If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0304252111020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.585897,"lon":-113.464559,"icon":""}]} |
Location: 02/11-21-030-25W4/0 | |
Location Alias: 02/11-21-30-25 W4M | |
Location Alias 2: 02/11-21-030-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 030 | |
Meridian: 4 | |
Range: 25 | |
Section: 21 | |
County/Municipality: Kneehill County | |
Well Name: EMBER 102 TWINING 11-21-30-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0422669 | |
License Date: 2010-08-16 | |
License Status: Issued | |
Spud Date: 2010-10-16 | |
Final Drill Date: 2010-10-23 | |
Well Total Depth: 950.00 m | |
Surface Hole Latitude: 51.585897 | |
Surface Hole Longitude: -113.464559 |
Date | Event |
---|---|
2010-08-16 | Obtained License |
2010-10-16 | Surface Casing Operation Performed |
2010-10-23 | Finished Drilling |
2010-10-23 | Production Casing Operation Performed |
2010-10-23 | Rig Released |
2010-10-23 | Well Mode changed to Drilled and Cased |
2010-10-27 | Well Log Performed |
2010-11-15 | Perforation Treatment Performed - Jet Perforation |
2010-11-19 | Perforation Treatment Performed - Fractured |
2010-11-22 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-11-22 | Well Mode changed to Testing |
2011-01-24 | Well Began Production |
2011-01-24 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-01-24 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-11-15 | Perforation | 462.70 | 463.20 | 13 |
2010-11-15 | Perforation | 318.40 | 318.90 | 13 |
2010-11-15 | Perforation | 330.10 | 330.60 | 13 |
2010-11-15 | Perforation | 208.50 | 212.00 | 13 |
2010-11-15 | Perforation | 315.20 | 316.20 | 13 |
2010-11-15 | Perforation | 441.50 | 442.00 | 13 |
2010-11-15 | Perforation | 442.40 | 442.90 | 13 |
2010-11-15 | Perforation | 386.50 | 387.00 | 13 |
2010-11-15 | Perforation | 426.90 | 427.40 | 13 |
2010-11-15 | Perforation | 589.40 | 589.90 | 13 |
2010-11-15 | Perforation | 604.80 | 606.30 | 13 |
2010-11-15 | Perforation | 464.20 | 464.70 | 13 |
2010-11-15 | Perforation | 584.00 | 584.50 | 13 |
2010-11-15 | Perforation | 587.80 | 588.30 | 13 |
2010-11-15 | Perforation | 615.90 | 616.40 | 13 |
2010-11-15 | Perforation | 708.80 | 709.80 | 13 |
2010-11-15 | Perforation | 608.40 | 608.90 | 13 |
2010-11-15 | Perforation | 609.70 | 610.20 | 13 |
2010-11-15 | Perforation | 519.10 | 519.60 | 13 |
2010-11-15 | Perforation | 542.70 | 543.20 | 13 |
2010-11-15 | Perforation | 500.10 | 500.60 | 13 |
2010-11-15 | Perforation | 515.30 | 518.30 | 13 |
2010-11-15 | Perforation | 454.20 | 455.70 | 13 |
2010-11-15 | Perforation | 545.00 | 545.50 | 13 |
2010-11-15 | Perforation | 573.00 | 574.00 | 13 |
2010-11-15 | Perforation | 557.20 | 558.70 | 13 |
2010-11-15 | Perforation | 568.00 | 569.50 | 13 |
2010-11-19 | Fracture | 208.50 | 212.00 | 0 |
2010-11-19 | Fracture | 604.80 | 616.40 | 0 |
2010-11-19 | Fracture | 315.20 | 589.90 | 0 |
2010-11-15 | Perforation | 457.90 | 458.40 | 13 |
2010-11-15 | Perforation | 495.50 | 496.00 | 13 |
2010-11-15 | Perforation | 497.50 | 498.50 | 13 |
2010-11-15 | Perforation | 468.50 | 469.00 | 13 |
2010-11-15 | Perforation | 491.20 | 491.70 | 13 |
2010-11-15 | Perforation | 449.00 | 449.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 24 | 0.0 | 0.0 | 0.0 |
2011 | 8194 | 0.0 | 0.0 | 0.0 |
2012 | 8668 | 0.0 | 0.0 | 0.0 |
2013 | 8751 | 0.0 | 0.0 | 0.0 |
2014 | 8734 | 0.0 | 0.0 | 0.0 |
2015 | 8749 | 0.0 | 0.0 | 0.0 |
2016 | 8782 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]