If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0304251814000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.570034,"lon":-113.514598,"icon":""}]} |
Location: 00/14-18-030-25W4/0 | |
Location Alias: 00/14-18-30-25 W4M | |
Location Alias 2: 00/14-18-030-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 030 | |
Meridian: 4 | |
Range: 25 | |
Section: 18 | |
County/Municipality: Kneehill County | |
Well Name: EMBER SD TWINING 14-18-30-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0423274 | |
License Date: 2010-09-07 | |
License Status: Issued | |
Spud Date: 2010-10-16 | |
Final Drill Date: 2010-10-17 | |
Well Total Depth: 1206.00 m | |
Surface Hole Latitude: 51.570034 | |
Surface Hole Longitude: -113.514598 |
Date | Event |
---|---|
2010-09-07 | Obtained License |
2010-10-16 | Direction Drilling Operation Performed - Deviate |
2010-10-16 | Surface Casing Operation Performed |
2010-10-17 | Finished Drilling |
2010-10-17 | Production Casing Operation Performed |
2010-10-17 | Rig Released |
2010-10-17 | Well Mode changed to Drilled and Cased |
2010-10-20 | Well Log Performed |
2010-11-25 | Perforation Treatment Performed - Jet Perforation |
2010-11-30 | Perforation Treatment Performed - Fractured |
2010-12-03 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-12-03 | Well Mode changed to Testing |
2011-03-02 | Well Began Production |
2011-03-02 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-03-02 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-10-16 | 141.80 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-11-25 | Perforation | 659.40 | 660.40 | 13 |
2010-11-25 | Perforation | 693.10 | 693.60 | 13 |
2010-11-25 | Perforation | 711.30 | 712.30 | 13 |
2010-11-25 | Perforation | 730.00 | 731.50 | 13 |
2010-11-25 | Perforation | 410.10 | 410.60 | 13 |
2010-11-25 | Perforation | 415.80 | 416.30 | 13 |
2010-11-25 | Perforation | 428.20 | 428.70 | 13 |
2010-11-25 | Perforation | 329.00 | 329.50 | 13 |
2010-11-25 | Perforation | 406.90 | 407.40 | 13 |
2010-11-25 | Perforation | 408.10 | 408.60 | 13 |
2010-11-25 | Perforation | 574.40 | 577.90 | 13 |
2010-11-25 | Perforation | 661.00 | 661.50 | 13 |
2010-11-25 | Perforation | 582.20 | 582.70 | 13 |
2010-11-25 | Perforation | 595.00 | 595.50 | 13 |
2010-11-25 | Perforation | 434.60 | 435.10 | 13 |
2010-11-25 | Perforation | 488.60 | 489.10 | 13 |
2010-11-25 | Perforation | 568.40 | 568.90 | 13 |
2010-11-25 | Perforation | 752.90 | 753.90 | 13 |
2010-11-25 | Perforation | 664.90 | 665.90 | 13 |
2010-11-25 | Perforation | 666.30 | 667.30 | 13 |
2010-11-25 | Perforation | 551.40 | 552.40 | 13 |
2010-11-25 | Perforation | 546.40 | 547.40 | 13 |
2010-11-25 | Perforation | 689.90 | 691.40 | 13 |
2010-11-25 | Perforation | 548.90 | 550.40 | 13 |
2010-11-25 | Perforation | 796.90 | 797.40 | 13 |
2010-11-25 | Perforation | 1038.00 | 1039.50 | 13 |
2010-11-25 | Perforation | 723.80 | 727.30 | 13 |
2010-11-25 | Perforation | 709.20 | 710.20 | 13 |
2010-11-25 | Perforation | 721.50 | 723.00 | 13 |
2010-11-25 | Perforation | 774.50 | 775.00 | 13 |
2010-11-25 | Perforation | 777.00 | 778.00 | 13 |
2010-11-25 | Perforation | 780.00 | 780.50 | 13 |
2010-11-25 | Perforation | 761.70 | 762.20 | 13 |
2010-11-25 | Perforation | 630.30 | 630.80 | 13 |
2010-11-25 | Perforation | 762.60 | 763.10 | 13 |
2010-11-25 | Perforation | 755.60 | 756.10 | 13 |
2010-11-25 | Perforation | 773.30 | 774.30 | 13 |
2010-11-25 | Perforation | 784.70 | 785.20 | 13 |
2010-11-30 | Fracture | 329.00 | 489.10 | 0 |
2010-11-30 | Fracture | 730.00 | 736.10 | 0 |
2010-11-30 | Fracture | 568.40 | 661.50 | 0 |
2010-11-30 | Fracture | 689.90 | 693.60 | 0 |
2010-11-30 | Fracture | 711.30 | 712.30 | 0 |
2010-11-30 | Fracture | 796.90 | 797.40 | 0 |
2010-11-25 | Perforation | 631.30 | 632.80 | 13 |
2010-11-30 | Fracture | 721.50 | 727.30 | 0 |
2010-11-30 | Fracture | 709.20 | 710.20 | 0 |
2010-11-30 | Fracture | 773.30 | 785.20 | 0 |
2010-11-30 | Fracture | 664.90 | 667.30 | 0 |
2010-11-30 | Fracture | 546.40 | 552.40 | 0 |
2010-11-25 | Perforation | 653.60 | 654.60 | 13 |
2010-11-25 | Perforation | 735.80 | 737.30 | 13 |
2010-11-25 | Perforation | 746.80 | 747.30 | 13 |
2010-11-25 | Perforation | 748.50 | 749.50 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 24 | 0.0 | 0.0 | 0.0 |
2011 | 7304 | 0.0 | 0.0 | 0.0 |
2012 | 8645 | 0.0 | 0.0 | 0.0 |
2013 | 8694 | 0.0 | 0.0 | 0.0 |
2014 | 8685 | 0.0 | 0.0 | 0.0 |
2015 | 8546 | 0.0 | 0.0 | 0.0 |
2016 | 8667 | 0.0 | 0.0 | 0.0 |
2017 | 8582 | 0.0 | 0.0 | 0.0 |
2018 | 8604 | 0.0 | 0.0 | 0.0 |
2019 | 8673 | 0.0 | 0.0 | 0.0 |
2020 | 2156 | 0.0 | 0.0 | 0.0 |
For data sources see[6]