X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304251905000

Well Details

Well ID: 0304251905000
Loading map...
Location: 00/05-19-030-25W4/0
Location Alias: 00/05-19-30-25 W4M
Location Alias 2: 00/05-19-030-25 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 25
Section: 19
County/Municipality: Kneehill County
Well Name: EMBER TWINING 5-19-30-25
Operator Name: Ember Resources Inc.
License Number: 0422376
License Date: 2010-08-04
License Status: Issued
Spud Date: 2010-10-11
Final Drill Date: 2010-10-13
Well Total Depth: 933.00 m
Surface Hole Latitude: 51.582856
Surface Hole Longitude: -113.515941

For data sources see[1][2]

Well History

Date Event
2010-08-04 Obtained License
2010-10-12 Surface Casing Operation Performed
2010-10-13 Finished Drilling
2010-10-13 Production Casing Operation Performed
2010-10-13 Rig Released
2010-10-13 Well Mode changed to Drilled and Cased
2010-10-18 Well Log Performed
2010-10-30 Perforation Treatment Performed - Jet Perforation
2010-11-05 Perforation Treatment Performed - Jet Perforation
2010-11-10 Perforation Treatment Performed - Fractured
2010-11-13 Well Fluid changed to Coalbed Methane-Coals and Other
2010-11-13 Well Mode changed to Testing
2011-03-01 Well Began Production
2011-03-01 Well Fluid changed to Coalbed Methane-Coals and Other
2011-03-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-10-30 Perforation 743.00 744.00 13
2010-11-05 Perforation 425.70 426.20 13
2010-11-05 Perforation 550.20 551.20 13
2010-11-05 Perforation 505.00 506.00 13
2010-11-05 Perforation 344.50 345.50 13
2010-11-05 Perforation 237.40 237.90 13
2010-11-05 Perforation 321.00 322.00 13
2010-11-05 Perforation 304.40 304.90 13
2010-11-05 Perforation 301.00 301.50 13
2010-11-05 Perforation 580.10 580.60 13
2010-11-05 Perforation 576.30 576.80 13
2010-10-30 Perforation 891.00 892.00 13
2010-11-05 Perforation 573.60 574.60 13
2010-11-05 Perforation 588.50 589.50 13
2010-11-05 Perforation 591.30 591.80 13
2010-11-05 Perforation 592.30 592.80 13
2010-11-05 Perforation 626.00 626.50 13
2010-11-05 Perforation 527.50 528.50 13
2010-11-05 Perforation 538.10 539.10 13
2010-11-05 Perforation 499.80 501.80 13
2010-11-05 Perforation 525.00 526.00 13
2010-11-05 Perforation 559.70 560.70 13
2010-11-05 Perforation 434.50 436.00 13
2010-11-05 Perforation 555.60 557.10 13
2010-11-05 Perforation 569.70 571.20 13
2010-11-10 Fracture 344.50 345.50 0
2010-11-10 Fracture 505.00 506.00 0
2010-11-10 Fracture 550.20 551.20 0
2010-11-10 Fracture 569.70 580.60 0
2010-11-10 Fracture 588.50 626.50 0
2010-11-10 Fracture 525.00 539.10 0
2010-11-10 Fracture 237.40 322.00 0
2010-11-10 Fracture 425.70 501.80 0
2010-11-05 Perforation 433.40 434.40 13
2010-11-05 Perforation 429.70 430.20 13
2010-11-05 Perforation 439.10 439.60 13
2010-11-05 Perforation 477.20 478.20 13
2010-11-05 Perforation 449.10 449.60 13
2010-11-05 Perforation 441.20 441.70 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 24 0.0 0.0 0.0
2011 7327 0.0 0.0 0.0
2012 8645 0.0 0.0 0.0
2013 8694 0.0 0.0 0.0
2014 8685 0.0 0.0 0.0
2015 8546 0.0 0.0 0.0
2016 8644 0.0 0.0 0.0
2017 8582 0.0 0.0 0.0
2018 8604 0.0 0.0 0.0
2019 8672 0.0 0.0 0.0
2020 2156 0.0 0.0 0.0

For data sources see[5]

References