If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0304252116000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.589492,"lon":-113.456025,"icon":""}]} |
Location: 00/16-21-030-25W4/0 | |
Location Alias: 00/16-21-30-25 W4M | |
Location Alias 2: 00/16-21-030-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 030 | |
Meridian: 4 | |
Range: 25 | |
Section: 21 | |
County/Municipality: Kneehill County | |
Well Name: EMBER TWINING 16-21-30-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0422689 | |
License Date: 2010-08-16 | |
License Status: Issued | |
Spud Date: 2010-10-20 | |
Final Drill Date: 2010-10-31 | |
Well Total Depth: 946.00 m | |
Surface Hole Latitude: 51.589492 | |
Surface Hole Longitude: -113.456025 |
Date | Event |
---|---|
2010-08-16 | Obtained License |
2010-10-23 | Surface Casing Operation Performed |
2010-10-31 | Finished Drilling |
2010-10-31 | Production Casing Operation Performed |
2010-10-31 | Rig Released |
2010-10-31 | Well Mode changed to Drilled and Cased |
2010-11-05 | Well Log Performed |
2010-11-14 | Perforation Treatment Performed - Jet Perforation |
2010-11-17 | Perforation Treatment Performed - Fractured |
2010-11-20 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-11-20 | Well Mode changed to Testing |
2011-01-24 | Well Began Production |
2011-01-24 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-01-24 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-11-14 | Perforation | 486.20 | 487.20 | 13 |
2010-11-14 | Perforation | 473.00 | 477.00 | 13 |
2010-11-14 | Perforation | 435.80 | 436.30 | 13 |
2010-11-14 | Perforation | 448.50 | 449.00 | 13 |
2010-11-14 | Perforation | 444.20 | 445.70 | 13 |
2010-11-14 | Perforation | 437.40 | 438.40 | 13 |
2010-11-14 | Perforation | 586.60 | 587.10 | 13 |
2010-11-14 | Perforation | 582.70 | 583.20 | 13 |
2010-11-14 | Perforation | 580.90 | 581.90 | 13 |
2010-11-14 | Perforation | 607.60 | 608.10 | 13 |
2010-11-14 | Perforation | 599.70 | 600.20 | 13 |
2010-11-14 | Perforation | 458.00 | 459.00 | 13 |
2010-11-14 | Perforation | 594.80 | 596.80 | 13 |
2010-11-14 | Perforation | 577.20 | 578.20 | 13 |
2010-11-14 | Perforation | 535.00 | 535.50 | 13 |
2010-11-14 | Perforation | 511.80 | 512.80 | 13 |
2010-11-14 | Perforation | 531.30 | 533.30 | 13 |
2010-11-14 | Perforation | 566.00 | 567.00 | 13 |
2010-11-14 | Perforation | 561.10 | 562.60 | 13 |
2010-11-14 | Perforation | 548.30 | 549.30 | 13 |
2010-11-17 | Fracture | 507.50 | 509.50 | 0 |
2010-11-17 | Fracture | 473.00 | 477.00 | 0 |
2010-11-14 | Perforation | 454.50 | 455.50 | 13 |
2010-11-17 | Fracture | 432.70 | 433.70 | 0 |
2010-11-17 | Fracture | 510.70 | 578.10 | 0 |
2010-11-17 | Fracture | 599.70 | 608.10 | 0 |
2010-11-17 | Fracture | 454.50 | 459.00 | 0 |
2010-11-17 | Fracture | 486.20 | 495.60 | 0 |
2010-11-14 | Perforation | 492.10 | 493.10 | 13 |
2010-11-14 | Perforation | 510.70 | 511.20 | 13 |
2010-11-14 | Perforation | 500.10 | 500.60 | 13 |
2010-11-14 | Perforation | 495.10 | 495.60 | 13 |
2010-11-14 | Perforation | 432.70 | 433.70 | 13 |
2010-11-14 | Perforation | 507.50 | 509.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 24 | 0.0 | 0.0 | 0.0 |
2011 | 8194 | 0.0 | 0.0 | 0.0 |
2012 | 8668 | 0.0 | 0.0 | 0.0 |
2013 | 8751 | 0.0 | 0.0 | 0.0 |
2014 | 8734 | 0.0 | 0.0 | 0.0 |
2015 | 8749 | 0.0 | 0.0 | 0.0 |
2016 | 8782 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]