04 Perforation 566.80 568.30 13
2010-11-04 Perforation 453.20 453.70 13
2010-11-04 Perforation 572.10 573.10 13
2010-11-11 Fracture 223.30 483.70 0
2010-11-11 Fracture 510.00 513.00 0
2010-11-11 Fracture 599.90 605.90 0
2010-11-11 Fracture 538.80 582.90 0
2010-11-11 Fracture 495.50 503.90 0
2010-11-04 Perforation 485.00 486.00 13
2010-11-04 Perforation 498.40 498.90 13
2010-11-04 Perforation 495.50 496.00 13
2010-11-04 Perforation 490.70 491.20 13
2010-11-04 Perforation 445.40 446.90 13
2010-11-04 Perforation 317.20 317.70 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 331 0.0 0.0 0.0
2011 8726 0.0 0.0 0.0
2012 8668 0.0 0.0 0.0
2013 8751 0.0 0.0 0.0
2014 8734 0.0 0.0 0.0
2015 8744 0.0 0.0 0.0
2016 8757 0.0 0.0 0.0
2017 8721 0.0 0.0 0.0
2018 8710 0.0 0.0 0.0
2019 8704 0.0 0.0 0.0
2020 2180 0.0 0.0 0.0

For data sources see[5]

References