If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0304251915000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.58973,"lon":-113.504607,"icon":""}]} |
Location: 00/15-19-030-25W4/0 | |
Location Alias: 00/15-19-30-25 W4M | |
Location Alias 2: 00/15-19-030-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 030 | |
Meridian: 4 | |
Range: 25 | |
Section: 19 | |
County/Municipality: Kneehill County | |
Well Name: EMBER TWINING 15-19-30-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0423212 | |
License Date: 2010-09-03 | |
License Status: Issued | |
Spud Date: 2010-10-24 | |
Final Drill Date: 2010-11-09 | |
Well Total Depth: 941.00 m | |
Surface Hole Latitude: 51.589730 | |
Surface Hole Longitude: -113.504607 |
Date | Event |
---|---|
2010-09-03 | Obtained License |
2010-10-24 | Surface Casing Operation Performed |
2010-11-09 | Finished Drilling |
2010-11-09 | Production Casing Operation Performed |
2010-11-09 | Rig Released |
2010-11-09 | Well Mode changed to Drilled and Cased |
2010-11-12 | Well Log Performed |
2010-11-29 | Perforation Treatment Performed - Jet Perforation |
2010-12-07 | Perforation Treatment Performed - Fractured |
2011-01-07 | Well Began Production |
2011-01-07 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-01-07 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-11-29 | Perforation | 423.00 | 423.50 | 13 |
2010-11-29 | Perforation | 547.50 | 549.00 | 13 |
2010-11-29 | Perforation | 332.10 | 333.10 | 13 |
2010-11-29 | Perforation | 431.50 | 433.00 | 13 |
2010-11-29 | Perforation | 302.20 | 302.70 | 13 |
2010-11-29 | Perforation | 311.90 | 312.40 | 13 |
2010-11-29 | Perforation | 293.50 | 294.00 | 13 |
2010-11-29 | Perforation | 297.70 | 298.20 | 13 |
2010-11-29 | Perforation | 574.00 | 574.50 | 13 |
2010-11-29 | Perforation | 572.20 | 572.70 | 13 |
2010-11-29 | Perforation | 570.10 | 570.60 | 13 |
2010-11-29 | Perforation | 434.60 | 436.60 | 13 |
2010-11-29 | Perforation | 774.60 | 775.10 | 13 |
2010-11-29 | Perforation | 583.40 | 583.90 | 13 |
2010-11-29 | Perforation | 582.30 | 582.80 | 13 |
2010-11-29 | Perforation | 586.00 | 586.50 | 13 |
2010-11-29 | Perforation | 565.90 | 566.90 | 13 |
2010-11-29 | Perforation | 537.70 | 538.70 | 13 |
2010-11-29 | Perforation | 498.50 | 501.00 | 13 |
2010-11-29 | Perforation | 520.80 | 521.80 | 13 |
2010-11-29 | Perforation | 523.80 | 524.80 | 13 |
2010-11-29 | Perforation | 554.50 | 555.50 | 13 |
2010-11-29 | Perforation | 320.30 | 320.80 | 13 |
2010-11-29 | Perforation | 551.40 | 552.90 | 13 |
2010-11-29 | Perforation | 539.40 | 539.90 | 13 |
2010-12-07 | Fracture | 531.50 | 534.50 | 0 |
2010-12-07 | Fracture | 547.50 | 549.00 | 0 |
2010-12-07 | Fracture | 332.10 | 333.10 | 0 |
2010-12-07 | Fracture | 565.90 | 566.90 | 0 |
2010-12-07 | Fracture | 582.30 | 586.50 | 0 |
2010-12-07 | Fracture | 440.30 | 524.80 | 0 |
2010-12-07 | Fracture | 293.50 | 320.80 | 0 |
2010-12-07 | Fracture | 419.90 | 423.50 | 0 |
2010-11-29 | Perforation | 419.90 | 420.40 | 13 |
2010-11-29 | Perforation | 449.70 | 450.20 | 13 |
2010-11-29 | Perforation | 477.20 | 478.20 | 13 |
2010-11-29 | Perforation | 440.30 | 440.80 | 13 |
2010-11-29 | Perforation | 445.10 | 445.60 | 13 |
2010-11-29 | Perforation | 531.50 | 534.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 8602 | 0.0 | 0.0 | 0.0 |
2012 | 8668 | 0.0 | 0.0 | 0.0 |
2013 | 8751 | 0.0 | 0.0 | 0.0 |
2014 | 8734 | 0.0 | 0.0 | 0.0 |
2015 | 8749 | 0.0 | 0.0 | 0.0 |
2016 | 8782 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]